1 Trains from (GOS)Ghosrana to (ao)aonla
Address: Ghosrana, Kheril Rajasthan
Station Code: GOS
Station Name: Ghosrana
Zone: NCR/North Central
Train Frequency Weekly: 47
Station Traffic: Low
Address: Aonla Railway Station, Uttar Pradesh 243301, India
Station Code: AO
Station Name: AONLA
Zone: NR/Northern
Train Frequency Weekly: 111
Station Traffic: Medium
Trains
|
||||||||||||||||||||||||||||||||||||||||||||||||||||
To Check Ticket Availibility Click Classes | ||||||||||||||||||||||||||||||||||||||||||||||||||||
|
RECENT NEWS
1
www.ncr.indianrailways.gov.in- 2022-04-02
North Central Railway carried out electrification of 439 Route Kilometers in 2021-22 652 track kilometers electrification completed by NCR 42 pairs of mail/express trains taken over from Diesel to Electric traction during 2021-22 7 new Traction substations commissioned during 2021-22 In pursuance of Mission 100% electrification, North Central Railway is carrying out electrification of its all routes and of the missing links on war footage. Financial Year 2021-22 proved to be an year of achievements for NCR where massive electrification works got completed in the Zone. NCR total Broad Gauge network stands at 3222 Route kilometers(RKM), out of which now 3146 kilometers have been electrified. Thus 98% of the total broad gauge network of NCR has been electrified now. The work for remaining 76kilometers is in advanced stage and is targeted to be completed shortly. In 2021-22, electrification of following routes was completed: Mahoba- Khajuraho of Jhansi Division (64 RKM) Khajuraho-Ishanagar of Jhansi Division (57 RKM) Birlanagar- Udimore of Jhansi Division (101 RKM) Mainpuri- Shikohabad of Prayagraj Division (51 RKM) Mainpuri-Farrukhabad, along with Etawah-Mainpuri, Prayagraj Division (107 RKM) Barhan-Etah of Prayagraj Division (59 RKM) With these electrification works, Railway network spanning through the parts of districts of Etah, Mainpuri, Farrukhabad, Etawah, Firozabad and Agra of Uttar Pradesh and those of Gwalior, Bhind, Tikamgarh and Chhatarpur of Madhya Pradesh will now be served through electrified territories. The significance of these massive electrification works lie in the fact that it will reduce the bottleneck of change of traction when a train coming from Electric locomotive arrives in a non-electrified territory. Since the requirement of changing of traction is done away with, it increases mobility and thereby is a leap ahead in improving the punctuality of trains. In Financial Year 2021-22, 42 pairs of mail/express trains running through NCR were taken over from diesel to electric traction after completion of major electrification works in NCR and different sections of other zones. Three more pairs of trains will be taken over on Electric Traction after issue of CRS sanction of Etah-Barhan section, Commissioner of Railway Safety (CRS) inspection of which has already been carried out. Principal Chief Electrical Engineer NCR Shri Satish Kothari informs that in addition to the electrification of these major routes, all the new doubling or tripling works are being opened along with electrification. Newly laid Jhansi- Babina third line (Jhansi Division), Bhuteshwar-Chhata fourth line (Agra Division), Dholpur-Bhandai third line (Agra Division) and sections opened in Kanpur-Virangana Lakshmibai section (Jhansi Division) are fully electrified. Massive electrification of existing sidings has also been done in 2021-22. As a result of all these, NCR successfully carried out 652 Track kilometers of electrification in the financial year. Giving impetus to the power supply installations, 7 new Traction substations were commissioned in 2021-22 namely Chunar, Saifai and Bhongaon (Prayagraj Division); Newari and Harpalpur (Jhansi Division) and Ghosrana and Bhandai of Agra Division. General Manager NCR Shri Pramod Kumar who conducted numerous inspections in field and called a series of meeting of all the stake holders to get these electrification works completed well in time says that not only punctuality of trains will increase but time taken in placements and removals of goods trains in sidings will alsocome down. “Electrification will also bring environmental benefits along with the improvement in mobilityâ€, says Shri Pramod Kumar. 2
