For a Proper experience on Trainspy.com, enable JavaScript in your browser

Train Search








11 Trains from (kan)khana jn to (bkp)bakhtiyarpur jn


Address: Khana Junction, West Bengal 713141, India

Station Code: KAN

Station Name: KHANA JN

Zone: ER/Eastern

Train Frequency Weekly: 299

Station Traffic: High

Address: Bakhtiyarpur Junction, Bakhtiyarpur, Bihar 803212, India

Station Code: BKP

Station Name: BAKHTIYARPUR JN

Zone: ECR/East Central

Train Frequency Weekly: 526

Station Traffic: High





Trains
To Check Ticket Availibility Click Classes
TrainTrain NameFromDepToArrTimeDaysClassesStatus
53520GRD LINK PAS EXBWN04:50BKP06:491:59M,TU,W,TH,F,SA,SU3A,SL,GN,53520 Status
12303POORVA EXPRESSBWN09:10BKP15:055:55M,TU,F,SA1A,2A,3A,SL,GN,12303 Status
13007U ABHATOOFAN EXPBWN11:40BKP19:307:50M,TU,W,TH,F,SA,SU3A,SL,GN,13007 Status
53043HWH RGD PASSGKH14:13BKP07:0516:52M,TU,W,TH,F,SA,SUUNRESERVED53043 Status
13049AMRITSAR EXPBWN16:09BKP00:478:38M,TU,W,TH,F,SA,SU3A,SL,GN,13049 Status
13005AMRITSAR MAILBWN20:23BKP02:336:10M,TU,W,TH,F,SA,SU1A,2A,3A,SL,GN,13005 Status
12333VIBHUTI EXPRESSBWN21:13BKP03:055:52M,TU,W,TH,F,SA,SU2A,3A,SL,GN,12333 Status
12351HWH-RJPB EXPRESBWN21:48BKP04:456:57M,TU,W,TH,F,SA,SU1A,2A,3A,SL,GN,12351 Status
13131KOAA PNBE EXPBWN22:11BKP07:359:24M,TU,W,TH,F,SA,SU3A,SL,GN,13131 Status
13119SDAH ANVT EXPGKH23:36BKP12:4013:04TH,SU3A,SL,GN,13119 Status
13133SDAH BSB EXPGKH23:38BKP12:4013:02M,TU,W,F,SA3A,SL,GN,13133 Status
Train Type Train Table Info
SuperFast
Click On Function
Headers Sort-
Background Colour Code
Train No Detail Information About Train on new tab
Train Name Route Time Table & Fare of Train 
From & To Detail Information About Station on new tab
Classes Ticket Availibility
Mail/Express
Rajdhani
Shatabdi
Janshatabdi
Garibrath/Yuva
Duronto
Spl Tourism Trains






RECENT NEWS

1
25-05-2023
Press Release: GENERAL MANAGER/EASTERN RAILWAY INSPECTED KHANA –PANDABESWAR SECTION OVER ASANSOL DIVISION


GENERAL MANAGER/EASTERN RAILWAY INSPECTED KHANA –PANDABESWAR SECTION OVER ASANSOL DIVISION



Asansol, May 24, 2023:


Shri Amar Prakash Dwivedi, General Manager, Eastern Railway visited Asansol Division o­n 24.05.2023. Shri Dwivedi conducted window trailing inspection between Khana-Pandabeswar section along with nominated Principal Head of the Department from Headquarters and Shri Permanand Sharma, Divisional Railway Manager, Asansol to see the safety measure of track, OHE, Signal, etc.

Shri Dwivedi, also visited Jhanjhra colliery siding and met with officials of Eastern Coalfield Ltd and RITES and also visited SonepurBazari Colliery sidings to see the project works under Gatishakti Cargo Terminal scheme to improve the loading of Asansol Division.

One Performance Review Meeting with all Branch Officers of Asansol Division was held at the Divisional Office, Asansol where the Division presented performance of previous year and discussed how to achieve the target fixed for 2023-24.




