For a Proper experience on Trainspy.com, enable JavaScript in your browser

Train Search








6 Trains from (MS)CHENNAI EGMORE to (RMM)RAMESWARAM


Address: Chennai Egmore, Gandhi Irwin Road, Egmore, Chennai, Tamil Nadu 600008, India

Station Code: MS

Station Name: CHENNAI EGMORE

Zone: SR/Southern

Train Frequency Weekly: 400

Station Traffic: High

Address: Rameshwaram Railway Station, Rameshwaram, Tamil Nadu 623526, India

Station Code: RMM

Station Name: RAMESWARAM

Zone: SR/Southern

Train Frequency Weekly: 93

Station Traffic: Medium





Trains
To Check Ticket Availibility Click Classes
TrainTrain NameFromDepToArrTimeDaysClassesStatus
18496BBS RMM EXPRESSMS08:45RMM23:0014:15F2A,3A,SL,GN,18496 Status
15120MUV RMM EXPMS10:50RMM00:4513:55SU2A,3A,SL,GN,15120 Status
19603AII RMM HUMSAFARMS14:22RMM03:1512:53SA3A19603 Status
16794SHRADDHA SETHUMS17:30RMM07:1013:40W1A,2A,3A,SL,GN,16794 Status
22661RAMESWARAM EXPMS17:50RMM04:3510:45M,TU,W,TH,F,SA,SU2A,3A,SL,GN,22661 Status
16851RAMESWARAM EXPMS19:15RMM08:3513:20M,TU,W,TH,F,SA,SU1A,2A,3A,SL,GN,16851 Status
Train Type Train Table Info
SuperFast
Click On Function
Headers Sort-
Background Colour Code
Train No Detail Information About Train on new tab
Train Name Route Time Table & Fare of Train 
From & To Detail Information About Station on new tab
Classes Ticket Availibility
Mail/Express
Rajdhani
Shatabdi
Janshatabdi
Garibrath/Yuva
Duronto
Spl Tourism Trains






RECENT NEWS

1
727/2022-23 16-03-2023
Chennai
Update on Chennai Egmore Station Redevelopment Works


Update o­n Chennai Egmore Station Redevelopment Works


Chennai Division of Southern Railway has taken up Chennai Egmore Station redevelopment in order to offer a world-class ambience, futuristic infra and airport-like facilities for passengers. Tender was awarded for the redevelopment work in October, 2022 and now the work has begun and progressing at a steady pace.


Works executed Recently


·Demolition of Existing Quarters o­n Gandhi Irwin road side has been completed.


·Plate Load Test for Multi-level car parking (MLCP) o­n Gandhi Irwin (GI) road side and Parcel Office o­n Poonamallee High (PH) road side completed.


·Master Plan Validation completed

Other work in progress


·Project Management Site Office construction is in progress.


·Setting up of Batching plant in progress


·Barricading, dismantling and shifting of facilities to facilitate proposed demolition of various buildings are in progress


·Drilling of borehole for Geotechnical Investigation is in progress


·Telecom Exchange Shifting/Relocation work in progress


Works Executed So far

·Preliminary works such as Mapping and Topographical survey, drone survey, DGPS Survey, Traffic survey, tree inventory, joint inventory of movable and immovable assets completed


·Project management Services have commenced work.



·Right of way, which is a legal right to enter and carry out the work, has been provided to the EPC contractor for construction of MLCP o­n GI side, MLCP o­n PH side, Parcel Office o­n PH side, Residential Quarters at Teynampet, Arrival FOB, Parcel FOB, Arrival Concourse, PH Side Station building, Sub Station o­n GI SIde and Sub-station o­n PH side



·A series of meetings are held with the stakeholders of the project.

Chennai Egmore Railway Station Redevelopment


The work of Redevelopment of Chennai Egmore Railway station was awarded as EPC contract to M/s DEC Infrastructure and Projects India Private Limited, Hyderabad at a cost of Rs.734.91 Crores, setting a time frame of 36 months for completion of the project. M/s Tata Consulting Engineers Limited, Mumbai have been tasked with the work of Project Management services (PMS) at a cost of Rs.14.56 Crore.


Two terminals are proposed to be constructed, o­ne at the Gandhi Irwin Road Side and o­ne at the Poonamallee High Road side. The Terminal Buildings o­n both side are proposed as a G+3 structure with world class amenities like waiting lounge, ticketing area, commercial area and Roof plaza etc. Segregation of departing and arrival passengers, Parcel FOB, adequate Lifts and escalators are planned in this building. The proposed Multi-Level Car Parking o­n both GI side and PH side are proposed as G+5 structure with Commercial area, Car & Bike parking and Budgetary Hotel. The proposed Parcel office o­n PH side is proposed as G+2 structure with Parcel office and RMS.

             

Follow us

www.sr.indianrailways.gov.in

https://twitter.com/GMSRailway

https://www.facebook.com/Southern-Railway-240606622749869/



(B.Guganesan)
Chief Public Relations Officer




2
729/2022-23 16-03-2023
Chennai
Stoppage Time at Valliyur Station Increased for Express Trains


Stoppage Time at Valliyur Station Increased for Express Trains


The stoppage time at Valliyur Station for the following trains to be increased to 2 minutes with effect from 21st March, 2023 as given below:


Sl No.

Train No.

Old Timings (Arr/Dep)

New Timings (Arr/Dep)

01

Train No. 12633 Chennai Egmore – Kanniyakumari Superfast Express

04.24/04.25

04.23/04.25

02

Train No. 12634 Kanniyakumari – Chennai Egmore Superfast Express

18.34/18.35

18.33/18.35

03

Train No. 16823 Chennai Egmore – Kollam Ananthapuri Express

07.29/07.30

07.28/07.30

04

Train No. 16824 Kollam – Chennai Egmore Ananthapuri Express

18.59/19.00

18.58/19.00

05

Train No.16321 Nagercoil – Coimbatore Express

08.09/08.10

08.08/08.10

06

Train No. 16322 Coimbatore – Nagercoil Express

18.37/18.38

18.36/18.38

07

Train No. 16339 Mumbai CST – Nagercoil Express

08.51/08.52

08.50/08.52

08

Train No.16340 Nagercoil – Mumbai CST

06.47/06.48

06.46/06.48

      

Follow us

www.sr.indianrailways.gov.in

https://twitter.com/GMSRailway

https://www.facebook.com/Southern-Railway-240606622749869/



(B.Guganesan)
Chief Public Relations Officer





COMMENTS

NO Comments. Be the first to Comment...

Add Comment






Submit