For a Proper experience on Trainspy.com, enable JavaScript in your browser

Search For Trains   

Ramva

STATION INFO

Address: Ramva Dist. Fatehpur Uttar Pradesh

Station Code: RAMA)Ramv

Station Name: RAMA)Ramva

Zone: NCR/North Central

Total Unique Trains: 2

Train Frequency Weekly: 13

Station Traffic: Low

ALL PASSING TRAINS
Print Table

To Check Ticket Availibility Click Classes
TrainTrain NameArrDepHaltDaysClasses
Arrival
64591SFG CNB MEMU08:2808:291M,TU,W,TH,F,SA,SUUNRESERVED
64592CNB SFG MEMU17:1717:181M,TU,W,TH,F,SA,SUUNRESERVED
TrainTrain NameArrDepHaltDaysClasses
Departure



RECENT NEWS

1
   

SOUTH CENTRAL RAILWAY
PRESS RELEASE
PUBLIC RELATIONS OFFICE, SECUNDERABAD - 500 071
No.369/2021-2217-08-2021
Secunderabad
SCR Commissions Double Line with Electrification between Vijayawada- Uppaluru



- This provides continuous double line with electrification connectivity for 141 kms between Vijayawada - Gudivada - Bhimavaram Town and Gudivada - Machilipatnam

South Central Railway has completed and commissioned 17 Kms of Double Line & Electric traction o­n Vijayawada - Uppaluru Double Line. The commissioning of Doubling with Electrification between these two stations (Vijayawada – Uppaluru) provides continuous double line rail connectivity, along with electrification, for a combined distance of 141 kms between Vijayawada - Gudivada - Bhimavaram Town and Gudivada – Machilipatnam.

This commissioning of double line with electrification is part of the Vijayawada – Gudivada – Bhimavaram – Narsapur, Gudivada – Machilipatnam & Narsapur – Nidadavolu Doubling and Electrification project. The project was sanctioned in the year 2011-12 for a distance of 221 Kms at an estimated cost of Rs. 3,000 Crore, and is being executed by RVNL (Rail Vikas Nigam Limited). This is a prestigious project in the coastal belt of Andhra Pradesh and boosts the development of the region. Out of the total project length of 221 Kms project, a total of 141 Kms has now been completed and commissioned. Works in the remaining sections, i.e., between Nidadavolu - Narsapur for a distance of 70 Route Kms, are progressing at a fast pace and is nearing completion.

Salient Features of the newly completed Double line with Electrification -

· Entire track is designed to handle 25 T Axle loads with a speed potential of 110 kmph,

· 2 Major bridges with PSC Girders and 18 Minor bridges have been constructed.

· Passenger amenities at all the stations viz., Uppaluru, Nidamanuru and Ramavarappadu have been strengthened with well planned circulating area, booking concourse, convenient platforms, drinking water facilities, foot over bridges etc.

· Three Station yards of Uppaluru, Nidamanuru and Ramvarappadu has been remodeled with standard double line layout with modern facilities.

· Cut and Connection method is used wherever possible and hence almost the entire line is commissioned with maximum permissible speed.

· Indigenously built Centralized Architecture Electronic Interlocking has been installed at 3 stations Uppaluru, Nidamanuru, Ramavarappadu to ensure safety at the highest level.

· Electrically operated Lifting Barriers have been installed at 7 Railway Level Crossing Gates in the section with good road surface and indication boards.

Benefits

ü This infrastructure development project will significantly strengthen Rail transport infrastructure by providing seamless movement of freight and passenger traffic o­n rails.

ü The new double rail line will increase mobility and serve public aspirations with regard to rail transportation.

ü Economy of hinterland will see leverage with boost in transport of Agriculture and Aqua products.

ü The electrification works will help in saving energy and reducing fuel expenditure besides reducing carbon foot print.

ü This line also serves as the viable alternate railway line for the coastal rail corridor between Vijayawada - Visakhapatnam.

Shri Gajanan Mallya, General Manager, SCR complimented the officials of Vijayawada Division & RVNL for completing the project works as per schedule. The General Manager advised RVNL authorities to complete the project in pro-active approach so that the entire project is completed & commissioned at the earliest, thereby fulfilling the needs of the Coastal Belt of Andhra Pradesh. He also instructed the Railway officials to extend all the possible help in execution of project at a faster pace.








COMMENTS

NO Comments. Be the first to Comment...

Add Comment






Submit


Latest Search