For a Proper experience on Trainspy.com, enable JavaScript in your browser

Train Search








2 Trains from (MTC)MEERUT CITY to (fzd)firozabad


Address: Meerut, Uttar Pradesh, India

Station Code: MTC

Station Name: MEERUT CITY

Zone: NR/Northern

Train Frequency Weekly: 372

Station Traffic: High

Address: Firozabad, Uttar Pradesh, India

Station Code: FZD

Station Name: FIROZABAD

Zone: NCR/North Central

Train Frequency Weekly: 227

Station Traffic: High





Trains
To Check Ticket Availibility Click Classes
TrainTrain NameFromDepToArrTimeDaysClassesStatus
22432UHP ALD EXPMTC04:25TDL08:584:33W,SU2A,3A,SL,GN,22432 Status
14164SANGAM EXPMTC19:00FZD00:385:38M,TU,W,TH,F,SA,SU2A,3A,SL,GN,14164 Status
Train Type Train Table Info
SuperFast
Click On Function
Headers Sort-
Background Colour Code
Train No Detail Information About Train on new tab
Train Name Route Time Table & Fare of Train 
From & To Detail Information About Station on new tab
Classes Ticket Availibility
Mail/Express
Rajdhani
Shatabdi
Janshatabdi
Garibrath/Yuva
Duronto
Spl Tourism Trains






RECENT NEWS

1
13-05-2020
To improve safety and operational efficiencies, North Central Railway completed many important works during this lockdown.

North Central Railway

Headquarter

Public Relations

Prayagraj

No. 11PR/05/2020Press ReleaseDate: 03.05.20

To improve safety and operational efficiencies, North Central Railway completed many important works during this lockdown.

Modern heavy-duty Track Maintenance Machines along with track, signal & Overhead Equipment (OHE) maintainers have worked regularly for 1089 machine days to complete overdue track maintenance of 766 km plain track &461 nos. of Turn outs.

A very important and critical work of "Shifting of 132 KV Double Circuit Dadri-Sahibabad transmission line due to infringement with GZB- Meerut RRTS (Regional Rapid Transit System) corridor of NCRTC" has been successfully executed

Apart from ensuring supply chains of all essential commodities runningthrough parcel trains and freight trains ,backend warriors of North Central Railway have successfully executed many important safety, important maintenance and operational efficiency work during this lockdown period with all precautions and social distancing etc .Some of the important works done by North Central Railway are as under:

·Modern heavy-duty Track Maintenance Machines along with track, signal & Overhead Equipment (OHE) maintainers have worked regularly for 1089 machine days to complete track maintenance of 766 km plain track &461nos. of Turn outs.

·Health of the track has been monitored through periodic runs of Oscillation Monitoring System (OMS) for 10796kms. of track and 26 peak locations were attended for safety and riding comfort .

·Ultrasonic flaw detection (USFD) of 4419kms of track and 1336 rail welds has been carried out with USFD machine for safety in train operation.

·Critical summer precaution activities like de-stressing of long welded rail (LWR)which involved huge men power has been taken up with a new procedure for carrying out the work with ensuring social distancing norms. 120kms of de-stressing of LWR has been done.

·To ensure safe running of freight and parcel rolling in examination involving visual inspection,temperature recording etc done in 2790 trains.

·To keep passenger coaches service ready 842 coaches maintained in washing line besides major attention in IOH shed in 55 coaches.

·More than 4000 signals, over 15000 track circuit/ axle counters and close to 5000-point machines were maintained for safe train operations.

·Integrity test of interlocking at station which ensures that all signalling gear are working as per designed logic and no unsafe movement is possible due to any human error in station panel operation. This important work done at 20 stations over NCR.

·For reliability improvement cable meggering to assess its health done for close to 20000 Kms cable length.

·Despite working with bare essential staff, foot patrolling of 10000 Km length OHE done and identified defects rectified.Similarly, over 2500 Km electrified section checked by tower wagon.

·Over 300 mandatory maintenance schedules of electric and diesel locomotives completed to run essential freight and parcel trains.

·321 CCTV, 444 public announcementsystems , 15 escalators , 6 lifts etc. were also maintained during this lockdown .

·A very important and critical work of "Shifting of 132 KV Double Circuit Dadri-Sahibabad transmission line due to infringement with GZB- Meerut RRTS (Regional Rapid Transit System) corridor of National Capital Region Transport Corporation (NCRTC)" has been successfully executedby TRD team of Prayagraj Division along with Delhi Division and NCRTC. To carry out this work, shutdown of both 132 KV lines was required. It was very difficult during normal traffic as Sahibabad Traction Substation (TSS) remains fully loaded during normal traffic and it feeds important lines in National Capital Region. Therefore, it was planned during lockdown period and successfully completed o­n 02.05.20.





2
28-04-2020
Arrangements and plan of action on North Central Railway to sustain and upscale essential goods and parcel services in extended lockdown period till 3rd May 2020

North Central Railway

Headquarter

Public Relations

Prayagraj

No. 11PR/04/2020Press ReleaseDate: 15.04.2020

Arrangements and plan of action o­n North Central Railway to sustain and upscale essential goods and parcel services in extended lockdown period till 3rdMay 2020

NCR registered highest improvement in average speed of Goods trains among all Zonal Railways - Will ensure fast transportation of essential goods during lockdown.

In continuation of the measures taken in the wake of COVID-19 , it has already been decided by Railway Board and communicated widely that the cancellation of all passenger train services o­n Indian Railways that is , all Mail/Express (including premium trains), passenger trains ,suburban trains and trains of Metro Railway , Kolkata shall be extended till 3rd May, 2020 ,for the cancelled trains, full refund of fares shall be arranged to the passengers , no advance reservation shall be done until further advice from Railway Board , levy of Demurrage , wharfageetc shall not arise in the period of 22.03.20 to 03.05.20 &freight and parcel trains will continue to run as at present . Besides above following efforts are being made o­n NCR for sustaining and upscaling essential goods & parcel train operations and mitigating chances of Corona Virus Spread.

Division/

Workshop

Reusable face covers

Sanitizer

Inhouse mask production (Nos)

Procured from market(Nos.)

Total(Nos)

Inhouse sanitizer production (in Lts)

Procured from market

(in litres)

Total (litres)

14.04.20

Cumulative

14.04.20

Cumulative

Prayagraj

5000

86397

96643

183040

0

4180

5584

9764

Jhansi

626

11891

13137

25028

0

600

1000

1600

Agra

180

10021

9096

19117

0

1332

1179

2511

Jhansi wagon repair shop

200

4276

4276

0

590

590

Coach midlife rehabilitation shop Jhansi

200

3650

3650

0

0

0

Rail Spring Karkhana Gwalior

0

0

0

670

670

COMMENTS
NO Comments. Be the first to Comment...

Add Comment






Submit