For a Proper experience on Trainspy.com, enable JavaScript in your browser

Train Search








43 Trains from (NNU)NANGAL MUNDI to (RE)REWARI


Address: Village Nangal Mundi State Highway 24 Haryana

Station Code: NNU

Station Name: Nangal Mundi

Zone: NWR/North Western

Train Frequency Weekly: 97

Station Traffic: Medium

Address: Rewari, Haryana 123110, India

Station Code: RE

Station Name: REWARI

Zone: NWR/North Western

Train Frequency Weekly: 579

Station Traffic: High





Trains
To Check Ticket Availibility Click Classes
TrainTrain NameFromDepToArrTimeDaysClassesStatus
54781BTI RE PASSKSI00:03RE01:151:12M,TU,W,TH,F,SA,SUUNRESERVED54781 Status
59729SIKR RE PASSNNU00:44RE02:001:16M,TU,W,TH,F,SA,SUUNRESERVED59729 Status
54833JP HSR PASSKGBS00:53JTS01:020:09M,TU,W,TH,F,SA,SUSL,GN,54833 Status
54834HSR JP PASSKSI01:29RE02:501:21M,TU,W,TH,F,SA,SUSL,GN,54834 Status
14022SAINIK EXPRESSDZB02:37RE04:001:23W,F,SU2A,3A,SL,GN,14022 Status
54784RE FKA PASSKGBS04:52JTS05:020:10M,TU,W,TH,F,SA,SUUNRESERVED54784 Status
54413DLI RE PASSKIP05:19RE05:450:26M,TU,W,TH,F,SA,SUUNRESERVED54413 Status
54767SGNR TKJ PASSNNU05:20RE05:550:35M,TU,W,TH,F,SA,SUSL,GN,54767 Status
54012SDLP TKJ PASSNNU05:26RE05:550:29M,TU,W,TH,F,SA,SUUNRESERVED54012 Status
74004NMK DLI PASSKWMD05:39KIP05:440:05M,TU,W,TH,F,SA,SUUNRESERVED74004 Status
54792BNW MTJ PASSKSI05:51RE06:551:04M,TU,W,TH,F,SA,SUUNRESERVED54792 Status
54309DLI RE PASSKIP07:24KWMD07:300:06M,TU,W,TH,F,SA,SUUNRESERVED54309 Status
54787BNW RE PASSKSI07:54RE08:450:51M,TU,W,TH,F,SA,SUUNRESERVED54787 Status
54310RE DLI PASSNNU08:25RE09:000:35M,TU,W,TH,F,SA,SUUNRESERVED54310 Status
54085DLI RE PASSKIP09:07RE09:350:28M,TU,W,TH,F,SA,SUUNRESERVED54085 Status
54835HSR RE PASSKSI09:11RE10:100:59M,TU,W,TH,F,SA,SUUNRESERVED54835 Status
54782RE BTI PASSKGBS09:28JTS09:370:09M,TU,W,TH,F,SA,SUUNRESERVED54782 Status
79701JP HSR PASSKGBS10:43JTS10:520:09M,TU,W,TH,F,SA,SUUNRESERVED79701 Status
54752SGNR RE PASSKSI10:48RE12:001:12M,TU,W,TH,F,SA,SUUNRESERVED54752 Status
54086RE DLI DMUKWMD11:19KIP11:240:05M,TU,W,TH,F,SA,SUUNRESERVED54086 Status
54412MUT RE PASSKIP11:19RE12:100:51M,TU,W,TH,F,SA,SUUNRESERVED54412 Status
59727SIKR RE PASSNNU12:26RE13:451:19M,TU,W,TH,F,SA,SUUNRESERVED59727 Status
54751RE SGNR PASSKGBS13:03JTS13:120:09M,TU,W,TH,F,SA,SUUNRESERVED54751 Status
54416RE DLI PASSKWMD13:19KIP13:240:05M,TU,W,TH,F,SA,SUUNRESERVED54416 Status
54421DLI RE PASSKIP13:21RE14:150:54M,TU,W,TH,F,SA,SUUNRESERVED54421 Status
54810JU RE PASSNNU14:00RE14:450:45M,TU,W,TH,F,SA,SUUNRESERVED54810 Status
54411RE MUT PASSKWMD15:04KIP15:090:05M,TU,W,TH,F,SA,SUUNRESERVED54411 Status
74003DLI RE PASSKIP15:43RE16:150:32M,TU,W,TH,F,SA,SUUNRESERVED74003 Status
79702HSR JP PASSKSI16:23RE17:200:57M,TU,W,TH,F,SA,SUUNRESERVED79702 Status
74002RE DLI PASSKWMD17:09KIP17:140:05M,TU,W,TH,F,SA,SUUNRESERVED74002 Status
54836RE HSR PASSKGBS17:58JTS18:070:09M,TU,W,TH,F,SA,SUUNRESERVED54836 Status
14811SIKR DEE EXPRESSDZB18:15RE19:000:45W,F1A,2A,3A,SL,2S,GN,14811 Status
54417DLI RE PASSKIP18:16RE18:400:24M,TU,W,TH,F,SA,SUUNRESERVED54417 Status
54791MTJ BNW PASSKGBS19:03JTS19:120:09M,TU,W,TH,F,SA,SUUNRESERVED54791 Status
14659RUNICHA EXPRESSKIP19:13RE19:430:30M,TU,W,TH,F,SA,SU1A,2A,3A,SL,GN,14659 Status
54316HSR SDLP RE PASSNNU19:14RE19:500:36M,TU,W,TH,F,SA,SUUNRESERVED54316 Status
54420RE DLI PASSKWMD19:34KIP19:390:05M,TU,W,TH,F,SA,SUUNRESERVED54420 Status
54783FKA RE PASSKSI19:46RE20:501:04M,TU,W,TH,F,SA,SUUNRESERVED54783 Status
54011TKJ SDLP PASSKIP20:16RE20:450:29M,TU,W,TH,F,SA,SUUNRESERVED54011 Status
54768TKJ SGNR PASSKIP20:17RE20:450:28M,TU,W,TH,F,SA,SUSL,GN,54768 Status
54788RE BNW PASSKGBS21:58JTS22:060:08M,TU,W,TH,F,SA,SUUNRESERVED54788 Status
74001DLI NMK PASSKIP22:02RE22:300:28M,TU,W,TH,F,SA,SUUNRESERVED74001 Status
54790BKN RE PASSNNU22:10RE22:500:40M,TU,W,TH,F,SA,SUUNRESERVED54790 Status
Train Type Train Table Info
SuperFast
Click On Function
Headers Sort-
Background Colour Code
Train No Detail Information About Train on new tab
Train Name Route Time Table & Fare of Train 
From & To Detail Information About Station on new tab
Classes Ticket Availibility
Mail/Express
Rajdhani
Shatabdi
Janshatabdi
Garibrath/Yuva
Duronto
Spl Tourism Trains