2
   

SOUTH CENTRAL RAILWAY
PRESS RELEASE
PUBLIC RELATIONS OFFICE, SECUNDERABAD - 500 071
No.49/2023-2408-05-2023
Secunderabad
PR No. 49 SCR completes Record Electrification of 1,017 Route kms in 2022-23 South Central Railway Observes Electrical Safety Week

 

-Electrification done during 2022-23 is the best-ever achievement since inception of the Zone.

-The Zone is observing Electrical safety week during 03 - 09 May 2023.

South Central Railway is observing Electrical Safety Week from 03rdto 09th May, 2023 to promote electrical safety aspects and saving of electrical energy. During the safety week, seminars o­n electrical safety will be held at the divisional level and various other establishments. Special training classes are also being conducted for the electrical supervisors and staff o­n increasing awareness regarding electricity rules. Inspection of Fire audit, functioning of fire detection and fire-fighting equipment will be carried out. Posters and banners are also displayed to bring awareness o­n electrical safety.

       SCR completes Record Electrification

South Central Railway has registered its best-ever performance in electrification of its network during 2022-23. The Zone has completed 1,017 Route Kilometers (RKM) of Railway electrification works in FY 2022-23, which is an all-time record in the history of the Zone. The achievement is also the second highest RKM of Electrification done by any Zone across Indian Railways during 2022-23.

Indian Railways has accorded special focus to electrification of its network. Out of the total electrification of 1017 Rkms, 286.4 Kms fall under Telangana, 133.7 Rkms fall under Andhra Pradesh, 546 Rkms falls under Maharashtra and 50.8 Rkms pertains to Karnataka jurisdiction of SCR. The state-wise details of the Electrification completed o­n the Zone during 2022-23 are as follows:

·286.4 Rkms pertaining to Telangana region of SCR comprises of sections like Bhavanapalem – Sattupalli; Manoharabad – Nizamabad; Mahabubnagar - Alampur Road; Kosai – Ambari; Jankampet - Basar.

 

·133.7 Rkms pertaining to Andhra Pradesh region of SCR comprises of sections like Dharmavaram – Kadiri; Aravalli – Nidadavolu; New Piduguralla – Savalyapuram; Alampur - Kurnool City; Gooty Bypass cabin.

 

·546 Rkms pertaining to Maharashtra region of SCR comprise of sections like Washim – Purna; Kamalnagar – Parli; Ambari – Mudkhed; Rotegaon – Dinegaon; Parli - Parbhani.


·50.8 Rkms pertaining to Karnataka region of SCR between Khanapur - Kamalnagar.

 

Electrification of railway lines o­n such huge magnitude has also led to availability of continuous electrified rail connectivity between Secunderabad / Hyderabad to Bengaluru as well Chennai, operation of first electrified train in sections like Bhadrachalam – Sattupalli in Telangana, Dharmavaram – Pakala in Andhra Pradesh and Aurangabad to Dinagaon in Maharashtra among others

 

The electrification of rail lines helps in providing seamless movement of trains by avoiding change in traction power and reducing enroute detention of both the coaching and freight trains. It helps in improving the average speed of the trains and hence more trains can be introduced in these sections due to the enhancement of sectional capacity. It also provides an environment-friendly means of powering the trains with zero carbon emissions, while saving fuel costs at the same time.

Shri Arun Kumar Jain, General Manager, South Central Railway congratulated staff & officers of the Zone for the excellent teamwork and dedication in executing the electrification works. The General Manager stated that the pace with which the electrification works have been carried out has not o­nly helped in achieving record electrification but has also earned recognition at the National level. He said that the major portion of the SCR network is now electrified and the Zone is progressing swiftly towards achieving 100% electrification of its existing broad gauge lines over its jurisdiction.  


(Ch.Rakesh)
Chief Public Relations Officer





COMMENTS

NO Comments. Be the first to Comment...

Add Comment






Submit