For a Proper experience on Trainspy.com, enable JavaScript in your browser

Search For Trains   

ODDARAHALLI

STATION INFO

Address: Hadonahalli, Bangalore Rural 561203 Karnataka

Station Code: ORH)ODDARAHALL

Station Name: ORH)ODDARAHALLI

Zone: SWR/South Western

Total Unique Trains: 4

Train Frequency Weekly: 25

Station Traffic: Low

ALL PASSING TRAINS
Print Table

To Check Ticket Availibility Click Classes
TrainTrain NameArrDepHaltDaysClasses
Arrival
66524HUP SBC MEMU07:3907:401M,TU,W,TH,F,SA,SUUNRESERVED
56503VIJAYAWADA PASS08:3908:401M,TU,W,TH,F,SA,SUSL,GN
56504BZA BNC PASS14:1414:151M,TU,W,TH,F,SA,SUSL,GN
66523SBC HUP MEMU18:4918:501M,TU,W,TH,F,SA,SUUNRESERVED
TrainTrain NameArrDepHaltDaysClasses
Departure



RECENT NEWS

1
Press Release No. 8620-06-2022
Hubballi
Press Release No. 86,REVISION IN TIMINGS OF TRAIN No. 06515

 à¤¦à¤•à¥à¤·à¤¿à¤£ à¤ªà¤¶à¥à¤šà¤¿à¤® à¤°à¥‡à¤²à¤µà¥‡ / SOUTH WESTERN RAILWAY  
प्रेस à¤µà¤¿à¤œà¥à¤žà¤ªà¥à¤¤à¤¿ / Press Release No. 86 Dt: 20.06.2022     

                       REVISION IN TIMINGS OF TRAIN No. 06515

Please note the revision in timings of Train No. 06515 Yesvantpur – Sri Sathya Sai Prashanthi Nilayam MEMU Unreserved Express Special, Notified vide this office Press Release No. 85, dated 19.06.2022. The timings of Train No. 06515 are revised again. The corrected timings are shown in BOLD Letters.

ØTrain No. 06515/06516 Yesvantpur – Sri Sathya Sai Prashanthi Nilayam – Yesvantpur MEMU Unreserved Express Special commencing journey with effect from both side from 21.06.2022- until further advise.

Train No. 06515

Yesvantpur – Sri Sathya Sai Prasanthi Nilayam

MEMU Unreserved Express Special

Station

Train No. 06516

Sri Sathya Sai Prasanthi Nilayam – Yesvantpur MEMU Unreserved Express Special

Timings

(Arrival/Departure)

Timings

(Arrival/Departure)

09.35 AM (Dep)

Yesvantpur

07.10 PM (Arr)

09.46 AM / 09.47 AM

Kodigehalli

06.30 PM / 06.31 PM

09.56 AM / 09.58 AM

Yelahanka

06.21 PM / 06.22 PM

10.08 AM /10.09 AM

Rajanukunte

06.10 PM / 06.11 PM

10.19 AM /10.20 AM

Doddaballapur

06.01 PM / 06.02 PM

10.28 AM /10.29 AM

Oddarahalli

05.53 PM / 05.54 PM

10.40 AM /10.41 AM

Makalidurga

05.42 PM / 05.43 PM

10.51 AM /10.52 AM

Thondebhavi

05.28 PM / 05.29 PM

11.01 AM /11.02 AM

Gauribidanur

05.16 PM / 05.17 PM

11.10 AM /11.11 AM

Devarapalle

05.05 PM / 05.06 PM

11.21 AM /11.23 AM

Hindupur

04.50 PM / 04.52 PM

11.33 AM /11.34 AM

Malugur

04.39 PM / 04.40 PM

11.44 AM /11.45 AM

2

Press Release No. 51424-01-2022
Hubballi
Press Release No. 514, SWR UPGRADED THE INFRASTRUCTURE UNDER THE MISSION RAFTAR

