For a Proper experience on Trainspy.com, enable JavaScript in your browser

Search For Trains   

PARAS

STATION INFO

Address: Paras, Maharashtra 444109, India

Station Code: PS)PARA

Station Name: PS)PARAS

Zone: CR/Central

Total Unique Trains: 8

Train Frequency Weekly: 49

Station Traffic: Low

ALL PASSING TRAINS
Print Table

To Check Ticket Availibility Click Classes
TrainTrain NameArrDepHaltDaysClasses
Arrival
51198WR BSL PASS04:5704:581M,TU,W,TH,F,SA,SUUNRESERVED
18029LTT SHALIMAR EX07:3307:352M,TU,W,TH,F,SA,SU2A,3A,SL,GN
51183BSL NRKR PASS08:5508:561M,TU,W,TH,F,SA,SUUNRESERVED
51286NGP BSL PASS10:4410:451M,TU,W,TH,F,SA,SUUNRESERVED
51184NRKR BSL PASS15:2415:251M,TU,W,TH,F,SA,SUUNRESERVED
51197BSL WR PASS16:5616:571M,TU,W,TH,F,SA,SUUNRESERVED
18030SHM LTT EXPRESS18:1918:201M,TU,W,TH,F,SA,SU2A,3A,SL,GN
51285BSL NGP PASS21:5121:521M,TU,W,TH,F,SA,SUUNRESERVED
TrainTrain NameArrDepHaltDaysClasses
Departure



RECENT NEWS

1
Press Release No. 16821-07-2020
Hubballi
Press Release No. 168, SECTIONAL SPEED INCREASED BETWEEN MAJORDA AND VASCO-DA-GAMA

प्रेस विज्ञप्तिPress Release No. 168  Dt: 17.07.2020

SECTIONAL SPEED INCREASED BETWEEN MAJORDA AND VASCO-DA-GAMA

South Western Railway has made use of the lockdown period as the train movement has very much reduced compared to normal period, to complete major track maintenance works, which has helped in the increase in sectional speed-speed at which train runs between stations.   Track maintenance is an integral part of train operations and it has a direct impact o­n both the safety of tracks as well as in maintaining the maximum permissible speed of the trains.  Maintaining the railway lines, points, crossings, sleepers and ballast for enhancing the safety, speed and reliability are being taken-up during the maintenance.

Modern machines like track packing machines, ballast cleaning machines and others were used extensively to complete the repairs in half the   time than usual.  Work of these machines involves cleaning and packing of the ballast (crushed stones underneath track and sleepers). Along with correcting the alignments at the rail crossings was taken up.

On SWR large scale track maintenance works have been carried out between Londa - Vasco section of Hubballi division facilitating increase in sectional speed between Majorda to Vasco-Da-Gama from 75 kmph earlier  to 100 kmph for nearly 7 Km (Track km 92.500 to km 99.300) and from 65 kmph to 75 kmph for 9.5 Km (Track Km 99.300 to km 108.500)

The following works were completed to facilitate improved section speed in the section.

1) DEEP-SCREENING: Complete stretch was deep screened by Ballast cleaning machines, resulting in increased ballast cushion (below the Rail level) of 300-350 mm and thus achieving high track modulus, resilience to failures and improved parasitic motion (Rolling, pitching, nosing, shuttling, lurching and bouncing).

2) THROUGH WELD RENEWALS: All Aluminothermic weld which have completed 50% of prescribed service life were renewed by Flash Butt welds by undertaking Through Weld Renewal work thereby ensuring reduced failures and ensured safety.

3) BALLASTING:  10000-12000 Cubic meter of ballasting during the course of machine tamping, imparting increased longitudinal and lateral ballast resistance for track as per the standard Ballast profile.

4) CESS WORK: 5000 Cubic meter of Earth work for making good the cess, to ensure retentivity of ballast Profile and adequate longitudinal drainage arrangements.

5) INTERCHANGING OF RAILS o­n SHARP CURVES:

In curves Outermost Rails o­n Sharp curves will be less written out than inner o­nes.  Inner and outer rails in all sharp curves of 4-6 degree were interchanged for maintaining the track parameters within the permissible limits to ensure safety.

6) RAISING OF SUPERELEVATION: For all the sharp curves SE was raised and Versines were adjusted by design mode in machine tamping to make them fit for 110 kmph passenger train speed and 75 kmph goods speeds.

Speed raising certificate o­n the section between Majorda and Vasco-Da-Gama has been issued based o­n the authorization by Shri A K Rai, Commissioner of Railway Safety, Southern Region/Bengaluru after the window trailing inspection o­n OMS carried out by Shri Vinod Bampal, Chief Track Engineer and Chief Engineer (TP).  The maintenance works were possible due to the persistent monitoring of Shri Vipul Kumar, Principal Chief Engineer and Shri Arvind Malkhede, DRM/UBL and persistent team work of Branch officers of Hubballi division.  Shri A K Singh, GM/SWR appreciated the planning and efforts put in taking up intensive maintenance works availing lean period, amidst pandemic. Shri Singh mentioned that in all such works, norms recommended to combat COVID such as wearing of masks, maintaining social distance etc are being scrupulously followed.


                                                                                           Chief Public Relations Officer

                                                                              South Western Railway, Hubballi





2
03-06-2020
Press Release : WITHDRAWAL OF FEW STOPPAGES OF SOME SPECIAL TRAINS · * REFUND OF JOURNEY FARES THEREOF

                                 

WITHDRAWAL OF FEW STOPPAGES OF SOME SPECIAL TRAINS

·REFUND OF JOURNEY FARES THEREOF

 

Kolkata, June 3, 2020:

 

As per request of the concerned State Governments few stoppages of following special trains originating from ER or running via ER network will be withdrawn for the trains commencing journey w.e.f. 4.6.2020 as notified earlier:-

 

Train No. & particulars

Frequency

Name of stations where stoppages are to be withdrawn

02357/02358 Kolkata-Amritsar-Kolkata Special train

Bi-weekly

Parasnath

 

02307/02308 Howrah-Jodhpur-Howrah Special train

Daily

Parasnath, Koderma

 

02381/02382 Howrah-New Delhi-Howrah Special (via Gaya) train

Tri-weekly

Barddhaman, Parasnath, Koderma

02303/02304 Howrah-New Delhi-Howrah Special (via Patna) train

4 days a week

Durgapur, Chittaranjan, Madhupur

 

02023/02024 Howrah-Patna-Howrah Special train

6 days a week

Chittaranjan, Madhupur

 

05955/05956 Delhi-Dibrugarh-Delhi Special train

Daily

Barharwa, Falakata, Dhupguri, Jalpaiguri Road, New Farakka

 

08183/08184 Tata-Danapur-Tata Special train

Daily

Barabhum, Joychandi Pahar, Burnpur, Chittaranjan

 

05645/05646 Lokmanya Tilak - Guwahati-Lokmanya Tilak Special train

Bi-weekly

Dhupguri

 

 

 

Refund of Fares:

In cases where PRS counter ticket has been purchased for such stations where stoppages are cancelled, the PNR shall be cancelled in the reservation system prior to the preparation of first reservation chart. Full refund of fare shall be granted without deduction of cancellation charges o­n surrendering of original ticket across any reservation counter within 30 days of the date of journey. In case of counter tickets booked through digital transactions, refund of fare shall be credited to the transaction account.

In case of E-tickets the refund will be granted without any cancellation charge by IRCTC.









COMMENTS

NO Comments. Be the first to Comment...

Add Comment






Submit


Latest Search