For a Proper experience on Trainspy.com, enable JavaScript in your browser

Train Search








1 Trains from (JSA)JASAI to (RMX)RAMSAR


Address: Jasai, Pin 344001, India Rajasthan

Station Code: JSA

Station Name: Jasai

Zone: NWR/North Western

Train Frequency Weekly: 13

Station Traffic: Low

Address: Barmer Rajasthan

Station Code: RMX

Station Name: Ramsar

Zone: NWR/North Western

Train Frequency Weekly: 13

Station Traffic: Low





Trains
To Check Ticket Availibility Click Classes
TrainTrain NameFromDepToArrTimeDaysClassesStatus
54881BME MBF PASSBME07:30RMX08:230:53M,TU,W,TH,F,SA,SUUNRESERVED54881 Status
Train Type Train Table Info
SuperFast
Click On Function
Headers Sort-
Background Colour Code
Train No Detail Information About Train on new tab
Train Name Route Time Table & Fare of Train 
From & To Detail Information About Station on new tab
Classes Ticket Availibility
Mail/Express
Rajdhani
Shatabdi
Janshatabdi
Garibrath/Yuva
Duronto
Spl Tourism Trains






RECENT NEWS

1
2021/08/3123-08-2021
Central Railway Launches Open Web Girders for Nerul/Belapur-Uran Project - A Step Towards Connecting Uran With Mumbai

Central Railway
Press Release
Central Railway Launches Open Web Girders for Nerul/Belapur-Uran Project 

A Step Towards Connecting Uran With Mumbai
Despite the Covid-19 challenges, Central Railway has launched two 61-meter open web girders for Nerul/Belapur - Uran Project between Jasai & JNPT operating a block of 3 hours recently. It is a step towards connecting Uran with Mumbai Suburban Network. These 61-meter open web girders were fabricated at Central Railway Engineering Workshop, Manmad, transported and assembled at the launching site. Each girder weight is 232 MT (220 MT girder + 12MT lifting beam, holding bracket etc.)
The launching of girders is a complex job considering the line crossing with Panvel-Jasai-JNPT line which handles heavy container traffic and Dedicated Freight Corridor line is also under construction from JNPT to Panvel along the alignment. These girders were launched by 2 Crawler Road Cranes (1st crane= 600MT lifting capacity, 2nd crane = 500MT lifting capacity + 1 additional crane for emergency use of 750MT lifting capacity).
To ensure safe lifting of girders, it was maintained verticality by a specially developed lifting frame. During lifting, rotational movement was monitored by three inclinometers manufactured for this bridge. Inclinometers were used for the first time. Besides, Railway’s own structural testing unit was deployed by the bridge organization of Central Railway to capture the launching stresses in critical members.  Six stain gauge and two accelerometers were used for this and the launching was carried out without overstressing any members.  Down track web girder was successfully launched o­n 3rd July 2021 and Up track web girder was launched o­n 12th Aug 2021 taking 03:00 hrs Traffic and Power block each o­n Jasai-JNPT line. With this launching, the progress of the Phase-II of this line is in advance stage.
Background - Works Carried Out During Lockdown
The major construction of this 4th corridor of Mumbai Suburban Corridor were superstructure work of Cover over Platform at Rajanpada station, foundation and sub-structure work at Nava-Sheva, Dronagiri and Uran stations, subway work at Uran, bridge foundation work, stressing and lowering of U-girder at bridge.  The stretch of Kharkopar – Uran will have 5 stations, 2 major bridges, 46 minor bridges, 4 Road Under Bridges and 4 Road Over Bridges.  All precautions are taken to ensure safety and health of the available labour. The project will help to accelerate the growth of Navi-Mumbai, by providing direct access between Uran town and Nhava-Sheva port and the newly developed area of Mumbai Metropolitan Region as well as Greater Mumbai.
--- ---- 
Date: August 23, 2021
PR No. 2021/08/31
This press release is issued by the Public Relations Department, Central Railway, Chhatrapati Shivaji Maharaj Terminus Mumbai.


(Shivaji Sutar)
Chief Public Relations Officer





COMMENTS

NO Comments. Be the first to Comment...

Add Comment






Submit