For a Proper experience on Trainspy.com, enable JavaScript in your browser

Train Search








12 Trains from (AAM)ANGADIPPURAM to (LDY)LAKKITI


Address: Railway Station Road, Angadipuram, Kerala 679321, India

Station Code: AAM

Station Name: ANGADIPPURAM

Zone: SR/Southern

Train Frequency Weekly: 85

Station Traffic: Medium

Address: Lakkidi, Palakkad Kerala

Station Code: LDY

Station Name: Lakkiti

Zone: SR/Southern

Train Frequency Weekly: 57

Station Traffic: Medium





Trains
To Check Ticket Availibility Click Classes
TrainTrain NameFromDepToArrTimeDaysClassesStatus
56600CLT SRR PASSPUM06:30SRR07:250:55M,TU,W,TH,F,SA,SUUNRESERVED56600 Status
56612NIL SRR PASSAAM07:40SRR08:401:00M,TU,W,TH,F,SA,SUUNRESERVED56612 Status
56664CLT TCR PASSPUM08:47MUC09:491:02M,TU,W,TH,F,SA,SUUNRESERVED56664 Status
56650CAN CBE FAST PASSPUM09:30OTP10:491:19M,TU,W,TH,F,SA,SUUNRESERVED56650 Status
56614NIL SRR PASSAAM09:57SRR10:550:58M,TU,W,TH,F,SA,SUUNRESERVED56614 Status
56616NIL SRR PASSAAM12:10SRR13:050:55M,TU,W,TH,F,SA,SUUNRESERVED56616 Status
56324MAQ CBE FAST PASSPUM14:00PLL16:292:29M,TU,W,TH,F,SA,SUUNRESERVED56324 Status
56363NIL KTYM PASSAAM15:35MUC17:261:51M,TU,W,TH,F,SA,SUUNRESERVED56363 Status
56610NIL PGT PASSAAM17:50PLL19:181:28M,TU,W,TH,F,SA,SUUNRESERVED56610 Status
56602CAN SRR PASSPUM19:20SRR20:401:20M,TU,W,TH,F,SA,SUUNRESERVED56602 Status
56620NIL SRR PASSAAM20:00SRR21:001:00M,TU,W,TH,F,SA,SUUNRESERVED56620 Status
16350RAJYA RANI EXPAAM21:32SRR22:100:38M,TU,W,TH,F,SA,SU2A,3A,SL,GN,16350 Status
Train Type Train Table Info
SuperFast
Click On Function
Headers Sort-
Background Colour Code
Train No Detail Information About Train on new tab
Train Name Route Time Table & Fare of Train 
From & To Detail Information About Station on new tab
Classes Ticket Availibility
Mail/Express
Rajdhani
Shatabdi
Janshatabdi
Garibrath/Yuva
Duronto
Spl Tourism Trains






RECENT NEWS

1
350/2022-23 27-09-2022
Chennai
Revision in timings of trains in Nilambur – Shoranur section


The timings of following Special/Express train services will be change in Nilambur Road– Shoranur Junction – Nilambur Road section as detailed below.


1. The timings of Train No.06470 Nilambur Road - Shoranur Junction Unreserved Express Special (Daily) will be revised with effect from 01.10.2022:


Station

Existing

Arrival/ Departure

 Timings (in hrs.)

Revised

Arrival/ Departure

Timings (in hrs.)

Nilambur Road

(Departure)

11.10

05.30

Vaniambalam

11.19/11.20

05.39/05.40

Todiyappulam

11.24/11.25

05.44/05.45

Tuvvur

11.29/11.30

05.49/05.50

Melattur

11.34/11.35

05.54/05.55

Pattikad

11.44/11.45

06.04/06.05

Angadippuram

11.54/11.55

06.14/06.15

Cherukara

12.04/12.05

06.24/06.25

Kulukkallur

12.09/12.10

06.29/06.30

Vallapuzha

12.14/12.15

06.34/06.35

Vadanam Kurushshi

12.19/12.20

06.39/06.40

Shoranur Junction

(Arrival)

