For a Proper experience on Trainspy.com, enable JavaScript in your browser

Train Search








0 Trains from (ski)sakri jn to (BOI)Bainchi


Address: Sakri, Bihar 847239, India

Station Code: SKI

Station Name: SAKRI JN

Zone: ECR/East Central

Train Frequency Weekly: 199

Station Traffic: High

Address: Station road , BOINCHI , DIST - HOOGHLY - 712134 West Bengal

Station Code: BOI

Station Name: Bainchi

Zone: ER/Eastern

Train Frequency Weekly: 19

Station Traffic: Low





Trains
To Check Ticket Availibility Click Classes
Since no Direct Trains Try Nearest Via Stations
Nearest From (ski)sakri jn
(ski)sakri jn 0Kms from (ski)sakri jn
(trs)tarsarai 5Kms from (ski)sakri jn
(kkht)kakarghatti 14Kms from (ski)sakri jn

Nearest From BOI
(bdc)bandel jn 29Kms from (BOI)Bainchi
(cgr)chandan nagar 32Kms from (BOI)Bainchi
(nh)naihati jn 35Kms from (BOI)Bainchi
Train Type Train Table Info
SuperFast
Click On Function
Headers Sort-
Background Colour Code
Train No Detail Information About Train on new tab
Train Name Route Time Table & Fare of Train 
From & To Detail Information About Station on new tab
Classes Ticket Availibility
Mail/Express
Rajdhani
Shatabdi
Janshatabdi
Garibrath/Yuva
Duronto
Spl Tourism Trains






RECENT NEWS

1
09-03-2023
Press Release:GREEN INITIATIVES AT GOODS SHEDS / SIDINGS OF ER’s MALDA DIVISION



Kolkata, March 8, 2023:

As a part of Eastern Railway’s continuous endeavor to restrict pollution for a sustainable environment  Malda Division has taken various steps to tackle/reduce pollution at the Goods Sheds/Sidings.  A total of 10 goods sheds/sidings viz Barharwa, Bakudi, Sakrigali, Karamtola, Rajmahal, Maharajpur, Taljhari, Mirzachowki, Tinpahar and Sahibganj  are marked for developing a green environment.

Various efforts are being made o­n many fronts towards achieving a cleaner and greener environment by reducing the carbon footprint. To suppress fugitive emissions, 2 water mist sprinkler machines have already been commissioned at Sakrigali and Sahibganj sidings. Tender has also been floated regarding the installation of more water mist sprinklers o­n the remaining 08 sidings, which will be opened shortly. 

Apart from this, Malda Division has planned to plant around 5000 saplings to develop green belt around the siding. A massive tree plantation program was also organized by Malda Division and innumerable trees were planted at Sahibganj and Sakrigali Good Shed/ Sidings. A total of 10 good sheds/sidings in Sahibganj district will be painted green to indicate  ER intitiatives for ‘Go Green’.

 Moreover, following provisions have been planned by the Malda Division to combat air pollution at the Goods Shed/Sidings:
1. Provision of 20 ft high boundary wall.
2. Tree plantation in three layers along with fencing.
3. Drainage system with rain water harvesting.
4. Provision of PM 10 analyzer (Continuous Air Particulate Monitoring system) at the  Sidings.

For these works, a total of  Rs 11crore  has already  been sanctioned.

As a part of continuous endeavour to provide a green environment Malda division has taken all preventive measures to arrest the pollution at goods sheds/sidings.




2
04-01-2023
Press Release:WEST BENGAL GETS SEMI HIGH SPEED TRAIN HON’BLE PM FLAGGED OFF HOWRAH-NEW JALPAIGURI VANDE BHARAT EXPRESS & DEDICATED/INAUGURATED A COUPLE OF RAILWAY PROJECTS FOR WEST BENGAL

WEST BENGAL GETS SEMI HIGH SPEED TRAIN

HON’BLE PM FLAGGED OFF HOWRAH-NEW JALPAIGURI VANDE BHARAT EXPRESS &  DEDICATED/INAUGURATED A COUPLE OF RAILWAY PROJECTS FOR WEST BENGAL

Kolkata, December 30, 2022:

West Bengal gets India's first indigenously manufactured Semi High Speed Train Vande Bharat Express by the initiatives of Hon’ble Prime Minister, Shri Narendra Modi. Today (30.12.2022) Hon’ble PM (through video conference) flagged off Howrah-New Jalpaiguri Vande Bharat Express which will connect Northern and Southern part of West Bengal with a remarkable acceleration. Union Minister of Railways, Communication, Electronics & Information Technology, Shri Ashwini Vaishnaw was present at Howrah Station o­n this auspicious occasion. 

Shri Narendra Modi, Hon’ble Prime Minister also inaugurated Joka-Taratala Metro Project, laid foundation stone for redevelopment of New Jalpaiguri station and dedicated 4 Railway Projects (through video conferencing) in West Bengal ushering in a new plethora of development in this state.

