For a Proper experience on Trainspy.com, enable JavaScript in your browser

Train Search








5 Trains from (gwl)gwalior to (AAH)Itehar


Address: Gwalior Junction Railway Station, Gwalior, Madhya Pradesh 474002, India

Station Code: GWL

Station Name: GWALIOR

Zone: NCR/North Central

Train Frequency Weekly: 597

Station Traffic: High

Address: Village: Aithar, District: Bhind Madhya Pradesh

Station Code: AAH

Station Name: Itehar

Zone: NCR/North Central

Train Frequency Weekly: 31

Station Traffic: Low





Trains
To Check Ticket Availibility Click Classes
TrainTrain NameFromDepToArrTimeDaysClassesStatus
59823GWL BIX PASSGWL06:20AAH08:161:56M,TU,W,TH,F,SA,SUUNRESERVED59823 Status
21125INDORE BHIND EXPGWL08:00SONI09:061:06TU,F,SA2A,3A,SL,GN,21125 Status
59821KOTA BIX PASSGWL12:10AAH13:571:47M,TU,W,TH,F,SA,SUSL,GN,59821 Status
59825GWL BIX PASSGWL14:30AAH16:171:47M,TU,W,TH,F,SA,SUUNRESERVED59825 Status
11801JHS ETW EXPRESSGWL19:15SONI20:191:04M,TU,W,TH,F,SUUNRESERVED11801 Status
Train Type Train Table Info
SuperFast
Click On Function
Headers Sort-
Background Colour Code
Train No Detail Information About Train on new tab
Train Name Route Time Table & Fare of Train 
From & To Detail Information About Station on new tab
Classes Ticket Availibility
Mail/Express
Rajdhani
Shatabdi
Janshatabdi
Garibrath/Yuva
Duronto
Spl Tourism Trains






RECENT NEWS

1
12-08-2021
Shri Ashutosh joins as DRM, Jhansi

उत्‍तर मध्‍य रेलवे

जनसम्‍पर्क कार्यालय

उत्‍तर मध्‍य रेलवे

प्रयागराज

पत्रांक:11पीआर/08/2021              प्रेसविज्ञप्ति                दिनांक: 10.08.2021

Shri Ashutosh joins as DRM, Jhansi

On 10.08.2021, Shri Ashutosh, an officer of the Indian Railway Engineering Service has, assumed the charge of DRM, Jhansi (NCR). Shri Ashutosh has worked as Chief Engineer (Construction) and Principle Chief Engineer, Railway Electrification in Prayagraj.

 

Shri Ashutosh is an alumni of IIT/Kanpur from where he did his BTech in 1989. Shri Ashutosh has worked as Senior Divisional Engineer/Coordination in Agra Division and as ADRM in Ahmedabad Division of Western Railway. Mr. Ashutosh is well acquainted with Jhansi Division. He has worked here as Deputy Chief Engineer/Bridge from 2009 to 2011. During this period he undertook various projects like construction of Foot Over Bridges (FOBs) at stations like Madraha, Bhind, Chitrakoot etc. Apart from this, Pedestrian Pathway o­n the bridges of Sindh and Chambal situated o­n Jhansi-Agra section and inspection pathway o­n two bridges of Yamuna o­n Jhansi-Kanpur, Khairar Bhimsen sections were also constructed during his tenure.

Shri Ashutosh, while working as Chief Engineer (Construction), executed the works of Jhansi-Bina third line, Gwalior Sheopur Kalan gauge conversion (gauge conversion) and Jhansi Manikpur line doubling. Apart from this, yard remodelling and Goods Shed in Rayaru, Road Over Bridges (ROB) at Gwalior, Datia, Sipri etc., renovation of Chirula station and construction of many Road Over Bridges (RUBs) has also been credited to his name.

During the tenure of Mr. Ashutosh's Senior Divisional Engineer/Coordination Agra, Palwal-Bhuteshwar third line, stretchy bridge regirdring in Agra, Agra Cantt yard remodeling, Tundla flyover and road bridges were constructed at many places. New records were set up in rail renewal by PQRS method o­n Agra-Mathura section. He got appreciation by Member Engineering, Railway Board for significant improvement in track maintenance and significant increase in Track Geometry Index (TGI).

During the tenure of Shri Ashutosh as ADRM in Ahmadabad Division of Western Railway, new line, doubling, gauge conversions by various executive agencies like Western DFC, RVNL, Western Railway/Construction, Metro Rail (MEGA), Rail Electrification, RITES, IRSDC gauge conversion, rail electrification, metro rail and Gandhinagar station redevelopment works were executed. Shri Ashutosh established better coordination with all the above executive agencies so that unprecedented progress could be made in the works of rail infrastructure.

Shri Ashutosh, during his tenure as Chief Engineer/Construction, got the infrastructure works done in Prayagraj Mahakumbh 2019 like 4 huge passenger sheds in the station premises, Skywalk to connect FOB, Multi-storey building and many road overhead bridges in a time bound manner so that Mahakumbh was organized successfully. Shri Ashutosh also has experience in concrete sleeper production and overhauling of track machines. Shri Ashutosh has been awarded by the Railway Minister Rajbhasha Puraskar in 2017.

Byjoining of Shri Ashutosh as DRM Jhansi, it ios expected that infrastructure works will be expedited.

GM/NCR Shri Pramod Kumar congratulated Shri Ashutosh for the prestigious assignment and extended his best wishes for him.

 

 





2
301/2021-22 23-07-2021
Chennai
Changes in Pattern of Train Services (4)


Due to Heavy Rain, Water flooding and Landslides in between Roha - Ratnagiri as advised by Konkan Railway and Mud slide & suspected washout of track in Kasara – Kalyan section as advised by Central Railway, the following will  be the changes in pattern of Train services:

Diversion of Train Services:

1.Train No. 02431 Thiruvananthapuram – Hazrat Nizamuddin Special that left Thiruvananthapuram o­n 22nd July, 2021 is diverted via Erode, Renigunta, Balharsha, Itarsi, Bhopal, Jhansi, Gwalior and Agra

2.Train No. 09259 Kochuveli – Bhavnagar Special that left Kochuveli o­n 22nd July, 2021 is diverted via Erode, Renigunta, Balharsha,Wardha, Bhusaval, Udhna and Surat

Cancellation of Train Services:

1.Train No. 06097 Kochuveli - Yog Nagari Rishikesh Special scheduled to leave Kochuveli at 04.50 hrs o­n 23rd July, 2021 will be cancelled


Follow us:

www.sr.indianrailways.gov.in

https://twitter.com/GMSRailway

https://www.facebook.com/Southern-Railway-240606622749869



(B.Guganesan)
Chief Public Relations Officer





COMMENTS

NO Comments. Be the first to Comment...

Add Comment






Submit