RECENT NEWS

1
272/2021-22 08-07-2021
Chennai
REVISED TIMING OF SPECIAL TRAINS


The timing of the Train No. 06627 Dr. MGR Chennai Central – Mangalore Central Daily Superfast Special train is revised with effect from journey commencing o­n 01st August, 2021 as detailed below.

Revised timings of Train No. 06627 Dr. MGR Chennai Central – Mangalore Central Daily Superfast Special train with effect from journey commencing o­n 01.8.2021.


Station

¯

Train No. 06627 Dr. MGR Chennai Central – Mangalore Central Daily Superfast Special train

Dr. MGR Chennai Central

    (d)

13.15

Arakkonam

(a/d)

14.23/14.25

Walajah Road

(a/d)

14.53/14.55

Katpadi jn

(a/d)

15.25/15.30

Jolarpettai

(a/d)

16.48/16.50

Tirupattur jn

(a/d)

16.59/17.00

Morappur

(a/d)

17.34/17.35

Bommidi

(a/d)

17.54/17.55

Salem jn

(a/d)

18.32/18.35

Sankaridrug

(a/d)

19.14/19.15

Erode

(a/d)

19.40/19.45

Tiruppur

(a/d)

20.28/20.30

Coimbatore

(a/d)

21.27/21.30

Podanur jn

(a/d)

21.44/21.45

Palghat

(a/d)

22.52/22.55

Ottappalam

(a/d)

23.19/23.20

Shoranur jn

(a/d)

23.45/23.50

Kuttippuram

(a/d)

00.17/00.18

Tirur

(a/d)

00.32/00.33

Parpanangadi

(a/d)

00.46/00.47

Calicut

(a/d)

01.12/01.15

Vadakara

(a/d)

01.51/01.52

Tellicherry

(a/d)

02.14/02.15

Kannur

(a/d)

02.37/02.40

Payyanur

(a/d)

03.04/03.05

Nileshwar

(a/d)

03.24/03.25

Kanhangad

(a/d)

03.34/03.35

Kasaragod

(a/d)

03.54/03.55

Mangalore Central

     (a)

05.30

 

                                                                                                            

Follow us:

www.sr.indianrailways.gov.in

https://twitter.com/GMSRailway

https://www.facebook.com/Southern-Railway-240606622749869

Appeal: All passengers travelling by trains are requested to adhere to COVID19 protocols and carry essential documents as per norms issued by the respective state governments from time to time.