  As a result of relentless effort of Indian Railways for ensuring multi-faceted development of West Bengal, fastest train of the country has been introduced in West Bengal reaching the distance of 561 kms to New Jalpaiguri with a travel time of o­nly 7hrs 30 mins as compared to 8½ hrs taken by the Shatabdi Express. 

  The ultra-modern Semi High Speed Train is a major leap for Indian Railways o­n the parameters of superior designs, interiors and speed, providing the passengers a pleasant travel experience. The Vande Bharat Express offers a myriad passenger amenities which will provide passengers with aircraft like travel experience & advanced state-of-the-art safety features including KAVACH technology. The infotainment system in every coach will be an added feature.

  The train is equipped with state-of-the-art passenger amenities such as o­n-board Wi-Fi infotainment, GPS based passenger information system, plush interiors, bio vacuum toilets with touch free amenities, diffused LED lighting, charging points beneath every seat, individual touch based reading lights and concealed roller blinds, better heat ventilation and air-conditioning system with UV lamp for germ free supply of air. The intelligent air-conditioning system adjusts the cooling according to the climate conditions/occupancy. The train will stop at Bolpur (Shantiniketan), Malda Town & Barsoi stations enroute in both the directions. It consists of AC Chair Car & AC Executive Class coaches. 

  Prime Minister Shri Narendra Modi has taken a lots of initiatives for introducing Joka-Taratala Metro Stretch (6.5 Km) of Joka-Esplanade Metro Project (Purple Line) to the people of West Bengal as a new year gift. This 6.5 Km stretch having 6 stations namely Joka, Thakurpukur, Sakher Bazar, Behala Chowrasta, Behala Bazar and Taratala has been constructed at a cost of 2535Cr. 

This stretch is going to provide fast, easy, pollution-free, comfortable and traffic snarl-free commuting to thousands of commuters in AC rakes. Passengers of southern fringes of the City like Sarsuna, Dakghar, Muchipara and South 24 Parganas will be immensely benefited due to this. Students, Professors and Researchers now will be able to reach IIM, Joka easily. The patients and their kins will be able to reach Thakurpukur Cancer Hospital at ease. o­ne can reach Taratala from Joka in Metro in just 15 minutes whereas roadways journey o­n Diamond Harbour Road, o­ne of the busiest thoroughfares of Kolkata takes around 35 minutes.

  All the 6 stations of the Purple Line are replete with ultra modern passenger amenities like lifts, escalators, toilets, tactiles, seating chairs and various safety arrangements like fire-fighting facilities etc. The stations are also aesthetically designed to make travelling experience memorable. 

  Besides, foundation stone has been laid by Hon’ble PM for New Jalpaiguri Station Redevelopment. New Jalpaiguri is a most important station in West Bengal and is the gateway to North-Eastern states as well as to the hills and Dooars region. The New Jalpaiguri station will be redeveloped at an estimated cost of Rs 337.42 crore. The redeveloped New Jalpaiguri station will have various salient features for passengers’ comfort and operational flexibility.

  There are various critical and super critical projects in West Bengal which are also dedicated for maintaining the growth path for the people of West Bengal and to foster socio economic development by enhancing mobility, operational flexibility and speed of both passenger and goods traffic.

  Bainchi - Shaktigarh 3rd Line (25.83 km): Bainchi - Shaktigarh 3rd Line (25.83 km) passes through Hooghly & Purba Burdwan district, completed at a cost of Rs 405 crore. 

  Dankuni - Chandanpur 4th Line Project (25.41 km):
Dankuni - Chandanpur 4th Line Project is a super critical project of 25.41 km stretch which is completed at a cost of Rs 565 crore. 

  Nimtita - New Farakka Double Line (25.42 km):
Nimtita - New Farakka Double Line (25.42 km) is a part of Sagardighi – Malda Town doubling project. Doubling in this 25.42 km stretch has been completed at a cost of Rs 254 crore. 

  Ambari Falakata - New Maynaguri - Gumanihat Doubling Project (88.17 km):
The doubling from Ambari Falakata to New Maynaguri and from New Maynaguri to Gumanihat, a stretch of 88.17 km, has been completed at a cost of Rs 1461 crore. Covering Cooch Behar and Jalpaiguri districts of west Bengal, this section has 11 stations enroute.

  After inauguration/dedication/ laying of foundation stone of various railway projects, Shri Ashwini Vaishnaw, Hon’ble Railway Minister proceeded to Joka and took a ride in newly inaugurated Joka – Taratala Metro Rail section, a stretch of 6.5 km of metro rail, directly linking the western part of Kolkata with the central business areas of the city of joy.





COMMENTS

NO Comments. Be the first to Comment...

Add Comment






Submit