5 Trains from (ake)akanapet to (BDHN)BODHAN
Address: Andhra Pradesh 502115, India
Station Code: AKE
Station Name: AKANAPET
Zone: SCR/South Central
Train Frequency Weekly: 131
Station Traffic: Medium
Address: Bellal Rd, Bodhan, Nizamabad Dist. Telangana
Station Code: BDHN
Station Name: Bodhan
Zone: SCR/South Central
Train Frequency Weekly: 37
Station Traffic: Low
Trains
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
To Check Ticket Availibility Click Classes | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
RECENT NEWS
1
www.scr.indianrailways.gov.in- 2023-04-27
In order to clear rush of passengers during Ganga Pushkaram, South Central Railway will run 18 special trains between Secunderabad – Raxaul; Tirupati – Danapur and Guntur – Banaras as detailed below: -
1.Train No. 07007/07008 Secunderabad – Raxaul – Secunderabad Special Trains:
These special trains will stop at Bolarum, Medchal, Akanapet, Kamareddi, Nizamabad, Basar, Mudkhed, Nanded, Purna, Basmat, Hingoli Deccan, Washim, Akola, Bhusawal, Khandwa Jn, Itarsi Jn, Pipariya, Jabalpur, Katni, Satna, Manikpur, Prayagraj Chheoki Jn, Pt. DD Upadhyaya, Buxar, Patliputra, Hajipur, Muzaffarppur and Sitamarhi Jn in both the directions. These special trains consist of AC II Tier, AC III Tier, AC 2 Tier cum AC 3 Tier, Sleeper and General Second-Class coaches. 2.Train No. 07419/07420 Tirupati – Danapur – Tirupati Special Trains:
These special trains will stop at Renigunta, Gudur, Nellore, oÂngole, Chirala, Tenali, Khammam, Warangal, Peddapalli, Ramagundam, Bellampalli, Sirpur Kaghaznagar, Nagpur, Itarsi, Pipariya, Jabalpur, Katni, Satna, Manikpur, Prayagraj Chheoki Jn, Pt. DD Upadhyaya, Buxar and Ara Jn stations in both the directions. These special trains consist of AC II Tier, AC III Tier, AC 2 Tier cum AC 3 Tier, Sleeper and General Second-Class coaches. 3.Train No. 07230/07229 Guntur – Banaras – Guntur Special Trains:
These special trains will stop at Vijayawada, Gudivada, Kaikalur, Bhimavaram Town, Tanuku, Nidadavolu, Rajahmundry, Samalkot, Tuni, Anakapalle, Duvvada, Kottavalasa, Vizianagaram, Rayagada, Muniguda, Titlagarh, Blangir, Bargarh Road, Sambalpur, Jharsuguda, Rourkela, Hatia, Ranchi, Muri, Barkakana, Lateher, Daltonganj, Garwaroad, Dehri oÂn son, Sasaram, Bhabua Road, Pt. DD Upadhyaya and Varanasi stations in both the directions. These special trains consist of AC II Tier, AC III Tier, AC 3 Tier Economy and Sleeper Class coaches. 2
www.scr.indianrailways.gov.in- 2023-03-20
-Part of Manmad – Mudkhed – Dhone Electrification Project -This provides continuous electrified rail line facility from Secunderabad to Basar South Central Railway has taken another significant step towards completion of “Mission Electrification†by electrifying important stretches in Northern Telangana region. As part of it, two vital sections i.e., Nizamabad – Kamareddi (for a distance of 50 Route Kms) and Jankampet – Basar (for a distance of 23 Kms) have been electrified. These sections are located in the important route connecting Telangana region with Maharashtra and other Northern parts of the country. Importantly, electrification of these sections provides continuous electrified rail-line facility for a distance of 210 Kms from Secunderabad to Basar, including the branch line between Jankampet to Bodhan.
Electrification of Nizamabad – Kamareddi & Jankampet – Basar sections have been completed as part of the Manmad – Mudkhed – Dhone electrification project. This project was sanctioned in the year 2015-16 for a distance of 783 Kms, at an estimated cost of Rs 865 Crores. The section between Manoharabad – Mahabubnagar is excluded from this project, and it was taken up and completed as a separate project. The length of the project in Telangana is approximately 300 Kms between Dharmabad – Kurnool City (excluding Manoharabad - Mahabubnagar). The project has been taken up in different phases leading to completion of several sections: 26 Route Kilometers (RKms) of electrification between Nizamabad - Jankampet - Bodhan was completed in March 2022, 67 RKms of electrification between Manoharabad - Kamareddi was completed in October 2022 and 72 Rkm of electrification between Mahabubnagar - Gadwal was completed in November 2022. Now with the electrification of two new sections, the stretches from Secunderabad to Basar and Secunderabad - Gadwal stands electrified. Simultaneously, works are nearing completion in the remaining section of this project.
The electrification of these rail lines helps in providing seamless movement of trains by avoiding change of traction power. It also reduces enroute detention of both the coaching and freight trains leading to improvement in the average speed of trains. It has the potential to introduce more trains in these sections due to the enhancement of sectional capacity. It is also an environment-friendly means of powering the trains, while saving fuel costs simultaneously. (Ch.Rakesh) Chief Public Relations Officer
COMMENTS
NO Comments. Be the first to Comment...
|