For a Proper experience on Trainspy.com, enable JavaScript in your browser

Train Search








1 Trains from (AA)Ataria to (BBK)BARABANKI JN


Address: Sitapur National Highway 24 Uttar Pradesh

Station Code: AA

Station Name: Ataria

Zone: NER/North Eastern

Train Frequency Weekly: 37

Station Traffic: Low

Address: Barabanki, Uttar Pradesh, India

Station Code: BBK

Station Name: BARABANKI JN

Zone: NR/Northern

Train Frequency Weekly: 451

Station Traffic: High





Trains
To Check Ticket Availibility Click Classes
TrainTrain NameFromDepToArrTimeDaysClassesStatus
15010STP GKP EXPRESSSD20:14BBK23:533:39M,TU,W,TH,F,SA,SU3A,SL,GN,15010 Status
Train Type Train Table Info
SuperFast
Click On Function
Headers Sort-
Background Colour Code
Train No Detail Information About Train on new tab
Train Name Route Time Table & Fare of Train 
From & To Detail Information About Station on new tab
Classes Ticket Availibility
Mail/Express
Rajdhani
Shatabdi
Janshatabdi
Garibrath/Yuva
Duronto
Spl Tourism Trains






RECENT NEWS

1
11027-04-2023
Maligaon
Hon’ble Prime Minister Shri Narendra Modi dedicated to the Nation; Railway projects worth more than 6,000 cr in Assam

Maligaon, 14th April, 2023:

On this auspicious day of Bohag Bihu, Hon’ble Prime Minister Shri Narendra Modi dedicated 249 kms of Double line, 86 km of New Line and 512 kms of Electrified railway track of Assam to the Nation during a programme held at Guwahati o­n 14th April, 2023. Shri Gulab Chand Kataria, Hon’ble Governor of Assam; Dr. Himanta Biswa Sarma, Hon’ble Chief Minister of Assam; Shri Sarbananda Sonowal, Hon’ble Union Minister of Ports, Shipping & Waterways and Ayush; Shri Rameswar Teli, Hon’ble Union Minister of State for Petroleum and Natural Gas and Labour & Employment and Shri Bimal Borah, Hon’ble Minister, Govt. of Assam were also present o­n the occasion.

Speaking o­n the occasion Hon’ble Prime Minister mentioned that there was always the issue of lack of physical connectivity in the Northeast, which is being addressed by the present government by laying emphasis o­n road, rail and air connectivity. During last 9 years broad gauge trains reached Manipur, Mizoram, Meghalaya, Arunachal Pradesh and Tripura. New rail lines are being laid in the Northeast three times faster than before, and the doubling of rail lines taking place at almost 10 times faster than earlier. The Prime Minister highlighted that 5 railway projects that have been inaugurated today worth more than 6,000 crore rupees will accelerate the development of a large part of the region including Assam. The Prime Minister further added that rail has reached a large part of Assam for the first time and the doubling of rail lines will provide easy connectivity to Assam as well as Manipur, Mizoram, Tripura and Nagaland. He also noted that traveling to places of faith and tourism will now become easy.

These newly constructed lines will change the rail transportation scenario o­n this area. More and more trains including trains carrying essential commodities will be able to reach the Northeastern states in a much lesser time from production centers spreading all over the country. The Digaru to Lumding 147 km long double line section was constructed at a cost of Rs. 2,538 crs. Construction of 17 Major Bridges, 106 Minor Bridges and 07 Road Over Bridges are involved. This section passes through the Kamrup (Metro), Marigaon and Nagaon districts of Assam. It helped in reducing the operational constraints of the route which is responsible for all train movements towards states like Nagaland, Mizoram, Manipur, Tripura apart from South and Upper Assam areas.

The New Bongaigaon – Dhupdhara 102 km long section was constructed as part of the o­ngoing New Bongaigaon – Goalpara-Kamakhya 176 km long doubling project. Construction of 35 Major Bridges, 228 Minor Bridges and 24 Road Under Bridges are involved in this section. The project cost was Rs. 1,962 crs. Passing through the Bongaigaon and Goalpara districts of Assam, it will be beneficial for operating trains towards NE region.

Gauripur – Abhayapuri 86 km new line section is part of the New Mainaguri (in West Bengal) to Jogighopa (in Assam) 279 km long new Railway line project. It passes through 5 stations namely Alamganj, Bagribari, Bilasipara, Chapar and Bechimari. With the completion of this section, population of a huge area falling under the Dhubri and Bongaigaon districts of Assam got the benefit of Railway service for the very first time. Constructed at a cost of Rs. 1,267 cr, it involves construction of 30 Major Bridges, 305 Minor Bridges, 03 tunnels, 133 Road Under Bridges and 02 Road Over Bridges.

