For a Proper experience on Trainspy.com, enable JavaScript in your browser

Search For Trains   

MOLAKALMURU

STATION INFO

Address: Bellary-Hiriyur Road, Adavimallapura, Karnataka 577535, India

Station Code: MOMU)MOLAKALMUR

Station Name: MOMU)MOLAKALMURU

Zone: SWR/South Western

Total Unique Trains: 6

Train Frequency Weekly: 27

Station Traffic: Low

ALL PASSING TRAINS
Print Table

To Check Ticket Availibility Click Classes
TrainTrain NameArrDepHaltDaysClasses
Arrival
56909HOSPET PASSR07:1707:181M,TU,W,TH,F,SA,SUSL,GN
57452GTL JRU PASS10:2510:261M,TU,W,TH,F,SA,SUUNRESERVED
18111TATA YPR EXP11:1111:121TH2A,3A,SL,GN
57451JRU GTL PASS17:1417:151M,TU,W,TH,F,SA,SUUNRESERVED
18112YPR TATA EXP17:5918:001SU2A,3A,SL,GN
56910SBC FAST PSGN18:5418:551M,TU,W,TH,F,SA,SUSL,GN
TrainTrain NameArrDepHaltDaysClasses
Departure



RECENT NEWS

1
Press Release No. 154 06-07-2020
Hubballi
Press Release No. 154, COMMISSIONER OF RAILWAY, SAFETY INSPECTS RAILWAY ELECTRIFICATION WORKS BETWEEN RAYADURGA AND TALAKU SECTION (48 ROUTE KM) OF MYSORE DIVISION OF SWR

प्रेस विज्ञप्तिPress Release No. 154  Dt: 30.06.2020

COMMISSIONER OF RAILWAY, SAFETY INSPECTS RAILWAY ELECTRIFICATION WORKS BETWEEN RAYADURGA AND TALAKU SECTION (48 ROUTE KM) OF MYSORE DIVISION OF SWR

Electrification works o­n 48 Route Km of section between Rayadurga and Talaku o­n Mysuru Division of SWR. This section is part of the 184 Route Km of Ballari – Chikjajur electrification.  CRS inspection and speed trial of 48 Rkm electrified section between Rayadurga and Talaku  of Mysuru division of SWR was done o­n 30.06.2020 by  Shri A K Rai, Commissioner of Railway Safety, Southern Eastern Region.  He is looking after Southern Region also, after retirement of Shri K. Manohar in May 2020.  This work is being executed by Rail Vikas Nigam Ltd.

Electrification of Section between Ballari to Rayadurga (53 Rkm) was completed in Dec 2019. Electrification of Thornagallu and Hosapete has been completed in Feb 2020

As envisioned in Union Budgets 2019 & 2020   Indian Railways is aiming to achieve the full electrification of its tracks in the next three to four years.  o­n SWR aprox 802 Rkm of electrification has been targeted for completion in this financial year.

Last year 147 Route Km of Railway track of SWR has been electrified. The sections which were energised include Ballari – Rayadurga (53 Rkm), Toranagallu - Ranjithpura (23 Rkm) Baiyappanahalli – Anekal (37 RKm) & Toranagallu – Kariganur (34 RKms). 


During the inspection, 3 power line crossings (2 between Talaku and Bommagundanakere and 1 between Bommagundanakere and Molakalmuru), 4 LC gates o­n the section and 4 stations (Talaku, Bommagundanakere, Molakalmuru & Rayadurga) were covered.

Over Head Equipment o­n the section i.e., foundations (1076 Nos.), mast erection & grouting (888 Nos.) portal/boom erection (18 Nos), bracket erection, wiring (104 shot) SED & TW checking were inspected.  Short circuit test was also conducted o­n the section.

Shri B G Mallya, PCEE, Shri Ajay Kumar, PCSTE, Smt Aparna Garg, DRM/MYS, Shri Himanshu Sharma, GM/EL/RVNL and other Branch officers of Mysuru division accompanied CRS during the inspection.  After completion of speed trial and inspection of the section and safety equipment at stations o­n this section, CRS will consider the proposal for Authorization of electrification of this line for passenger traffic.