12.50

07.10


2. The Arrival timing of Train No.16349 Kochuveli – Nilambur Road Rajya Rani Express at Nilambur Road railway station will be revised with effect from 30.09.2022

Station

Existing

Arrival/ Departure  Timings (in hrs)

Revised

Arrival/ Departure Timings (in hrs)

Nilambur Road

(Arrival)

05.45

06.05








www.sr.indianrailways.gov.in

https://twitter.com/GMSRailway

https://www.facebook.com/Southern-Railway-240606622749869/



(B.Guganesan)
Chief Public Relations Officer




2
255/2022-2305-08-2022
Chennai
Southern Railway makes headway in harnessing alternate sources of energy

Total Installed Capacity of Solar Plants in SR is 5.06 MWp

Cumulative Solar energy generated is 16.309 million units which resulted in savings of Rs.6.455 Crores

A total of 10.5 MW Wind Mills installed in SR

91.56 Million Units of wind power was generated resulting in savings of Rs.48.54 Crores

With a host of robust initiatives o­n the green energy front, Southern Railway is focusing o­n attaining energy efficiency with focus o­n reduction in carbon footprint.  The zone’s effort in harnessing renewable sources of energy is gaining momentum with Solar power plants being progressively proliferated across its network of Railway stations & Office buildings. Further, substantial energy savings has been made possible through erection of wind mills also.

Harnessing Solar power

The zone had installed 192 kWp solar power plants during the year 2021-22. The total installed capacity of Solar Plants in Southern Railway is 5.06 MWp which generated 5.473 Million Units of energy  in 2021-22 resulting in Rs.2.386 crores of annual savings.   Since installation of Solar Plant in 2017-18 the cumulative solar energy generated is 16.309million units (Kwh) upto June ’22 and the cumulative savings is to the tune of Rs.6.455 crores.  Southern Railway is presently recording an average annual power savings of Rs.2 Crores as a result of tapping solar energy resources.

Solar power panels have been installed at various locations/railway stations such as Dr. MGR Chennai Central, MMC complex, Katpadi, Tambaram, Mambalam, Guindy and Chengalpattu suburban stations, Divisional Railway Managers’ Offices at Tiruchchirappalli and Madurai, Chief Workshop Manager’s Office at Trichy Golden Rock Workshop, at Level Crossing Gates in Nagercoil-Thiruvananthapuram section, Signal & Telecom Workshop at Podanur, Salem Jn, Namakkal, Tiruppur, Parli, Lakkiti, to mention a few. Dr MGR Chennai Central has become the first railway station in Southern Railway to take care of 100% of its day time energy requirements through solar.

Southern Railway is working towards increasing capacity of solar plants and has planned for installation of solar plants in its vacant land as well as in private land adjacent to Traction Sub-stations of Southern Railway. The energy generated will feed to traction loads which will further result in huge saving in traction energy bills and savings to Railway.

Wind Mills

Windmill Plants have been erected at Kayathar (near Gangai Kondan / Kadambur Railway stations) in Tuticorin district under Madurai division of Southern Railway. Five numbers of Windmill plants of 2.1 MW capacity each, totaling 10.5 MW, was commissioned in Southern Railway o­n 8th Jan, 2019 at a cost of Rs.74 crores. In 2021-22, the energy harnessed from wind mills is around 25.686 million units resulting in savings of around Rs.14.54 crores.  The cumulative energy harnessed by wind mills in Southern Railway is 91.564 million units, since installation till Jul ’22, and this yielded savings in traction energy bills to the tune of Rs.48.54 CroresIt is noteworthy that 2,61,412 Kwh units of electrical energy generated by these windmills o­n 13th July 2022 is the highest generation in a day so far.1.86% of traction energy requirement for electric trains running in Southern railway during 2021-22 was met by green energy from its wind mills. 2.12% of total electrical energy requirement of SR for traction and non-traction purpose is met from green energy generated by solar and wind plants.

        

   

 Follow us

www.sr.indianrailways.gov.in

https://twitter.com/GMSRailway

https://www.facebook.com/Southern-Railway-240606622749869/



(B.Guganesan)
Chief Public Relations Officer





COMMENTS

NO Comments. Be the first to Comment...

Add Comment






Submit