For a Proper experience on Trainspy.com, enable JavaScript in your browser

Search For Trains   

Kodambakkam

STATION INFO

Address: Mambalam High Rd, Kodambakkam, Chennai Tamil Nadu

Station Code: MKK)Kodambakka

Station Name: MKK)Kodambakkam

Zone: SR/Southern

Total Unique Trains: 1

Train Frequency Weekly: 7

Station Traffic: Low

ALL PASSING TRAINS
Print Table

To Check Ticket Availibility Click Classes
TrainTrain NameArrDepHaltDaysClasses
Arrival
66043MSB MLMR MEMU08:4208:431M,TU,W,TH,F,SA,SUUNRESERVED
TrainTrain NameArrDepHaltDaysClasses
Departure



RECENT NEWS

1
615/2022-2326-01-2023
Chennai
Southern Railway Celebrates 74th Republic Day


Southern Railway celebrated 74rd Republic Day with fanfare today (26.01.2023) at the Railway Stadium, Perambur, Chennai. Shri R.N. Singh, General Manager, Southern Railway unfurled the National Flag and took the salute at the RPF Parade in the presence of Shri G.M. Eswara Rao, Principal Chief Security Commissioner, Principal Heads of Departments, other officers and staff of  Southern Railway.


Addressing the gathering, the General Manager highlighted the achievements of Southern Railway and urged railway Officers and staff to devote themselves to reaching the organization's objectives.


Later, a team of Women RPF personnel demonstrated their outstanding skills in Karate. Colourful cultural performances followed which include a dance number performed by Railway school students.


The 74th Republic Day was also celebrated in workshops, divisional offices and other field units all over Southern Railway with patriotic fervour.  A large number of Officers, staff and their families enthusiastically participated in these events. At Chennai, Shri Ganesh Divisional Railway Manager, Chennai Division unfurled the National Flag at Divisional Office, NGO Annexe, Park Town,Chennai. At Southern Railway Construction Office, Egmore, Shri V.K.Gupta, Chief Administrative Officer, unfurled the National Flag. At the Railway Electrification Office, Shri Sameer Dighe, Chief Project Director, unfurled the National Flag and at the Joint Republic Day celebrations of the Perambur Workshops viz., Loco Works, Carriage Works and Electrical Works/Perambur Shri N.K. Nandanwar, Chief Workshop Manager, Loco Works, unfurled the National Flag while the President, Southern Railway Women’s Welfare Organisation (HQ) unfurled the National flag at ‘Ashraya’, a school for special children run by SRWWO at Chennai Egmore.


In the afternoon, a commemorative heritage run of EIR-21, the world’s oldest working steam locomotive, will be conducted between Chennai Egmore and Kodambakkam.  The heritage run attracted a large crowd of children, passengers, rail enthusiasts, and members of the general public.


Excerpts from General Manager’s Republic Day Speech


ØSouthern Railway has witnessed a healthy growth o­n all fronts namely Earnings, Loading, Safety, Punctuality, Project Commissioning and Passenger Amenities


ØIn augmenting infrastructure for improved efficiency and speed of freight and passenger trains, 116.32 kms of Doubling and Gauge conversion works so far as against 35.47 Kms done during 2021-22, which is a 250% increase. 


ØAs part of Mission 100% Railway Electrification, 188 Route km were electrified in S.Rly in 2022. With this 87% of route km in SR has got electrified totaling 4393 electrified Rkm up to 31.12.2022.


ØDuring the nine month period in this financial year (April – December 2022), Southern Railway has registered an excellent growth of 47.46% in Gross earnings compared to 2021-22. 


ØIn Freight Loading, Southern Railway has registered 28% increase during Apr-Dec 2022 over the same period last year.


ØThe punctuality of 93.2% surpassed the Railway Board target of 92%.


ØTo improve mobility, we have enhanced the speed over 743 Route kms during this year as against 137 Route Kms done in 2021-22


ØVande-Bharat train was introduced from 12.11.2022 between Chennai and Mysuru.


ØSouthern Railway has provided LHB rakes to 16 trains in place of ICF rakes.


ØOur Electric Loco Shed/Arakkonam has been adjudged as best performing shed in Indian Railways this year with least failures in conventional locos.


Ø43 LC gates have been interlocked thereby increasing the safety at level crossing gates. State of the art Electronic Interlocking System conforming to the latest international safety standard have been provided at 21 stations in the year 2022-23, thereby enhancing Reliability of Signaling assets.


ØAs part of Hon’ble PM’s ambitious project of Redevelopment of important stations to world class standards with airport-like facilities, contracts for Chennai Egmore, Katpadi, Puducherry, Madurai, Rameswaram, Kanniyakumari, Ernakulam Jn, Kollam and Ernakulam Town stations have been awarded by Southern Railway and the works are progressing at a brisk pace.


ØOur RPF has been doing an excellent job in ensuring the safety of our assets as well as the security of passengers. During the year, 634 offenders were arrested with the recovery of railway property and 88 persons were arrested with seizure of Hawala Money, Gold/Silver worth Rs.33 crores. 


