For a Proper experience on Trainspy.com, enable JavaScript in your browser

Train Search








1 Trains from (bau)burhanpur to (fzr)firozpur cant


Address: Lalbagh, Burhanpur, Madhya Pradesh 450331, India

Station Code: BAU

Station Name: BURHANPUR

Zone: CR/Central

Train Frequency Weekly: 236

Station Traffic: High

Address: Ferozepur Cantonment Railway Station, Ferozepur, Punjab, India

Station Code: FZR

Station Name: FIROZPUR CANT

Zone: NR/Northern

Train Frequency Weekly: 371

Station Traffic: High





Trains
To Check Ticket Availibility Click Classes
TrainTrain NameFromDepToArrTimeDaysClassesStatus
12137PUNJAB MAILBAU03:30FZR05:5026:20M,TU,W,TH,F,SA,SU1A,2A,3A,SL,GN,12137 Status
Train Type Train Table Info
SuperFast
Click On Function
Headers Sort-
Background Colour Code
Train No Detail Information About Train on new tab
Train Name Route Time Table & Fare of Train 
From & To Detail Information About Station on new tab
Classes Ticket Availibility
Mail/Express
Rajdhani
Shatabdi
Janshatabdi
Garibrath/Yuva
Duronto
Spl Tourism Trains






RECENT NEWS

1
2023/05/2525-05-2023
Annual Conference of Operations department of Central Railway conducted today 24/05/23



Annual Conference of Operations department of Central Railway conducted today 24/05/23

Shri Naresh Lalwani, General Manager, Central Railway addressed the Senior Divisional Operations Manager’s Annual Conference at Mumbai HQ o­n 24.5.2023.

Shri Alok Singh, Additional General Manager and Shri Mukul Jain, Principal Chief Operations Manager, Central Railway were also present. The conference was attended by Heads of Coaching section, Planning section and Goods section of Operations Department of Central Railway and Operations Department Heads of Mumbai, Bhusawal, Nagpur, Pune and Solapur Divisions.

The targets and achievements of upcoming year 2023-24 have been discussed in conference as follows-

1) Goods loading-

In year 2021-22- 76.16 million tonne (MT) goods loading achieved by CR.

In year 2022-23- 81.88 million tonne goods loading achieved by CR.

In year 2023-24- 90.05 million tonne target of goods loading has been set by CR.

2) Coal loading -

Out of above total loading, coal is highest commodity loading.

In 2021-22- 39.52 MT loading done.

In 22-23- 37.17 MT loading done.

In 23-24- target of 40.95 MT coal loading has been set.

3) Cement loading-

In 22-23- 7.48 MT loading achieved.

In 23-24- target of 8.8 MT is set.

Major plants of Cement loading are- ACC/Wadi/Solapur, ACC/Ghuggus/Nagpur, Ultratech cement/Hotgi/Solapur, Orient cement/Bhadli/Bhusawal.

4) New infrastructures lines completed-

-Bhusawal-Jalgaon new 3rd line & 4th line of 24.13 km completed in year 2022-23.

-Jalgaon-Pachora new 3rd line of 47.59 km completed in year 2022-23.

5) New infrastructure lines under progress-

-Nagpur-Wardha 3rd& 4th line

-Bhusawal-khandwa 3rd & 4th line

-3rd line in Nagpur-Etarasi, Bhusawal-Wardha, Jalgaon-Manmad.

6) Parcel loading hubs-

Bhiwandi, Jalgaon, Ajni/Nagpur have been developed as major parcel loading points.

In 2022-23- 312 parcel train loaded with 764759 tonnage and 45.86 Crores revenue earning.

7) Improvement of goods sheds under progress-

It will be completed in this 2023-24 year. Circulating area, lighting, approach road, labour room, merchant room etc will be renewed.

-Mumbai division- Kalamboli

-Bhusawal division- Kasbe Sukane, Borgaon, Khamgaon, Savda, Burhanpur, Nandgaon

-Nagpur- Tadali, Ballarshah, Kalmeshwar, maramjhiri.

-Pune- Nira, Loni,

-Solapur- Vilad, Ahmednagar, Belapur, Daund, Arag.

