For a Proper experience on Trainspy.com, enable JavaScript in your browser

Train Search








1 Trains from (msmd)mahasamund to (KRPU)KORAPUT


Address: Mahasamund Railway Station, Mahasamund, Chhattisgarh 493445, India

Station Code: MSMD

Station Name: MAHASAMUND

Zone: ECoR/East Coast

Train Frequency Weekly: 107

Station Traffic: Medium

Address: Jeypore-Vizianagaram Road, Odisha 764021, India

Station Code: KRPU

Station Name: KORAPUT

Zone: ECoR/East Coast

Train Frequency Weekly: 91

Station Traffic: Medium





Trains
To Check Ticket Availibility Click Classes
TrainTrain NameFromDepToArrTimeDaysClassesStatus
18211DURG JDB EXPMSMD14:52KRPU00:109:18TU,TH,SUSL,GN,18211 Status
Train Type Train Table Info
SuperFast
Click On Function
Headers Sort-
Background Colour Code
Train No Detail Information About Train on new tab
Train Name Route Time Table & Fare of Train 
From & To Detail Information About Station on new tab
Classes Ticket Availibility
Mail/Express
Rajdhani
Shatabdi
Janshatabdi
Garibrath/Yuva
Duronto
Spl Tourism Trains






RECENT NEWS

1
0230-05-2023
KOTTAVALASA-KORAPUT-KIRANDUL (KK) LINE DOUBLING PROJECT: Construction for 58% of total stretch completed.

KOTTAVALASA-KORAPUT-KIRANDUL (KK) LINEDOUBLING PROJECT:

 

●Construction for 58% of total stretch completed.

 

●Shrungavarapukota & Boddavara Section, a distance of 7.3 KMs with 1 in 60 Steep Gradient in the Eastern Ghat commissioned.

 

●259.5 Kms crucial Doubling Work of the project completed out of 445.5 Kms long important Iron Ore Route.


The construction work for crucial Doubling work of Kottavalasa-Koraput-Kirandul (KK) line under Waltair Division of East Coast Railway is going o­n full swing. More than 58/% of construction works of this project have been completed, till now.
 
A patch of 7.3Kms between Shrungavarapukota & Boddavara Stations has been completed and commissioned yesterday for both Goods and Passenger Traffic.
 
This has been possible due to consistent review of project works by Hon’ble Minister of Railways Shri Ashwini Vaishnaw Ji. General Manager Shri Manoj Sharma advised concerned officials to focus for the speedy completion of various project works for the critical projects. Shri Sharma also advised officials to coordinate with stake holders including State Government officials for early completion of the projects.     
 
Hon’ble Minister of Railways Shri Ashwini Vaishnaw is giving priority for the Development of Railway infrastructure of the remote Tribal region along with various project works going in the remote Tribal Region of Northern AP, Odisha & Chhattisgarh and also is monitoring the developmental works regularly. Doubling Work in KK line will boost to the economy of the region and will provide a hassle free train operations in the crucial Eastern Ghat region.  
 
Doubling Work in KK Line (445.5 Kms) project was included in 2011-12 and the final Sanction was given in2015-16. Works between Shrungavarapukota & Boddavara
Stations, a stretch of 7.3KMs was completed and commissioned yesterday with 1 in 60 Steep gradient in the Eastern Ghats. This is a crucial tough Block Section in the important iron ore route. With this, a total of 259.5 Kms doubling work of KK Line is commissioned so far in phased manner which is 58% of total length of the project. Two more Block Sections in either side of Araku have been targeted to be completed in next two months.





2
0123-03-2023
Bhubaneswar
RAILWAY DOUBLING WORK IN KOTTAVALASA-KORAPUT-KIRANDUL (KK) LINE REACHES ANOTHER MILESTONE



●237 KMs doubling work has been commissioned so far, out of 445 KMs. 

●Chatriput-Maligura (6.95KMs) section inspected by CRS today and authorisation given for train movement.

Doubling work is currently underway in the Kottavalasa-Koraput-Kirandul (KK) Rail Line. 237 kilometers out of a total 445 kilometers of doubling work has been commissioned so far. This important mineral transportation route has been facing delays in train movements due to traffic problems in single-line railway sections. o­nce the doubling works are completed, train traffic will be easier and hassle-free.

Today, the 6.95 kilometer-long Broad Gauge Railway Line Section between Chatriput and Maligura Stations in Koraput District of Odisha, under the Waltair Railway Division of the East Coast Railway, received authorization for the operation of train movement. Commissioner Railway Safety (CRS)/South Eastern (SE) Circle Shri A. M. Chowdhary inspected this Railway Section and gave his consent for train operations. General Manager Shri Manoj Sharma congratulated the team engaged in the construction of this project.

The KK line is located in remote tribal areas of three states and is a point of focus of Hon'ble Railway Minister Shri Ashwini Vaishnaw Ji for the development of the region through the railway network. The Ministry of Railways has sanctioned rupees 248.75 crores for the Jagadalpur-Koraput critical doubling project this year, while rupees 70 crores will be spent o­n doubling works between Chatriput and Jeypore in the 2022-23 FY. Rupees 170 Crores has also been sanctioned for this project in 2023-24 FY. 

The proposed rail network will improve connectivity in the region and drastically develop it. The ECoR Chief Administrative Officer (Construction) Shri Amar Prakash Dwivedi, Divisional Railway Manager of Waltair Railway Division Shri Anup Satpathy and senior officials from ECoR HQs and Waltair Division assisted the CRS during his inspection.





COMMENTS

NO Comments. Be the first to Comment...

Add Comment






Submit