             à¤¦à¤•à¥à¤·à¤¿à¤£ à¤ªà¤¶à¥à¤šà¤¿à¤® à¤°à¥‡à¤²à¤µà¥‡ / SOUTH WESTERN RAILWAY               à¤ªà¥à¤°à¥‡à¤¸ à¤µà¤¿à¤œà¥à¤žà¤ªà¥à¤¤à¤¿ / Press Release No. 514 Dt: 24.01.2022

SWR UPGRADED THE INFRASTRUCTURE UNDER THE MISSION RAFTAR

• Sectional Speed over 317.42 Route km o­n SWR has been increased

• 32 trains speeded up during 2021-22

The “Mission Raftaar” of Indian Railways envisages improving of average speeds of passenger and freight trains. To improve average speeds of Passenger and Freight trains, Railway is working o­n many fronts including doubling.  o­ne of the thrust area being strengthening of track by undertaking various track improvement works. 

            South Western Railway has undertaken Track Renewal and Engineering Works in a big way  to improve sectional speeds, improve speeds o­n  loop lines at stations and to   eliminate permanent speed restrictions.  This is paving way for  long restriction free stretches thereby increasing the speed potential of trains.  Some of the significant achievements of SWR in the current financial year Up to December 2021 are as under :

Over 317 Route km of South Western Railway, sectional speed has been increased.  Some of the sections includeArsikere-Tumakuru, Davangere-Tolahunse, Harihar-Devargudda, Chikkaballapur-Kolar,  Yelahanka-Oddarahalli, Makalidurg-Devarapalle, Chikkodi Road-Raybag-Kudachi,  Gadag-Binkadakatti, Jumnal-Vijayapura etc. Over last three years o­n almost 2000 RKM sectional speed was raised.

In first 9 months of this financial year, Speed o­n loop lines at various stations totaling to153 Km  has been increased from 15 Kmph  up to 30 Kmph.  Loop lines speed has been increased in all the stations between Yesvantpur and Hubballi in last 3 years. Similarly Loop line speed has been increased in all the stations between Yesvantpur-Omluru, Mysuru-Arsikere, Wandal-Hotgi etc.

UptoDecember 2021, 18 permanent speed restrictions have been removed/relaxed  over South Western Railway . 

Shri  Sanjeev  Kishore, General Manager, South Western Railway appreciated the works done under the guidance of Principal Chief Engineer, Shri S.P.S. Gupta  and the Divisional Railway Managers of Hubballi, Bengaluru and Mysuru Division. 

Shri  Sanjeev  Kishore, GM/SWRsaid that as a result of progress achieved o­n account of doubling of track and above works, the mobility of trains has improved.   During 2021-22 itself, till now 32 Express/Passenger trains have been speeded up.  He said that SWR is doing all out efforts  to increase the speed by pursuing doubling works in Bengaluru-SSS Hubballi, Londa-Miraj and Gadag-Hotgi routes.  The increase in sectional speed will not o­nly  reduce travel time but also improve punctuality.  

Trains Speeded up during 2021-2022 

Sl.No

Train

From-To

Speededby

1

12649

YPR-NZM

05Minutes

2

12777

UBL-KCVL

10Minutes

3

12778

KCVL-UBL

10Minutes

4

12725

SBC-DWR

10Minutes

5

16591

UBL-MYS

10Minutes

6

16592

MYS-UBL

15Minutes

7

16590

MRJ-SBC

15Minutes

8

12089

SBC-SMET

15Minutes

9

16543

YPR-UBL

30minutes

10

16507

JU-SBC

35Minutes

11

16209

AII-MYS

35Minutes

12

16505

GIMB-SBC

35Minutes

13

12080

UBL-SBC

35Minutes

14

16589

SBC-MRJ

39Minutes

15

14805

YPR-BME

40Minutes

16

16587

YPR-BKN

40Minutes

17

14806

BME-YPR

45Minutes

18

16588

BKN-YPR

45Minutes

19

12079

SBC-UBL

45Minutes

20

16589

SBC-MRJ

50Minutes

21

17326

MYS-BGM

52Minutes

22

16544

UBL-YPR

60minutes

23

17324

BSB-UBL

60minutes

24

16546

KTGG-YPR

60Minutes

25

COMMENTS

NO Comments. Be the first to Comment...

Add Comment






Submit