For a Proper experience on Trainspy.com, enable JavaScript in your browser

Search For Trains   

KANGINHAL

STATION INFO

Address: Karnataka 582102, India

Station Code: KGX)KANGINHA

Station Name: KGX)KANGINHAL

Zone: SWR/South Western

Total Unique Trains: 4

Train Frequency Weekly: 25

Station Traffic: Low

ALL PASSING TRAINS
Print Table

To Check Ticket Availibility Click Classes
TrainTrain NameArrDepHaltDaysClasses
Arrival
16592HAMPI EXP08:4908:501M,TU,W,TH,F,SA,SU1A,2A,3A,SL,GN
51412UBL BAY PASS09:3209:331M,TU,W,TH,F,SA,SUUNRESERVED
51411BAY DWR PASS17:3917:401M,TU,W,TH,F,SA,SUUNRESERVED
16591HAMPI EXPRESS19:3919:401M,TU,W,TH,F,SA,SU1A,2A,3A,SL,GN
TrainTrain NameArrDepHaltDaysClasses
Departure



RECENT NEWS

1
Press Release No. 38913-02-2020
Hubballi
Press Release No. 389, BALLARI TO HUBBALLI TRACK DOUBLED

                                                                                                       

                                                                 SOUTH WESTERN RAILWAY

                                      Press Release No. 389  Dt. 12.02.2020

Ballari to Hubballi track doubled

Binkadakatti - Gadag – Kaninghal - Harlapur - important 23 km long section o­n either side of Gadag junction o­n Hubballi division has been commissioned with Double line o­n 12.02.2020.  The 23 Km section is part of the 352 Km doubling of Hosapete – Tinaighat – Vaso-da-gama Section project.  This has been doubled after inspection of Commissioner of Railway Safety o­n 11.01.2020.  Prior to this, 201 Km of doubling in the section has been commissioned. General Manager, South Western Railway Shri A K Singh said that "With this the section to the east of Hubballi Station upto Ballari has been doubled.  The doubling o­n this important section will give impetus to mobility of both passenger and goods trains. The work of electrification o­n this section is also being executed in full swing”.

At Gadag new Electronic Interlocking with 149 routes has been commissioned at 4.00 hrs.  This replaces end cabin system at Gadag. At Kanginhal Station new Electronic Interlocking was commissioned at 5.10 hrs.  This was a small 3 block section single line patch and with this, doubling is now through between Hosapete to Hubballi /Hubballi byepass which has tremendous operational benefits.

Shri P K Kshatriya, CPM, Shri Ramesh Kambli, GM/Projects, Smt Madhavi John, GGM/S&T and Shri Satish Kumar, JGM/S&T, RVNL officers have been instrumental in completing this section without any detention to trains. Officers of SWR mainly from Hubballi Division of Engineering, Operating, Signal & Telecommunication ensured timely execution of the doubling.  Officers of Hubballi Division have streamlined the traffic movements during Non Interlocking (NI) and facilitated the testing blocks which also had a major role for early commissioning.

Now the doubling apart from for the ghat section area in Karnataka from Tinaighat to Hosapete has been completed except for a small patch between Hubballi and Dharwad (20 Kms) which is targeted for completion by end of March 2020.

The details of sections commissioned during last 4 years is as below:-

Commissioned in 2016-17

1.

Harlapur – Sompur - Bannikoppa-Bhanapur

26.68

2.

Kambarganvi-Kasanhatti-Alnawar

11.32

Commissioned in 2017-18

1.

Shivthan-Londa-Tinaighat

16.47

2.

Bhanapur-Koppal

12.08

3.

Hebsur-Navalgund-Annigeri

16.33

Commissioned in 2018-19

1.

Devrayi-Shivthan

8.00

2.

Koppal-Munirabad-Hosapete

27.51

3.

Annigeri-Binkadkatti

17.43

Commissioned in 2019-20

1.

Alnawar-Devrayi

22.00

2.

Hubballi bye pass

20.60

3.

Binkadakatti - Gadag – Kaninghal - Harlapur

23.13

                                                                       


                                                     (E. Vijaya)

                                                          Chief Public Relations Office








COMMENTS

NO Comments. Be the first to Comment...

Add Comment






Submit


Latest Search