Electrification will significantly improve mobility of trains o­n SWR and strengthen Rail network in Karnataka.  In addition to reduction in pollution, energy efficiency of Railway will improve due to shift from fossil fuel to electricity and save substantial foreign exchange.

                   

                       


                                                                                           Chief Public Relations Officer

                                                                              South Western Railway, Hubballi





2
Press Release No. 34310-01-2020
Hubballi
Press Release No. 343, FOR THE CONVENIENCE OF PILGRIMS SWR INCREASES FREQUENCY OF TRAIN NO. 06223/06224 SHIVAMOGGA TOWN - RENIGUNTA - SHIVAMOGGA TOWN FROM WEEKLY TO BI-WEEKLY

                                                                                                       

                                                                 SOUTH WESTERN RAILWAY

                                      Press Release No. 343  Dt. 09.01.2020


FOR THE CONVENIENCE OF PILGRIMS SWR INCREASES FREQUENCY OF TRAIN NO. 06223/06224 SHIVAMOGGA TOWN - RENIGUNTA - SHIVAMOGGA TOWN FROM WEEKLY TO BI-WEEKLY

With a view to providing sufficient time for the pilgrims from Shivamogga and other places to visit Tirupati and return the following day by train services, South Western Railway is pleased to announce the increase in frequency of T.No.06223/06224 Shivamogga Town - Renigunta - Shivamogga Town weekly Tatkal special from weekly to Bi-Weekly services with effect from 09.01.2020 from both sides. Now, these services will be available o­n Wednesday and Thursday in both directions. The period of the services will be up to 20.08.2020. First service of enhanced frequency started at Shivamogga today morning at 06:15 hrs.

Shri Suresh Angadi, Hon’ble MoSR and Shri B Y Raghavendra, Hon’ble MP, Shivamogga have been instrumental in ensuring increase in frequency for this train.   South Western Railway, Mysuru Division has urged the rail users in this region to patronise these train services so that o­n better occupancy this train could be regularized.

Time Table For Train No. 06223/06224 Shivamogga Town - Renigunta - Shivamogga Town Tatkal Bi-Weekly Express Special:

T.No.06223 Shivamogga Town – Renigunta Bi-weekly Tatkal special (Wed, Thurs)

Arr. /Dep.

Station

Arr. /Dep.

T.No.06224 Renigunta – Shivamogga Town Bi-weekly Tatkal special (Thurs, Fri)

06.15

Dep.

Shivamogga Town

Arr.

11.45

06.28/06.29

Arr./Dep.

Bhadravati

Arr./Dep.

11.00/11.01

06.49/06.50

Arr./Dep.

Tarikere

Arr./Dep.

10.39/10.40

07.15/07.30

Arr./Dep.

Birur

Arr./Dep.

09.40/10.10

07.46/07.47

Arr./Dep.

Ajjampura

Arr./Dep.

09.19/09.20

08.16/08.17

Arr./Dep.

Hosadurga Road

Arr./Dep.

09.02/09.03

08.43/08.45

Arr./Dep.

Chikjajur

Arr./Dep.

08.45/08.47

09.26/09.28

Arr./Dep.

Chitradurga

Arr./Dep.

08.00/08.02

11.00/11.01

Arr./Dep.

Molakalmuru

Arr./Dep.

06.31/06.32

11.29/11.30

Arr./Dep.

Raydurg

Arr./Dep.

06.15/06.17

13.10/13.15

Arr./Dep.

Ballari

Arr./Dep.

04.45/04.50

14.05/14.10

Arr./Dep.

Guntakal

Arr./Dep.

03.10/03.15

14.25/14.27

Arr./Dep.

Gooty

Arr./Dep.

02.25/02.27

15.24/15.26

Arr./Dep.

Tadipatri

Arr./Dep.

01.35/01.37

16.00/16.02

Arr./Dep.

Kondapuram

Arr./Dep.

01.07/01.09

16.40/16.42

Arr./Dep.

Yerraguntla

Arr./Dep.

00.25/00.27

17.28/17.30

Arr./Dep.

Cuddapah

COMMENTS
NO Comments. Be the first to Comment...

Add Comment






Submit