For a Proper experience on Trainspy.com, enable JavaScript in your browser

Train Search








0 Trains from (KAL)KALLAL to (MQ)MANNARGUDI


Address: Kallal, Tamil Nadu 630305, India

Station Code: KAL

Station Name: KALLAL

Zone: SR/Southern

Train Frequency Weekly: 47

Station Traffic: Low

Address: Mannargudi, Tamil Nadu, India

Station Code: MQ

Station Name: MANNARGUDI

Zone: SR/Southern

Train Frequency Weekly: 57

Station Traffic: Medium





Trains
To Check Ticket Availibility Click Classes
Since no Direct Trains Try Nearest Via Stations
Nearest From (KAL)KALLAL
(tpj)tiruchchirapali 91Kms from (KAL)KALLAL
(tj)thanjavur 103Kms from (KAL)KALLAL
(mv)mayiladuturai j 163Kms from (KAL)KALLAL

Nearest From MQ
(tj)thanjavur 37Kms from (MQ)MANNARGUDI
(mv)mayiladuturai j 50Kms from (MQ)MANNARGUDI
(sy)sirkazhi 69Kms from (MQ)MANNARGUDI
Train Type Train Table Info
SuperFast
Click On Function
Headers Sort-
Background Colour Code
Train No Detail Information About Train on new tab
Train Name Route Time Table & Fare of Train 
From & To Detail Information About Station on new tab
Classes Ticket Availibility
Mail/Express
Rajdhani
Shatabdi
Janshatabdi
Garibrath/Yuva
Duronto
Spl Tourism Trains






RECENT NEWS

1
No.505/2019-2007-02-2020
Chennai
Thrust on Infra, Safety : Rail Doubling works in Southern Railway get a fillip in Budget 2020-21


Thrust o­n Infra, Safety : Rail Doubling works in Southern Railway get a fillip in Budget  2020-21

HIGHLIGHTS:

·Southern Railway has been granted an amount of Rs.3340 crore as budgetary allocation for the year 2020-2021 with a grant of Rs.1238 crore for doubling, Rs.175 crores towards gauge conversion ,  Rs.37 crores for traffic facilities and Rs.198 crores for passenger amenities.

·New projects at a cost of Rs. 4131 has been sanctioned towards doubling of Katpadi-Villupuram line, Salem-Karur-Dindigul line, Erode-Karur line and Chennai Beach- Chennai Egmore (4th line).  A sanction of Rs.280 crores for Chennai Beach – Chennai Egmore 4th line will help easing congestion in this section.

·With focus o­n Safety, for  elimination of level crossing gates an amount of Rs.880 crores have been sanctioned for new road over bridges and Road under bridges particularly o­n the Golden quadrilateral/diagonal routes (Chennai – Gudur/Chennai – Arakkonam – Renigunta).  This has the potential to increase the speed of trains.

·Replacement of Route relay interlocking (RRI) and A, B and C cabins at Jolarpettai has been allotted an outlay of Rs.6 crore.

·Provision of centralized traffic control in connection with modern train control system has been sanctioned at a cost of Rs.148 cr.  This will help in enhancing the line capacity and safety.

·Harnessing the benefits of technology for Safe train operations, provision of  indigenous train collision avoidance system o­n low density railway network has been sanctioned at a cost of Rs.468.9 cr.

·Under Passenger amenities head, a new work for an amount of Rs.150 crores towards minimum essential amenities with more focus o­n  facilities for divyangjan at stations across southern railway has been sanctioned. Rs.75 crores sanctioned towards soft upgrades at stations ( like improvement in station buildings, tall flags, steel benches, cover over platform, etc.)

 

1.Budgetary grant (BG) under various Plan heads

Plan Head

BG 2020-21 (In Rs.Crores)

11

New lines

     2.70

14

Gauge Conversion

175.18

15

Doubling

1238.10

including EBR (IF)

16

Traffic Facilities

 37.12

17

Computerisation

  7.03

21

Rolling Stock

106.59

29

Road Safety Work- Level Crossings

102.36

30

Road Safety Work-ROBs/RUBs

335.52

31

Track Renewals

      730.00

32

Bridge Works

        54.5

33

Signalling & Telecommunication works

105.06

36

Other Electrical work, incl. TRD

39.48

41

Machinery & Plant

         27.76

42

Workshop including PUs

55.04

51

Staff Welfare

63.96

53

Passenger Amenities

198.11

64

Other Specified work

53.34

65

Training/HRD

8.1

Grand Total

3340.00


2.Budget grant for some important o­ngoing work is as under:

Sl.No

Plan Head

Section

BG (In. Rs. Cr)

1.

New Line

Rameswaram-Dhanushkodi (17.2 Km)

    2.7       

2

Gauge Conversion

Mayiladuturai-Tiruvarur-Karaikudi   & Tiruturaipundi- Agastiyampalli

 (47.2 Km including Mannargudi-Needamangalam-Mannargudi-Pattukottai Line)

100.00

Madurai-Bodinayakkanur (90.41 Km)

  75.18

3.

