For a Proper experience on Trainspy.com, enable JavaScript in your browser

Search For Trains   

Bandarupalle

STATION INFO

Address: Bandarupalle, Guntur. Rly Enquiry: 0863-2119099 Andhra Pradesh

Station Code: BDPL)Bandarupall

Station Name: BDPL)Bandarupalle

Zone: SCoR/South Coast

Total Unique Trains: 6

Train Frequency Weekly: 37

Station Traffic: Low

ALL PASSING TRAINS
Print Table

To Check Ticket Availibility Click Classes
TrainTrain NameArrDepHaltDaysClasses
Arrival
77298MCLA BVRM DMU08:1508:161M,TU,W,TH,F,SA,SUUNRESERVED
57317GNT MCLA PASS08:2008:211M,TU,W,TH,F,SA,SUUNRESERVED
57652RAL SC PASS09:4909:501M,TU,W,TH,F,SA,SUUNRESERVED
57651SC RAL PASS16:2116:221M,TU,W,TH,F,SA,SUUNRESERVED
77297TEL MCLA DMU17:3217:331M,TU,W,TH,F,SA,SUUNRESERVED
57320MCLA GNT PASS18:5919:001M,TU,W,TH,F,SA,SUUNRESERVED
TrainTrain NameArrDepHaltDaysClasses
Departure



RECENT NEWS

1
   

SOUTH CENTRAL RAILWAY
PRESS RELEASE
PUBLIC RELATIONS OFFICE, SECUNDERABAD - 500 071
No.25/2023-2427-04-2023
Secunderabad
PR No. 25 - Restoration of Stoppages for Trains over Guntur Division

The stoppages for the following trains running through Guntur Division of SCR will be restored with effect from 24.04.2023as detailed below:-

 

Restoration of Stoppages:

 

Sl. No

Tr. No

From – To

Stations

1

07784

Guntur – Repalle

Zampani, Penumarru

2

07785

Repalle – Guntur

Zampani, Penumarru

3

07786

Guntur – Repalle

Zampani, Penumarru

4

07787

Repalle – Guntur

Zampani, Penumarru

5

07783

Vijayawada – Guntur

Pedakakani

6

07788

Guntur – Vijayawada

Pedakakani

7

07779

Guntur – Macherla

Nallapadu, Bandarupalle

8

07780

Macherla – Guntur

Nallapadu, Bandarupalle

9

07781

Vijayawada – Macherla

Pedakakani, Nallapadu, Tummalacheruvu

10

07782

Macherla – Vijayawada

Tummalacheruvu, Nallapadu, Pedakakani

11

07874

Tenali – Repalle

Zampani

12

07873

Repalle – Tenali

Zampani

13

07876

Tenali – Repalle

Zampani

14

07875

Repalle – Tenali

Zampani

15

07888

Tenali – Repalle

Penumarru

16

07889

Repalle – Markapur Rd

Pallikona, Chinnaravuru, Sangam Jagarlamudi

 



(Ch.Rakesh)
Chief Public Relations Officer




2
   

SOUTH CENTRAL RAILWAY
PRESS RELEASE
PUBLIC RELATIONS OFFICE, SECUNDERABAD - 500 071
No.626/2020-2104-03-2021
Secunderabad
Shri Gajanan Mallya, General Manager, SCR Conducts Annual Inspection of Guntur Division





-Annual inspection between Macherla - Mangalagiri section

Shri Gajanan Mallya, General Manager, South Central Railway undertook Annual Inspection of Macherla - Mangalagiri section of Guntur Division today i.e., 03rd March, 2021. He was accompanied by Shri R. Mohan Raja, Divisional Railway Manager, Guntur Division and other senior officials throughout the inspection.

The General Manager commenced the inspection at Macherla Railway Station and discussed o­n station developmental plans with the officials. He inspected track safety at curve, a minor bridge and Road Under Bridge (RUB) near Rentachintal. The General Manager conducted a thorough inspection between Macherla – Nadikude section where he inspected Level Crossing Gate No. 89 and interacted with the gatemen. He also inspected major bridges and Road Under Bridges (RUB) in this section.

At Nadikude Railway station, the General Manager inspected the passenger amenities, circulating area and discussed o­n station developmental plans with officials. He inaugurated the Hamalis room, Open air gym and Children’s park at Nadikude. The General Manager inspected the running room, Gang No. 2 and interacted with the gang men. He examined the facilities available at the Health Unit and planted saplings towards green environment. He visited the staff quarters where he interacted with the family members of the employees about the facilities provided. The General Manager inspected Road Under Bridge (RUB) between Nadikude and Tummalacheruvu section. He inspected Bellamkkonda Railway station and inaugurated the track-men tool cum rest room and also took part in tree plantation.

The General Manager inspected major bridge no. 48 and curve no. 11 o­n Dhulipallavagu between Reddigudem and Sattenapalle section. The General Manager inspected Sattenapalle Railway station, he examined the staff quarters, points & crossings and traction sub-station. He inaugurated an Open Gym and Children’s park at Sattenapalle. He inaugurated staff quarters of Piduguralla through video link. The General Manager carried out a speed test between Sattenapallle – Siripuram section. He inspected a Road Under Bridge (RUB) in Bandarupalle – Nallapadu section and carried out a speed test in Guntur – Mangalagiri section.



(Ch.Rakesh)
Chief Public Relations Officer







COMMENTS

NO Comments. Be the first to Comment...

Add Comment






Submit


Latest Search