For a Proper experience on Trainspy.com, enable JavaScript in your browser

Train Search








4 Trains from (pia)pipraigaon to (PFR)PACHOR ROAD


Address: Madhya Pradesh 473440, India

Station Code: PIA

Station Name: PIPRAIGAON

Zone: WCR/West Central

Train Frequency Weekly: 107

Station Traffic: Medium

Address: Pachore, Madhya Pradesh 465683, India

Station Code: PFR

Station Name: PACHOR ROAD

Zone: WCR/West Central

Train Frequency Weekly: 45

Station Traffic: Low





Trains
To Check Ticket Availibility Click Classes
TrainTrain NameFromDepToArrTimeDaysClassesStatus
14310UJJAIYANI EXPMNV02:05PFR05:543:49TU,W2A,3A,SL,GN,14310 Status
59342BINA NAD PASSPIA05:07UDK09:564:49M,TU,W,TH,F,SA,SUUNRESERVED59342 Status
19166SABARMATI EXPPIA10:15PFR14:384:23M,W,SA2A,3A,SL,GN,19166 Status
19168SABARMATI EXPPIA10:15PFR14:384:23TU,TH,F,SU2A,3A,SL,GN,19168 Status
Train Type Train Table Info
SuperFast
Click On Function
Headers Sort-
Background Colour Code
Train No Detail Information About Train on new tab
Train Name Route Time Table & Fare of Train 
From & To Detail Information About Station on new tab
Classes Ticket Availibility
Mail/Express
Rajdhani
Shatabdi
Janshatabdi
Garibrath/Yuva
Duronto
Spl Tourism Trains






RECENT NEWS

1
2023/05/2525-05-2023
Annual Conference of Operations department of Central Railway conducted today 24/05/23



Annual Conference of Operations department of Central Railway conducted today 24/05/23

Shri Naresh Lalwani, General Manager, Central Railway addressed the Senior Divisional Operations Manager’s Annual Conference at Mumbai HQ o­n 24.5.2023.

Shri Alok Singh, Additional General Manager and Shri Mukul Jain, Principal Chief Operations Manager, Central Railway were also present. The conference was attended by Heads of Coaching section, Planning section and Goods section of Operations Department of Central Railway and Operations Department Heads of Mumbai, Bhusawal, Nagpur, Pune and Solapur Divisions.

The targets and achievements of upcoming year 2023-24 have been discussed in conference as follows-

1) Goods loading-

In year 2021-22- 76.16 million tonne (MT) goods loading achieved by CR.

In year 2022-23- 81.88 million tonne goods loading achieved by CR.

In year 2023-24- 90.05 million tonne target of goods loading has been set by CR.

2) Coal loading -

Out of above total loading, coal is highest commodity loading.

In 2021-22- 39.52 MT loading done.

In 22-23- 37.17 MT loading done.

In 23-24- target of 40.95 MT coal loading has been set.

3) Cement loading-

In 22-23- 7.48 MT loading achieved.

In 23-24- target of 8.8 MT is set.

Major plants of Cement loading are- ACC/Wadi/Solapur, ACC/Ghuggus/Nagpur, Ultratech cement/Hotgi/Solapur, Orient cement/Bhadli/Bhusawal.

4) New infrastructures lines completed-

-Bhusawal-Jalgaon new 3rd line & 4th line of 24.13 km completed in year 2022-23.

-Jalgaon-Pachora new 3rd line of 47.59 km completed in year 2022-23.

5) New infrastructure lines under progress-

-Nagpur-Wardha 3rd& 4th line

-Bhusawal-khandwa 3rd & 4th line

-3rd line in Nagpur-Etarasi, Bhusawal-Wardha, Jalgaon-Manmad.

6) Parcel loading hubs-

Bhiwandi, Jalgaon, Ajni/Nagpur have been developed as major parcel loading points.

In 2022-23- 312 parcel train loaded with 764759 tonnage and 45.86 Crores revenue earning.

7) Improvement of goods sheds under progress-

It will be completed in this 2023-24 year. Circulating area, lighting, approach road, labour room, merchant room etc will be renewed.

-Mumbai division- Kalamboli

-Bhusawal division- Kasbe Sukane, Borgaon, Khamgaon, Savda, Burhanpur, Nandgaon

-Nagpur- Tadali, Ballarshah, Kalmeshwar, maramjhiri.

-Pune- Nira, Loni,

-Solapur- Vilad, Ahmednagar, Belapur, Daund, Arag.

8) Daily goods train interchange-

In 2021-22- 317 goods trains taken over/handed over daily by CR with other railway zones.

