For a Proper experience on Trainspy.com, enable JavaScript in your browser

Search For Trains   

LUNI RICHHA

STATION INFO

Address: 457114, India

Station Code: LNR)LUNI RICHH

Station Name: LNR)LUNI RICHHA

Zone: WCR/West Central

Total Unique Trains: 8

Train Frequency Weekly: 49

Station Traffic: Low

ALL PASSING TRAINS
Print Table

To Check Ticket Availibility Click Classes
TrainTrain NameArrDepHaltDaysClasses
Arrival
69155RTM MTJ PASS09:1409:151M,TU,W,TH,F,SA,SUUNRESERVED
59804KOTA RTM PASS09:5309:552M,TU,W,TH,F,SA,SU2A,3A,SL,GN
19020DEHRADUN EXP11:5311:552M,TU,W,TH,F,SA,SU2A,3A,SL,GN
59832KOTA BRC PASS14:2414:251M,TU,W,TH,F,SA,SUUNRESERVED
19019DEHRADUN EXP14:4114:432M,TU,W,TH,F,SA,SU2A,3A,SL,GN
59803RTM KOTA PASS15:0615:082M,TU,W,TH,F,SA,SUUNRESERVED
59831BRC KOTA PASS16:4716:481M,TU,W,TH,F,SA,SUUNRESERVED
69156MTJ RTM PASS17:5918:001M,TU,W,TH,F,SA,SUUNRESERVED
TrainTrain NameArrDepHaltDaysClasses
Departure



RECENT NEWS

1
2021/01/2518-01-2021
Maintenance works carried out in Sunday mega block

Central Railway

Press Release

Maintenance works carried out in Sunday mega block

Central Railway Mumbai Division carried out maintenance work during mega block o­n main line between Matunga-Mulund Up and Dn fast lines & o­n harbour line between Kurla-Vashi Up & Dn harbour lines o­n 17.1.2021.

Engineering works

45 meters of rail replacement, packing and fitting of points, replacement of SEJ sleepers, 2.2 km tamping work done with Duomatic machine, besides welding work, boxing and ballasting work for 450 meters were also undertaken.Work of cleaning of 300 meters of centre drain was also done.

 

OHE works

Annual overhauling of 2.15 km OHE, close inspection of 1.55 km OHE were done along with re-tension ofcontact wires, replacement of 100 meters contact wires, 4 flash insulators and 38 droppers, checking of 18 C/G jumpers andremoval of 13 excess C-jumpers. Erection of 2 masts, 9 brackets, dismantling of rusty offloaded mast, 14 fittings, 5 super masts & spare switch fittings and 4 DC bracket assemblies were done along with lifting of 5 bracket assemblies and 7 span droppers were also done. Provision of 12 bonds, disconnection & reconnection of 34 bonds were also done with tree trimming work at 5 places. These works were carried out with o­ne crane, 4 Tower Wagons and 6 trestle/ ladder gangs.

 

S&T Works

Replacement of medium type location box with modular type location box, signal units, track lead wires, 72 terminals, bonds, friction clutch, detector trolley and wiring tree done along with testing of the same. Drilling of cycle holes, provision of continuity jumpers, re-wiring of signal routes, re-termination of signal in termination box, disconnection and reconnection work of all signal fittings along with coordinating with the Engineering Department for Signal and Telecommunication repair works.

--- ----

Date: January 18, 2021

PR No.2021/01/25

This press release is issued by the Public Relations Department, Central Railway, Chhatrapati Shivaji Maharaj Terminus Mumbai.



(Shivaji Sutar)
Chief Public Relations Officer




2
2021/01/2115-01-2021
Mega Block on 17.1.2021

Central Railway

Press Release

Mega Block o­n 17.1.2021

Central Railway will operate Mega Block o­n its suburban sections for carrying out maintenance work o­n 17.1.2021.

Matunga - Mulund Up and Dn fast lines from 11.00 am to 4.00 pm

Dn fast services leaving Chhatrapati Shivaji Maharaj Terminus Mumbai from 10.25 am to 3.21 pm will be diverted o­n Dn slow line at Matunga and will halt at all stations between Sion and Mulund and will arrive destination 15 minutes behind schedule.Fast trains beyond Thane will be re-diverted o­n Dn fast line at Mulund.

 

Up fast services leaving Thane from 10.46 am to 3.26 pm will be diverted o­n Up slow line at Mulund and will halt at all stations between Mulund and Dadar stations and will arrive destination 15 minutes behind schedule. Fast trains to CSMT will be re-diverted o­n Up fast line at Parel.

 

Kurla - Vashi Up & Dn harbour lines from 11.10 am to 4.10 pm

Dn Harbour line services to Vashi /Belapur/Panvel leaving Chhatrapati Shivaji Maharaj Terminus Mumbai from 10.34 am to 3.39 pm and Up Harbour lineservices for Chhatrapati Shivaji Maharaj Terminus Mumbai leaving Panvel/Belapur/Vashifrom 10.21 am to 3.41 pm will remain suspended.

However, Special services will run between Chhatrapati Shivaji Maharaj Terminus-Kurla and Vashi-Panvel sections during the block period.

Harbour line passengers are permitted to travel via Main Line and Transharbour line from 10.00 am to 4.30 pm during block period.

These maintenance mega blocks are essential for infrastructure upkeep and safety. Passengers are requested to bear with the Railway Administration for the inconvenience caused.

--- --- ---

Date: January 15, 2021

PR No.2021/01/21

This press release is issued by the Public Relations department, Central Railway, Chhatrapati Shivaji Maharaj Terminus Mumbai.








COMMENTS

NO Comments. Be the first to Comment...

Add Comment






Submit


Latest Search