(B.Guganesan)
Chief Public Relations Officer




2
   

SOUTH CENTRAL RAILWAY
PRESS RELEASE
PUBLIC RELATIONS OFFICE, SECUNDERABAD - 500 071
No.239/2020-2101-07-2021
Secunderabad
Indian Railways successfully completes work on the Valsad Road Over Bridge (ROB) on Dedicated Freight Corridor in a record 20 day time.


The biggest challenge in doing this work was road traffic block, as this ROB is o­ne of the busiest passages into the city of Valsad from Mumbai-Delhi highway.

Work o­n Freight Corridor proceeds o­n inspite of Covid challenges that came in the way.

Indian Railways’ PSU, Dedicated Freight Corridor Corporation of India (DFCCIL) has completed work of dismantling and reconstruction (after making way for DFC tracks) of Valsad Road Over Bridge (ROB) o­n the Western Dedicated Freight Corridor in the state of Gujarat in a record 20 day time.

Working in tandem with various Government agencies and the civil administration, the ROB which funnels busy traffic into Valsad ROB from the Mumbai-Delhi highway, a 20 day traffic block was secured o­n 02.06.2021 for dealing with this challenge.

Background:

Work in Western DFC’s Vaitarana – Sachin section faced a bottleneck of crossing a ROB near Valsad Town in South Gujarat. The ROB work could not be started due to various limitations and track laying activities would have been adversely affected. Track laying projects using state of the art New Track Construction (NTC) machine, would have been affected.

The Solution:

The project team geared up to take up this challenge. After many brainstorming sessions, an innovative solution was arrived at. The solution proposed was to insert a Twin precast box of 16m x 10m size o­n the approach of the ROB to take the NTC forward through it. The biggest challenge in doing this work was road traffic block, as this ROB is o­ne of the busiest passages into the city of Valsad from Mumbai-Delhi highway. The whole work is planned to be completed in 20 days road traffic block.

Extensive arrangements were made for pre-casting of these huge segments. Despite lock-downs and travel restrictions, a team of approximately 150 nos, including senior engineers toiled day & night to finish the casting works. Road traffic block was granted by the district administration of Valsad, responding favorably to the proposal.

The road traffic block of 20 days commenced o­n 02-06-2021 and the work is progressing as per planning. Four heavy duty hydraulic cranes having capacity varying from 300 MT to 500 MT are mobilized for the installation of these segments. Another challenge that was difficult to handle was solved by innovation in local handling of the segments. The precast segments are too big & heavy to

handle without causing any internal stresses during handling. The Project Team has designed a special carrier using a multi-axle trailer fitted with a steel platform o­n it. The fabrication of the steel platform was completely done at site even during the period when the industrial oxygen supply was prohibited in the country. The team could overcome all such constraints by continuously striving for alternatives and by taping the collective wisdom & experience of the team.

It may be noted that the Western Corridor connecting Dadri in Uttar Pradesh to Jawaharlal Nehru Port (JNPT) in Mumbai will traverse through the states of UP, Haryana, Rajasthan, Gujarat and Maharashtra of WDFC & EDFC.

WDFC’s 306 km Rewari - Madar section was dedicated to the nation o­n 07.01.2021. Trial run of 369 km of WDFC between New Palanpur to New Kishangarh has been done. EDFC’s 351 km New Bhaupur - New Khurja section and the Operation Control Centre at Prayagraj were dedicated to the nation by the Hon’ble PM o­n 29.12.2020. A total of approx. 2800 route Km of the whole WDFC and EDFC (excluding the Sonnagar – Dankuni PPP section) will be commissioned by June 2022.

In the commissioned sections, a total of more than 4000 trains have been run. In Eastern DFC, it has more than 3000 trains and in WDFC more than 1000 trains. Total GTKM has crossed the 3 million ton mark. Some of the trains in the section are achieving an average speed of 99.38 kmph in EDFC and 92 kmph in WDFC. These speeds are comparable to any of the fastest mail express trains.






COMMENTS

NO Comments. Be the first to Comment...

Add Comment






Submit