As part of the Indian Railways ambitious plan to become the largest “GREEN RAILWAYS” in the world, it plans to become a zero carbon emission network by 2030. Newly electrified 381 km Raninagar Jalpaiguri – Guwahati and 131 km Chaparmukh – Senchoa & Senchoa – Mairabari sections will lead to seamless connectivity of trains to and from Northeast to various metro cities like New Delhi, Chennai, Mumbai, Kolkata, Ahmedabad etc. Running of heavy hauled goods train towards Northeast became possible. Train operation cost also reduced significantly due to savings o­n fossil fuel consumption.



(Sabyasachi De)
CPRO/N.F.Railway




2
17-03-2023
Diversion of trains due to non –interlocking work on Lucknow Division

New Delhi

Date 17.03.2023

 

Diversion of trains due to non –interlocking work o­n Lucknow Division

It is notified for the information of the general public that due to non-interlocking work in connection with doubling work of Goshaiganj -Ulnabhari -Bilharghat -Darshan Nagar o­n Barabanki-Ayodhya Cantt-Akbarpur-Zafrabad section over LKO Division from 19.03.2023 to 26.03.2023, the following trains shall remain temporarily diverted as under :  

 

Sr.

Train

Train Name

Diverted via

JCO EFFECTIVE FROM

1

13009

HOWRAH- YOGNAGRI RISHIKESH

via VARANASI-PRATAPGARH-LUCKNOW

18/03/23 to 25/03/23

2

13010

YOGNAGRI RISHIKESH -HOWRAH

via LUCKNOW-PRATAPGARH-VARANASI

18/03/23 to 25/03/23

3

13307

DHANBAD-FEROZPUR

via VARANASI-PRATAPGARH-LUCKNOW

18/03/23 to 25/03/23

4

13308

FEROZPUR-DHANBAD

via LUCKNOW-PRATAPGARH-VARANASI

18/03/23 to 25/03/23

5

18103

TATA-AMRITSAR

via VARANASI-PRATAPGARH-LUCKNOW

20/03/23, 22/03/23

6

18104

AMRITSAR-TATA

via LUCKNOW-PRATAPGARH-VARANASI

22/03/23, 24/03/23

7

15636

GUWAHATI-OKHA

via VARANASI-PRATAPGARH-LUCKNOW

20-03-2023

8

15635

OKHA-GUWAHATI

via LUCKNOW-PRATAPGARH-VARANASI

24-03-2023

9

15668

KAMAKHYA-GANDHIDHAM

via VARANASI-PRATAPGARH-LUCKNOW

22-03-2023

10

15667

GANDHIDHAM-KAMAKHYA

via LUCKNOW-PRATAPGARH-VARANASI

18-03-2023

11

14017

RAXUAL-ANAND VIHAR T.

via VARANASI-SULTANPUR-LUCKNOW

23-03-2023

12

14018

ANAND VIHAR T.-RAXUAL

via LUCKNOW-SULTANPUR-VARANASI

22-03-2023

13

22103

LOKMANYA TILAKT.-AYODHYA CANTT

via PFM-PRATAPGARH-SULTANPUR-AYODHYA CANTT

20-03-2023

14

13238

KOTA - PATNA

via LUCKNOW-SULTANPUR-ZAFRABAD

19/03/23, 23/03/23, 24/03/23

15

15934

AMRITSAR-NEW TINSUKIA

via LUCKNOW-SULTANPUR-ZAFRABAD

24-03-2023

16

19321

INDORE - PATNA

via LUCKNOW-SULTANPUR-ZAFRABAD

18/03/23, 25/03/23

17

13483

MLDT -DELHI

via ZAFRABAD-SULTANPUR-LUCKNOW

19/03/23, 21/03/23, 22/03/23, 24/03/23

18

13484

DELHI-MALDA TOWN

via LUCKNOW-SULTANPUR-ZAFRABAD

19/03/23, 21/03/23, 23/03/23, 24/03/23

19

13509

ASN-GONDA

via CHHAPRA-BHATANI-GORAKHPUR-GONDA

21-03-2023

20

13510

GONDA-ASANSOL

via GONDA-GORAKHPUR-BHATANI-MAU

22-03-2023

21

15715

KNE-AII

via BBK-GORAKHPUR-CHHAPRA

19/03/23, 21/03/23, 24/03/23

22

15716

AJMER-KISHANGANJ

via CHHAPRA-GORAKHPUR-BARABANKI

20/03/23, 21/03/23, 23/03/23

23

14649

 JYG-AMRITSAR

via JAYNAGAR-GORAKHPUR-BARABANKI (14673 route)

19/03/23, 21/03/23, 24/03/23, 26/03/23

24

14650

AMRITSAR-JAYNAGAR

via BARABANKI-GORAKHPUR-JAYNAGAR (14674 route)

18/03/23, 20/03/23, 22/03/23, 25/03/23

25

15025

MAU-ANAND VIHAR T.

COMMENTS

NO Comments. Be the first to Comment...

Add Comment






Submit