In 22-23- 336 goods train interchange daily by CR. It's 18.4% increase capacity handling.

9) Infrastructural works completed to increase mail express and goods train mobility-

-Electrification completed at Roha yard, Gurumarket yard/Pune div, Solapur yard, Barshi yard/Solapur yard, Bale yard/solapur div.

-OHE Overhead wire new substations completed at- Karad/Pune div, Ausa/Solapur div, Gaudgaon/Solapur div, Nagothane/Mumbai div.

10) Critical bottleneck infrastructure works completed in year 2022-23-

-Daund- Gulbarga doubling

-Wardha- Chitoda 2nd cord line

-Khapri-Nagpur-Godhani- 20 km automatic signalling system.

-Kamshet/pune div- loop lines extention.

--- --- ---

Date: May 24, 2023

PR No.2023/05/25

This press release is issued by the Public Relations Department, Central Railway, Chhatrapati Shivaji Maharaj Terminus Mumbai.



(Shivraj Manaspure)
Chief Public Relations Officer




2
WR Press Release No. 2023/03 24-03-2023
MUMBAI
EXPERIMENTAL STOPPAGES OF SOME WR TRAINS AT VARIOUS STATIONS EXTENDED

EXPERIMENTAL STOPPAGES OF SOME WR TRAINS AT VARIOUS STATIONS EXTENDED

For the convenience of passengers, additional stoppage had been provided to various Western Railway trains at several stations for a period of six months. These additional halts have further been extended o­n existing timings for a further period of six months.

According to a press release issued by Shri Sumit Thakur, Chief Public Relations Officer of Western Railway, details of the train is as under:

 

1.Stoppage for Train No. 12955/12956 Mumbai Central – Jaipur Express at Suwasra stationwhich was earlier notified up to 5th April, 2023 has now been extended up to 2nd October, 2023.

 

2.Stoppage for Train No. 22975/22976 Bandra Terminus – Ramnagar Express at Shamgarh station which was earlier notified up to 10th April, 2023 has now been extended up to 7th October, 2023.

 

3.Stoppage for Train No. 19037/19038 Bandra Terminus – Barauni Avadh Express at Suwasra station which was earlier notified up to 4thApril, 2023 has now been extended up to 1st October, 2023.

 

4.Stoppage for Train No. 19167 Ahmedabad – Varanasi Sabarmati Express at Pipraigaon station which was earlier notified up to 21st March, 2023 has now been extended up to 17th September, 2023.

 

5.Stoppage for Train No. 19168 Varanasi - Ahmedabad Sabarmati Express at Pipraigaon station which was earlier notified up to 20th March, 2023 has now been extended up to 16th September, 2023.

 

6.Stoppage for Train No. 11125 Ratlam - Gwalior Express at Miyana station which was earlier notified up to 22nd March, 2023 has now been extended up to 18th September, 2023.

 

7.Stoppage for Train No. 11126 Gwalior - Ratlam Express at Miyana station which was earlier notified up to 23rd March, 2023 has now been extended up to 19th September, 2023.

 

8.Stoppage for Train No. 21125 Ratlam – Bhind Express at Miyana station which was earlier notified up to 22nd March, 2023 has now been extended up to 18th September, 2023.

 

9.Stoppage for Train No. 21126 Bhind - Ratlam Express at Miyana station which was earlier notified up to 23rd March, 2023 has now been extended up to 19th September, 2023.

 

10.Stoppage for Train No. 11125 Ratlam - Gwalior Express at Badarwas station which was earlier notified up to 23rd March, 2023 has now been extended up to 19th September, 2023.

 

11.        Stoppage for Train No. 11126 Gwalior - Ratlam Express at Badarwas station which was earlier notified up to 24th March, 2023 has now been extended up to 20th September, 2023.

 

12.     Stoppage for Train No. 19307 Indore – Chandigarh Express at Badarwasstation which was earlier notified up to 30th March, 2023 has now been extended up to 26th September, 2023.

 

13.    Stoppage for Train No. 19308 Chandigarh - Indore Express at Badarwasstation which was earlier notified up to 31st March, 2023 has now been extended up to 27th September, 2023.

 

14.Stoppage for Train No. 12465/12466 Indore – Jodhpur Ranthambore Express at Suwasra station which was earlier notified up to 5thApril, 2023 has now been extended up to 2nd October, 2023.

 

For detailed information regarding halts, timings of halts, passengers may please visit  www.enquiry.indianrail.gov.in.

 

************

 






COMMENTS

NO Comments. Be the first to Comment...

Add Comment