www.wr.indianrailways.gov.in- 2021-07-20
WESTERN RAILWAY TO RUN THREE PAIRS OF SPECIAL TRAINS For the convenience of passengers and with a view to meet the travel demand, Western Railway has decided to run three pairs of Special Trains till further advice. According to a press release issued by Shri Sumit Thakur – Chief Public Relations Officer of Western Railway, details of these trains are as under: 1.Train No. 04319/04320 Indore – Bareilly Special Express (Weekly) Train No. 04319 Indore – Bareilly Special Express will depart from Indore at 16.47 hrs every Thursday and reach Bareilly at 15.20 hrs on the next day, w.e.f. 29thJuly, 2021 till further advice. Similarly, Train No. 04320 Bareilly – Indore Special Express will depart from Bareilly at 11.25 hrs every Wednesday and reach Indore at 08.55 hrs on the next day, w.e.f. 28th July, 2021 till further advice. Enroute this train will halt at Dewas, Ujjain Jn., Berchha, Shujalpur, Sehore, Sant Hirdaram Nagar, Vidisha, Bina Jn, Jhansi Jn, Gwalior Jn., Agra Cantt, Agra Fort, Aligarh Jn., Bahjoi, Chandausi Jn. and Aonla stations in both directions. The train comprises of AC 2-Tier, AC 3-Tier, Sleeper Class and Second Class Seating coaches. 2.Train No. 04309/04310 Ujjain – Dehradun Ujjaini Special Express (Bi-Weekly) Train No. 04309 Ujjain – Dehradun Ujjaini Special Express will depart from Ujjain at 21.05 hrs every Wednesday & Thursday and reach Dehradun at 19.45 hrs on the next day, w.e.f. 28th July, 2021 till further advice. Similarly, Train No. 04310 Dehradun – Ujjain Ujjaini Special Express will depart from Dehradun at 05.50 hrs every Tuesday & Wednesday and reach Ujjain at 04.00 hrs on the next day, w.e.f. 27thJuly, 2021 till further advice. Enroute this train will halt at Maksi, Shajapur, Pachor Road, Biyavra Rajgarh, Kumbhraj, Ruthiyai, Guna, Shivpuri, Gwalior Jn., Morena, Dhaulpur, Agra Cantt, Mathura Jn, Kosi Kalan, Faridabad, Hazrat Nizamuddin, Ghaziabad, Meerut City, Muzaffarnagar, Deoband, Saharanpur, Roorkee and Haridwar Jn stations in both directions. Train No. 04310 will have an additional halt at Raja Ki Mandi station. The train comprises of AC 2-Tier, AC 3-Tier, Sleeper Class and Second Class Seating coaches. 3.Train No. 04317/04318 Indore – Dehradun Special Express (Bi-Weekly) Train No. 04317 Indore – Dehradun Special Express will depart from Indore at 18.40 hrs every Saturday & Sunday and reach Dehradun at 19.45 hrs on the next day, w.e.f. 24st July, 2021 till further advice. Similarly, Train No. 04318 Dehradun – Indore Special Express will depart from Dehradun at 05.50 hrs every Friday & Saturday and reach Indore at 06.10 hrs on the next day, w.e.f. 23nd July, 2021 till further advice. Enroute this train will halt at Dewas, Ujjain Jn, Maksi, Shajapur, Pachor Road, Biyavra Rajgarh, Chachaura Binaganj, Ruthiyai, Guna, Shivpuri, Gwalior Jn., Morena, Dhaulpur, Agra Cantt, Mathura Jn, Faridabad, Hazrat Nizamuddin, Ghaziabad, Modinagar, Meerut City, Muzaffarnagar, Deoband, Saharanpur, Roorkee and Haridwar Jn. stations in both directions. Train No. 04318 will have an additional halt at Raja Ki Mandi station. The train comprises of AC 2-Tier, AC 3-Tier, Sleeper Class, Second Class Seating coaches. The booking of Train Nos. 04319, 04309 will open from 24th July, 2021 and 04317 will open from 22ndJuly, 2021 at nominated PRS counters and IRCTC website. Above trains will run as fully reserved trains. For detailed information regarding timings of halts and composition, passengers may please visit www.enquiry.indianrail.gov.in. It is worth mentioning that only passengers having confirmed tickets will be permitted to board these special trains. Passengers are requested by Western Railway, to adhere to all norms, SOPs related to COVID-19 during boarding, travelling and at the destination. *****************
COMMENTS
NO Comments. Be the first to Comment...
|