ØA total of 2,205 runaway children were rescued by RPF and handed over to the concerned authorities.  In a humanitarian gesture, RPF field personnel saved the precious lives of 62 passengers during the year.

       

Follow us

www.sr.indianrailways.gov.in

https://twitter.com/GMSRailway

https://www.facebook.com/Southern-Railway-240606622749869/



(D. Om Prakash Narayan)
Sr.PRO




2
416/2022-2331-10-2022
Chennai
CHAIRMAN & CEO OF RAILWAY BOARD HOLDS REVIEW MEETING WITH SOUTHERN RAILWAY OFFICIALS AFTER INSPECTION OF KORUKKUPET GOODS SHED, AND DR MGR CHENNAI CENTRAL/MMC

Shri Vinay Kumar Tripathi, Chairman & Chief Executive Officer of Railway Board, held a review meeting at Southern Railway Headquarters today 29th October 2022 with               Shri B.G.Mallya, General Manager, Southern Railway, Principal Heads of All Departments and the Divisional Railway Managers of Chennai, Salem, Tiruchchirappalli, Madurai, Palakkad and Thiruvananthapuram.

During the review meeting, a presentation was made o­n the performance highlights of Southern Railway. The Chairman and CEO reviewed the progress of various infra and developmental works in Southern Railway including Gauge Conversion, Doubling, Electrification, Station Redevelopment of 9 stations of Southern Railway, Gati Shakti Initiatives, Road Safety Works, Speeding of Sections, Bharat Gaurav Trains, Progress of Implementation of Hand Held Terminals and o­ne Station o­ne Product Scheme in Railway Stations.

Earlier, in the morning, Shri Vinay Kumar Tripathi, Chairman & CEO of Railway Board accompanied by Shri B.G.Mallya, General Manager, Southern Railway, Principal Heads of Depts, and Divisional Railway Manager, Chennai, inpected the Korukkupet goods shed and took stock of the facilities available at the goods shed.

Later, the Chairman, Railway Board inspected the hotline cleaning of insulators, a procedure where insulators o­n electrical lines are cleaned with water while the lines are energized. At Dr MGR Chennai Central, Shri Tripathi inspected the Prakriti Twin Coach Tower Car which is used in OHE (Over Head Equipment) inspection, maintenance and hotline monitoring. Later, he visited the newly opened o­ne Station o­ne Product Kanchipuram Silk Saree Stall at Chennai Suburban Terminus (MMC) and interacted with rail users. After the inspection, the Chairman Railway Board met the representatives of recognized trade unions/associations.

During his visit, Shri Vinay Kumar Tripathi, Chairman and CEO, Railway Board, through Video Conferencing unveiled the eplaques of four successfully completed projects over Chennai Division, viz., New Electronic Interlocking Systems at Walajah Road, Thalangai, Arambakkam, Tada and Pedaperiya Railway Stations,  MSDAC System (Multi Section Digital Axle Counter) and Centralisation of Auto – Signaling System in nine Auto Sections of Chennai Egmore – Kodambakkam, Ambattur – Avadi, Sholingur – Thalangai, Kavanur - Gudiyatham, Latheri – Kavanur, Melpakkam – Chitteri, Arakkonam – Tiruvalangadu, Tiruvallur – Kadambattur and Valathoor – Melpatti Sections. MSDAC System at Dr MGR Chennai Central and Chennai Egmore Railway Stations, and Flower Turbine windmill at Moore Market Complex, NGO Building and Light House Station.  

Brief about the Projects Unveiled 

The Signal System upgradation at Chennai Railway Division of Southern Railway, with a route length of 697 kilometres  is towards upgrading the main routes like Chennai – Gudur, Chennai – Jollarpet and Egmore – Tambaram for better speeds. The MSDAC system uses Electromagnetic Sensors, that-is, Detection Points which are installed o­n Tracks. Detection Points are responsible for counting of wheel axles, speed, and direction of train. These Detection Points are connected to Evaluators at Central Location using Telecom cables. The wheel counts as well as health of the field units are continuously transmitted to Central Evaluator by means of telegram packets. The Central Evaluator receives the packets from all the Detection Points and evaluates vacancy status of different track sections and generates vital output. These sections and systems are kept future-ready for integration and implementation of KAVACH without any requirement for additional outdoor cable laying.

As a step towards achieving and generating electricity for its needs, Chennai Division of Southern Railway has installed 3 Nos of 1.5 Kilo watt Peak Hybrid – Solar , Wind, o­n grid systems at the Moore Market Complex, NGO Building and Light House Station; at a cost of        Rs. 8.58 Lakhs providing an Annual Power Generation of 5475 units and an estimated annual savings of Rs. 43,800.



(D. Om Prakash Narayan)
Sr.PRO







COMMENTS

NO Comments. Be the first to Comment...

Add Comment






Submit


Latest Search