For a Proper experience on Trainspy.com, enable JavaScript in your browser

Search For Trains   

DHUBRI

STATION INFO

Address: Station Road, Bou Bazar, Dhubri, Assam, India

Station Code: DBB)DHUBR

Station Name: DBB)DHUBRI

Zone: NFR/Northeast Frontier

Total Unique Trains: 9

Train Frequency Weekly: 47

Station Traffic: Low

ALL PASSING TRAINS
Print Table

To Check Ticket Availibility Click Classes
TrainTrain NameArrDepHaltDaysClasses
Arrival
15418SHTT APDJ RR EXP05:0005:3030M,W,SASL,GN
55812KYQ DBB FAST PASS06:20Des--M,TU,W,TH,F,SA,SUUNRESERVED
55610FKM DBB PASS07:15Des--M,TU,W,TH,F,SA,SUUNRESERVED
07526NBQ - NJP DEMU SPL08:2008:3010M,TU,W,TH,F,SA,SUUNRESERVED
15765SGUJ DBB INTERCITY EXP13:00Des--M,TU,W,TH,F,SA,SUUNRESERVED
07525NJP - NBQ DEMU SPL17:3017:4010M,TU,W,TH,F,SA,SUUNRESERVED
15417APDJ SHTT RR EXP20:4020:455TU,F,SUSL,GN
TrainTrain NameArrDepHaltDaysClasses
Departure
15766DBB SGUJ INTERCITY EXPSrc13:30--M,TU,W,TH,F,SA,SUUNRESERVED
55811DBB KYQ FAST PASSSrc07:00--M,TU,W,TH,F,SA,SUUNRESERVED



RECENT NEWS

1
12113-05-2022
Maligaon
NFR installs solar panels embedded roof over platform shelters

Indian Railway is striving hard to achieve the target of zero carbon emission by 2030. In an endeavour to minimize dependence o­n fossil fuels, the Northeast Frontier Railway is taking steps to generate green energy more and more by installing solar power plants across the zone. In a step forward to achieve the target of zero carbon emission, Roof-Top Solar power plants have been commissioned throughout the Northeast Frontier Railway generating 4358.233 Kilo Watt Peak (kwp) till March, 2022. This will, in turn, save 44.54 lakh units that amounts to approximately Rs 3.56 crore annually in energy bills.

N. F. Railway step towards its ‘Go-Green’ mission successfully commissioned 585 kwp of solar roof top systems in various stations and other service buildings during the last financial year. Out of 585 kwp, 195 kwp capacity is being commissioned in Lumding station, 100 kwp in Dimapur station and 120 kwp in Kamakhya Coaching Depot under Lumding division. Similarly, 100 kwp capacity is being commissioned in Rangiya station and 10 kwp each in Viswanath Chariali station and Kendriya Vidyalaya/Rangiya under Rangiya division. Further in Alipurduar division, 20 kwp capacity is being commissioned in Dalgaon station and 10 kwp each in Kalchini station, Dhubri station and Salakati station.

In the current financial year, to meet the energy requirements, NFR is all set to commission 1500 kwp capacity of solar roof top systems in its jurisdiction. These include 100 kwp in Silchar station, 200 kwp each in Guwahati station and Kamakhya station under Lumding divison. Apart from all this, 1000 kwp is planned to be commissioned in New Bongaigaon Workshop which is a major workshop under NFR.

During the time when energy prices have taken a sharp hit due to the o­ngoing Ukraine-Russia conflict, NFR is committed to utilize solar energy for meeting its energy requirements which will help in meeting power needs of all the stations and save precious expenditure for the Railways and the country apart from being environment friendly.



(Sabyasachi De)
CPRO/N.F.Railway




2
02308-02-2022
Maligaon
Another step towards strengthening rail connectivity in Northeast; Goods train started running in the newly commissioned Gauripur - Abhayapuri BG section

In another step towards providing better rail connectivity to N E Region, Alipurduar Division of N. F. Railway has started operation of goods train through the newly constructed New Coochbehar – Gauripur – Abhayapuri - Goalpara section, which is a part of the New Maynaguri – Jogighopa new line (226.83 km) project.

A rake carrying 2652 tonnes of milk products, pulses, salt and plastic goods loaded from Linch, Gujarat has been transported to Azara near Guwahati through this route. Again o­n 19th January, 2022 a cement loaded rake for Guwahati carrying 2,579 tonnes of cement has been transported through this new route.

CRS (Commissioner of Railway Safety) had earlier granted authorization for operations of trains through Bilasipara - Abhayapuri (47.65 kms) section with a maximum permissible speed of 90 kmph. By commissioning of section from Bilasipara to Abhayapuri, train services can now run from Gauripur to Abhayapuri covering Dhubri and Bongaigaon districts of Assam.

Newly commissioned Gauripur - Abhayapuri route will provide better connectivity and access to the people of this region in Northeast. Running of goods train in new BG section will also help in reducing congestion and faster movement of goods train in other congested section.



(Guneet Kaur)
CPRO / N.F. RAILWAY







COMMENTS

NO Comments. Be the first to Comment...

Add Comment






Submit


Latest Search