For a Proper experience on Trainspy.com, enable JavaScript in your browser

Train Search








0 Trains from (SKP)SHANKARPALLI to (BDHN)Bodhan


Address: Shankarpalli, Andhra Pradesh 501203, India

Station Code: SKP

Station Name: SHANKARPALLI

Zone: SCR/South Central

Train Frequency Weekly: 153

Station Traffic: High

Address: Bellal Rd, Bodhan, Nizamabad Dist. Telangana

Station Code: BDHN

Station Name: Bodhan

Zone: SCR/South Central

Train Frequency Weekly: 37

Station Traffic: Low





Trains
To Check Ticket Availibility Click Classes
Since no Direct Trains Try Nearest Via Stations
Nearest From (SKP)SHANKARPALLI
(fm)kcg falaknuma 39Kms from (SKP)SHANKARPALLI
(kcg)kacheguda 40Kms from (SKP)SHANKARPALLI
(mxt)malakpet kcg 41Kms from (SKP)SHANKARPALLI

Nearest From BDHN
(nzb)nizamabad 23Kms from (BDHN)Bodhan
(kmc)kamareddi 60Kms from (BDHN)Bodhan
(bmo)bolarum 142Kms from (BDHN)Bodhan
Train Type Train Table Info
SuperFast
Click On Function
Headers Sort-
Background Colour Code
Train No Detail Information About Train on new tab
Train Name Route Time Table & Fare of Train 
From & To Detail Information About Station on new tab
Classes Ticket Availibility
Mail/Express
Rajdhani
Shatabdi
Janshatabdi
Garibrath/Yuva
Duronto
Spl Tourism Trains






RECENT NEWS

1
   

SOUTH CENTRAL RAILWAY
PRESS RELEASE
PUBLIC RELATIONS OFFICE, SECUNDERABAD - 500 071
No.141/2023-2414-06-2023
Secunderabad
PR No. 141 - Special Trains between Secunderabad and Nagarsol

In order to clear extra rush of passengers during summer season, SCR will run six weekly special trains between Secunderabad - Nagarsol as detailed below: -

 

Sl. No

Train. No

From-To

Dep

Arr

JCO

1

07517

Secunderabad - Nagarsol

17.00 (Wed)

08.00 (Thu)

14th, 21st & 28th June, 2023

2

07518

Nagarsol – Secunderabad

22.00 (Thu)

10.50
(Fri)

15th, 22nd & 29th June, 2023

1. Train no. 07517/07518 Secunderabad – Nagarsol – Secunderabad Special Trains (06 Services):

These special trains will stop at Lingampalli, Shankarpalli, Vikarabad, Zahirabad, Bidar, Bhalki, Udgir, Latur Road, Parli Vaijnath, Gangakher, Parbhani, Manwath Road, Selu, Jalna, Aurangabad and Rotegaon in both the directions.

            All these special trains will consist of AC II cum III tier, AC II Tier, AC III Tier, Sleeper Class, and General Second-class Coaches





2
   

SOUTH CENTRAL RAILWAY
PRESS RELEASE
PUBLIC RELATIONS OFFICE, SECUNDERABAD - 500 071
No.974/2022-2320-03-2023
Secunderabad
PR No. 974 SCR completes 73 Route Kilometers of Electrification Between Nizamabad - Kamareddi & Jankampet - Basar sections

 

-Part of Manmad – Mudkhed – Dhone Electrification Project

-This provides continuous electrified rail line facility from Secunderabad to Basar

 

South Central Railway has taken another significant step towards completion of “Mission Electrification” by electrifying important stretches in Northern Telangana region. As part of it, two vital sections i.e., Nizamabad – Kamareddi (for a distance of 50 Route Kms) and Jankampet – Basar (for a distance of 23 Kms) have been electrified. These sections are located in the important route connecting Telangana region with Maharashtra and other Northern parts of the country. Importantly, electrification of these sections provides continuous electrified rail-line facility for a distance of 210 Kms from Secunderabad to Basar, including the branch line between Jankampet to Bodhan. 

 

Electrification of Nizamabad – Kamareddi & Jankampet – Basar sections have been completed as part of the Manmad – Mudkhed – Dhone electrification project. This project was sanctioned in the year 2015-16 for a distance of 783 Kms, at an estimated cost of Rs 865 Crores.  The section between Manoharabad – Mahabubnagar is excluded from this project, and it was taken up and completed as a separate project. The length of the project in Telangana is approximately 300 Kms between Dharmabad – Kurnool City (excluding Manoharabad - Mahabubnagar). The project has been taken up in different phases leading to completion of several sections: 26 Route Kilometers (RKms) of electrification between Nizamabad - Jankampet - Bodhan was completed in March 2022, 67 RKms of electrification between Manoharabad - Kamareddi was completed in October 2022 and 72 Rkm of electrification between Mahabubnagar - Gadwal was completed in November 2022.  Now with the electrification of two new sections, the stretches from Secunderabad to Basar and Secunderabad - Gadwal stands electrified. Simultaneously, works are nearing completion in the remaining section of this project.

 

The electrification of these rail lines helps in providing seamless movement of trains by avoiding change of traction power. It also reduces enroute detention of both the coaching and freight trains leading to improvement in the average speed of trains. It has the potential to introduce more trains in these sections due to the enhancement of sectional capacity. It is also an environment-friendly means of powering the trains, while saving fuel costs simultaneously.

Shri Arun Kumar Jain, General Manager, South Central Railway has congratulated the entire staff & Officers of Electrical department and Hyderabad division for executing the electrification works within the stipulated time. The General Manager has stated that Manmad - Mudkhed - Dhone electrification project is o­ne of the important electrification projects being executed in the Zone and o­nce the entire project is completed, it helps providing seamless rail connectivity and enhances operational efficiency.  


(Ch.Rakesh)
Chief Public Relations Officer





COMMENTS

NO Comments. Be the first to Comment...

Add Comment






Submit