3 Trains from (GGN)GURGAON to (kne)kishanganj
Address: 122006, India
Station Code: GGN
Station Name: GURGAON
Zone: NR/Northern
Train Frequency Weekly: 401
Station Traffic: High
Address: Kishanganj, Bihar, India
Station Code: KNE
Station Name: KISHANGANJ
Zone: NFR/Northeast Frontier
Train Frequency Weekly: 357
Station Traffic: High
Trains
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
To Check Ticket Availibility Click Classes | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
RECENT NEWS
1
www.sr.indianrailways.gov.in- 2023-05-25
Southern Railway has taken up Katpadi Station redevelopment in order to offer a world-class ambience, futuristic infra and airport-like facilities for passengers. Tender was awarded for the redevelopment in September 2022 and the redevelopment work is progressing at a steady pace. Works executed recently ·Architectural & structural drawing of Phase-I & Phase II buildings. ·Environment monitoring survey completed. ·GRIHA rating for Katpadi station Redevelopment work. ·Project Management Site Office construction completed. ·Staff quarters footing work completed. Other works in progress ·Site laboratory & mess construction work in progress. ·Setting up of a Batching plant in progress. ·Architectural & structural Design of the Station Buildings, Multi-level Car Parking, Multi-level Two-wheeler Parking, Foot-Over-Bridge, Air-Concourse & other buildings in progress. ·Staff quarters foundation backfilling in progress. ·Site cleaning & Marking for Scout, Artesian, RPF barrack in progress. Works executed So far ·Master Plan Validation completed. ·Traffic Survey work completed. ·Utility Scanning completed. ·Preliminary works such as Mapping and Topographical survey, drone survey, DGPS Survey, Traffic survey, tree inventory, joint inventory of movable and immovable assets. ·All kind of Soil test (Geotechnical investigation) completed at various locations. ·Project management Services have commenced work. ·Site clearance work completed for building locations for Phase-I & Phase II. ·Right of way, which is a legal right to enter and carry out the work, has been provided to the EPC contractor for construction of Phase-I building for Staff quarters (Type-II - 16 units, 2 blocks), Barrack and Scout, P- way and Signal Warehouse, SSE Tele/Signal yard space, Gang tool cum Restroom Artisans room, Parcel/RMS office and Elevated trolley path, MLCP/MLTP and PWAY shed, Sump, STP , Solid waste management System including incinerator, External Service, Departure Air Concourse & Departure terminal building. ·On a regular basis project review meetings are held with the stakeholders of the project. ·Fabrication of Sign boards & barricades completed. Katpadi (KPD) Station Redevelopment works The work of redevelopment of Katpadi Railway station was awarded as EPC contract to M/s Engineering Projects (India) Ltd, Chennai at a cost of Rs. 329.32 Crore, setting a time frame of 36 months from D Date, i.e. from 01-12-2022, for completion of the project. M/sVoyants Solutions Pvt Ltd, Gurgaon have been tasked with the work of Project Management services (PMS) at a cost of Rs.7.89 Crore. Two terminals (Arrival & Departure) are proposed to be constructed in the southern side, connected by Air concourses while arrival & departure lobby will be constructed in the Northern side. The Terminal Buildings will be equipped with world class amenities like waiting lounge, ticketing area, commercial area and Roof plaza etc. Elevated skywalks and subways with adequate lifts/escalators will connect both of these terminals to the bus stand thus enabling hassle-free inter-modal connectivity. A dedicated space for handling parcels will also be constructed.
Follow us (B.Guganesan) Chief Public Relations Officer 2
www.nfr.indianrailways.gov.in- 2023-05-19
Maligaon, 17th May, 2023: Northeast Frontier Railway (NFR) has been continuously striving to provide a safer, faster and more comfortable travelling experience to the people of the North Eastern region. For that the conventional ICF model rake of train no. 02502/02501 (Agartala – Kolkata - Agartala) special has been converted to a fully Air Conditioned LHB (Linke Hofmann Busch)rake. The train with LHB coaches was flagged off on 17th May, 2023 from Agartala Railway Station at 07:30 hrs by Kumari Pratima Bhoumik, Hon’ble Union Minister of State for Social Justice and Empowerment. Shri Prem Ranjan Kumar, Divisional Railway Manager, Lumding along with other senior officials of division were also present at Agartala Railway Station during the flagging off ceremony. The train no. 02502 (Agartala - Kolkata) special will depart from Agartala on every Wednesday for eight trips from 17th May to 05thJuly, 2023 at 07:30 hours to reach Kolkata at 15:00 hours on the next day. In return direction, train no. 02501 (Kolkata – Agartala) special will depart from Kolkata on every Sunday for eight trips from 21st May to 09thJuly, 2023 at 21:40 hours to reach Agartala at 05:15 hours on Tuesday. During it’s both ways journey, the special train will run via New Karimganj Jn., New Haflong, Guwahati, Goalpara Town, New Alipurduar, New Jalpaiguri Jn, Kishanganj, Malda Town, Azimganj Jn and Bandel Jn. The train will run with a revised composition consisting of 13 LHB coaches. It will have eleven state of the art AC-3 Economy Class coaches for the convenience of the passengers with two Luggage cum Generator coaches. The newly converted coaches will be of LHB rake with AC-3 Economy coaches which is safer and more comfortable as compared to the earlier ICF coaches. These coaches have improved and modular design of seats and berth. The AC-3 Economy has 2 side berths, making it a total of 8 berths per compartment, thereby leading to increased number of seats. Moreover, the fare structure for AC-3 Economy is roughly 8% lesser than 3 AC coaches. So, passengers can travel in much cheaper than 3 AC coaches. Further, the services of train no. 02518/02517 (Guwahati – Kolkata – Guwahati) has been extended for another eight trips. The train no. 02518 (Guwahati - Kolkata) special will depart from Guwahati on every Saturday for eight trips from 20th May to 08th July, 2023 at 21:00 hours to reach Kolkata at 15:00 hours on the next day. In return direction, train no. 02517 (Kolkata – Guwahati) special will depart from Kolkata on every Thursday for eight trips from 18th May to 06th July, 2023 at 21:40 hours to reach Guwahati at 16:15 hours on the next day. The details of stoppages and timings of these trains are available at IRCTC website and through NTES and are also being notified in various newspapers and social media platforms of N.F. Railway. Passengers are requested to verify the details before undertaking their journey. (Sabyasachi De) CPRO/N.F.Railway |