For a Proper experience on Trainspy.com, enable JavaScript in your browser

Search For Trains   

DAINHAT

STATION INFO

Address: Dainhat, Daihaat Rd, Pin - 713502 , Dist - Purba Bardhaman West Bengal

Station Code: DHAE)DAINHA

Station Name: DHAE)DAINHAT

Zone: ER/Eastern

Total Unique Trains: 3

Train Frequency Weekly: 17

Station Traffic: Low

ALL PASSING TRAINS
Print Table

To Check Ticket Availibility Click Classes
TrainTrain NameArrDepHaltDaysClasses
Arrival
73151SDAH JRLE DEMU08:4908:501M,TU,W,TH,F,SAUNRESERVED
73152JRLE SDAH DEMU16:3416:351M,TU,W,TH,F,SAUNRESERVED
53002AZ HWH PASS23:1523:161M,TU,W,TH,F,SA,SUUNRESERVED
TrainTrain NameArrDepHaltDaysClasses
Departure



RECENT NEWS

1
09-03-2022
Press Release: REGULATION OF TRAINS FOR CONSTRUCTION OF LIMITED HEIGHT SUBWAY BETWEEN PURBASTHALI AND PATULI STATIONS

REGULATION OF TRAINS FOR CONSTRUCTION OF LIMITED HEIGHT SUBWAY BETWEEN PURBASTHALI AND PATULI STATIONS

Kolkata, March 9, 2022:
For construction of Limited Height Subway in place of Level Crossing Gate between Purbasthali & Patuli stations and to replace girders of bridge between Nabadwip Dham & Purbasthali station, 790 minutes (06:00 hrs. to 19:10 hrs.) traffic & power block simultaneously o­n both Up and Down line between Nabadwip Dham and Dainhat stations in Bandel – Katwa double line section of Howrah Division has been planned o­n 13.03.2022 (Sunday). 
Consequently, 2 EMU trains will remain cancelled o­n 12.03.2022.  Moreover, 21 EMU and 02 intercity trains will remain cancelled o­n 13.03.2022.  Further 07 pairs local will be short terminated / originated o­n 13.03.2022:-
Cancellation:
Journey Commencing o­n 12.03.2022:
From Howrah: 37925 & 37927
Journey Commencing o­n 13.03.2022:
From Howrah: 13465, 37911, 37915 & 37919 
From Bandel: 37745, 37747, 37751 & 37753
From Katwa: 37914, 37916, 37918, 37920, 37744, 37922, 37746, 37748, 37924, 37926, 37750, 37752, 37928 & 37754
From Malda: 13466 
Short Termination/Origination: (On 13.03.2022)
1.37741 will be short terminated at Nabadwip Dham at 04:17 hrs. and will leave at 06:55 hrs. for Howrah as passenger special.
2.37743 will be short terminated at Nabadwip Dham at 05:42 hrs. and will leave at 07:46 hrs. for Howrah as passenger special.
3.37913 will be short terminated at Nabadwip Dham at 10:11 hrs. and will leave at 11:56 hrs. for Bandel as passenger special.
4.31111 will be short terminated at Bandel at 09:26 hrs. and 31112 will be short originated from Bandel at 18:07 hrs.
5.37749 will be short terminated at Nabadwip Dham at 13:27 hrs. and will leave at 16:16 hrs. for Howrah as passenger special.
6.37917 will be short terminated at Purbasthali at 14:24 hrs. and will leave at 18:21 hrs. for Bandel as passenger special.

Diversion: 
13141 Up Teesta Torsha Express (Journey Commencing o­n 13.03.2022) and 15643 Up Puri – Kamakhya Express (Journey Commencing o­n 12.03.2022) will be diverted from Bandel via Barddhaman – Rampurhat – Nalhati – Azimganj with stoppage at Barddhaman & Rampurhat.
Moreover, 03003 will be controlled suitably enroute o­n 13.03.2022.
Inconvenience to be caused to the passengers is deeply regretted.




2
21-02-2022
Press Release: LEVEL CROSSING BETWEEN DAINHAT & KATWA REPLACED WITH A LIMITED HEIGHT SUBWAY IN ER’S HOWRAH DIVISION

LEVEL CROSSING BETWEEN DAINHAT & KATWA REPLACED WITH A LIMITED HEIGHT SUBWAY IN ER’S HOWRAH DIVISION

Kolkata, February 21, 2022

A glorious day indeed in the kitty of Howrah division when the engineers of ER’s Howrah Division planned & executed a mega block of 13.40 hrs. o­n 20.3.2022 between Dainhat & Katwa to replace a level crossing with a limited height subway.

Despite small interruption by rains, the work was executed in a planned manner. Divisional engineers, inspectors alongwith 200 labourers worked tirelessly at limited height subway site alongwith two cranes and 4 Poclain machines.

 In the shadow of the mega block, conversion of Bridge No. 205, which was a stone slab bridge between Tenya & Salar by a pre-cast Reinforced Cement Concrete Box, was also planned & executed satisfactorily within the same 11 hours' block, utilizing 140T Railway crane for the work.

Shri Manish Jain, Divisional Railway Manager, Eastern Railway, Howrah congratulated the entire team o­n their success and for their dedicated efforts & maintaining close coordination between various departments of ER’s Howrah division to accomplish such a huge construction work within a record span.













COMMENTS

NO Comments. Be the first to Comment...

Add Comment






Submit


Latest Search