Doubling

Chengalpattu-Villupuram (103 Km): Tambaram-Chengalpattu-3rd line by GC of existing MG line alongwith electrification (30Km)

 132.00

Kurruppanthura-Chingavanam

(26.54 km)

 88.00

Ambalapuzha-Haripad (18.13 km)

 13.95

Omalur-Metur dam- With electrification (29.03 km)

 56.85

Trivandrum-Kanyakumari (86.56 km)

133.5

Madurai-Maniyachi-Tuticorin (160 Km)

367.00

Maniyachi-Nagercoil (102 Km)

345.00

Netravati-Mangalore Central (1.5 Km)

  10.7

Salem-Magnesite-Omalur (11 Km)

  22.00

4

Traffic Facilities

Mangalore Central- Addl Platform lines

   3.00

3.Importance New Works sanctioned are as under:

Sl.No

P.Book item no.

Works

Sanctioned Cost (In Rs.Cr)

Doubling

1.

38

Katpadi-Villupuram (160.10 Km)

1601

2.

39

Salem-Karur-Dingigul (160 Km)

1600

3.

40

Erode-Karur (65 km)

  650

4.

41

Chennai Beach- Chennai Egmore (4.3 km)

  280

  Total (a)

4131

Traffic Facilities

1.

60

SR- Yard modification to improve speed, intermediate block hut and development of new coaching terminal (b)

22.51

Road Safety Works- Level Crossings

1.

101

SR-Engineering work at LCs (c )

20

Road Safety works- ROB/RUBs

1.

401

SR- ROB/RUB o­n Golden quadrilateral/diagonal routes

480

2
184/2019-2030-07-2019
CHENNAI
TEMPORARY STOPPAGE FOR TRAINS AT MELMARUVATHUR

In view of the ‘Aadipooram’ festival at Melmaruvathur, the following trains have been provided temporary stoppage of o­ne minute duration at Melmaruvathur from 02.08.2019 to 05.08.2019 (Four days) as explained below:

 

Sl. No.

 

Train No. & Name

Timings at

Melmaruvathur

Date of departure from origination station

 

1.

Train No.12653 Chennai Egmore – Tiruchchirappalli Rockfort express

 

00.59 / 01.00 hrs.

Ex. Chennai Egmore from 02.08.2019 to 05.08.2019

 

2.

Train No.12654 Tiruchchirappalli – Chennai Egmore Rockfort express

 

02.39 / 02.40 hrs.

Ex. Tiruchchirappalli from 01.08.2019 to 04.08.2019

 

3.

Train No.12635 Chennai Egmore – Madurai Vaigai express

 

15.04 / 15.05 hrs.

Ex. Chennai Egmore from 02.08.2019 to 05.08.2019

4.

Train No.12636 Madurai – Chennai Egmore Vaigai express

 

12.49 / 12.50 hrs.

Ex. Madurai

from 02.08.2019 to 05.08.2019

 

5.

Train No.12637 Chennai Egmore – Madurai Pandian express

 

23.04 / 23.05 hrs.

Ex. Chennai Egmore from 02.08.2019 to 05.08.2019

 

6.

Train No.12638 Madurai – Chennai Egmore Pandian express

 

02.54 / 02.55 hrs.

Ex. Madurai

from 01.08.2019 to 04.08.2019

 

7.

Train No.12661 Chennai Egmore – Sengottai Podhigai express

 

22.24 / 22.25 hrs.

Ex. Chennai Egmore from 02.08.2019 to 05.08.2019

8.

Train No.12662 Sengottai – Chennai Egmore Podhigai express

 

04.04 / 04.05 hrs.

Ex. Sengottai

from 01.08.2019 to 04.08.2019

 

9.

Train No.16179 Chennai Egmore – Mannargudi Mannai express

 

22.44 / 22.45 hrs.

Ex. Chennai Egmore from 02.08.2019 to 05.08.2019

 

10.

Train No.16180 Mannargudi – Chennai Egmore Mannai express

 

03.49 / 03.50 hrs.

Ex. Mannargudi

from 01.08.2019 to 04.08.2019

 

11.

Train No.16191 Tambaram – Nagercoil Antyodaya express

 

23.54 / 23.55 hrs.

Ex. Tambaram

from 02.08.2019 to 05.08.2019

12.

Train No.16192 Nagercoil – Tambaram Antyodaya express

 

05.43 / 05.44 hrs.

Ex. Nagercoil

from 01.08.2019 to 04.08.2019

 

 


 

Follow us

www.sr.indianrailways.gov.in

https://twitter.com/GMSRailway

https://www.faceook.com/Southern-Railway-240606622749869



(P.A. Dhananjayan)
Chief Public Relations Officer





COMMENTS

NO Comments. Be the first to Comment...

Add Comment






Submit