8) Daily goods train interchange-

In 2021-22- 317 goods trains taken over/handed over daily by CR with other railway zones.

In 22-23- 336 goods train interchange daily by CR. It's 18.4% increase capacity handling.

9) Infrastructural works completed to increase mail express and goods train mobility-

-Electrification completed at Roha yard, Gurumarket yard/Pune div, Solapur yard, Barshi yard/Solapur yard, Bale yard/solapur div.

-OHE Overhead wire new substations completed at- Karad/Pune div, Ausa/Solapur div, Gaudgaon/Solapur div, Nagothane/Mumbai div.

10) Critical bottleneck infrastructure works completed in year 2022-23-

-Daund- Gulbarga doubling

-Wardha- Chitoda 2nd cord line

-Khapri-Nagpur-Godhani- 20 km automatic signalling system.

-Kamshet/pune div- loop lines extention.

--- --- ---

Date: May 24, 2023

PR No.2023/05/25

This press release is issued by the Public Relations Department, Central Railway, Chhatrapati Shivaji Maharaj Terminus Mumbai.



(Shivraj Manaspure)
Chief Public Relations Officer




2
29-04-2023
Temporary Cancellation/ Regulation/ Rescheduling of trains due to Traffic Block on Dankaur- Chipiana and Delhi Sarai Rohilla-Rewari Section

NEW DELHI
DATE 28.04.2023
Temporary Cancellation/ Regulation/ Rescheduling  of  trains due to Traffic Block o­n 
Dankaur- Chipiana  and Delhi Sarai Rohilla-Rewari Section 
It is notified for the information of the general public that due to Traffic Block o­n Dankaur- Chipiana and Delhi Sarai Rohilla-Rewari Section in connection with various  works, the following train shall be temporarily cancelled/regulated/rescheduled as under:-

Cancellation of trains:- 
04288/87 Delhi-Ailgarh Jn-Delhi Special JCO 01, 02 and 04 05.2023.
04907/04934 Dankaur-Shakur Basti- Dankaur special JCO 01.05.2023 to 06.05.2023.

Regulation of trains :-
12873 Ranchi –Anand Viahr T JCO 02 & 04.05.2023 will be regulated for 70 minutes in NCR.
14037 Silchar-New Delhi JCO 01.05.2023 will be regulated for 90 minutes in NCR.
14619 Agartala-Firozpur Cantt JCO 04.05.2023 will be regulated for 180” in NCR.
12817 Hatie-Anand Vihar T JCO 05.05.2023 will be regulated for 170 minutes in NCR.
12419 Lucknow-New Delhi  JCO 06.05.2023 will be regulated for 120 minutes in NCR.
12323 Howrah-Jaisalmer JCO 05.05.2023 will be regulated for 100 minutes in NCR.
12561 JayNagar-Newm Delhi JCO 05.05.2023 will be regulated for 60 minutes in NCR.
12420 New delhi –Lucknow JCO 03.05.2023 & 05.05.2023 will be regulated for 50 minutes at Ghaziabad.
22466 Anand Viahr T -Madanupur JCO 03.05.2023 will be regulated for 30 minutes at Shakur Basti.
12398 New Delhi -Gaya JCO 03 & 05.05.2023 will be regulated for 25 minutes at Ghaziabad.
12566 New Delhi -Darbhanga JCO 03 & 05.05.2023 will be regulated for 20 minutes at Shakur Basti.
12368 Anand Viahr T -Bhagalpur JCO 03 & 05.05.2023 will be regulated for 15 minutes  at Shakur Basti
02570 New Delhi -Darbhanga  Special JCO 04.05.2023 will be regulated for 20 minutes at Ghaziabad.
04184 Delhi-Tundal JCO 06.05.2023 will be regulated for 70” between Delhi- Ghaziabad.
Rescheduling of trains :-
02570 New Delhi -Darbhanga  Special JCO 03 & 05.05.2023 will be rescheduled for 13.45 New Delhi(i.e.90” late).
12274 New Dlhi-Howrah JCO 06.05.2023 will be rescheduled for 14.35 ex NDLS (i.e. 115” late).
12398 New Delhi-Gaya JCO 06.05.2023 will be rescheduled for 14.55 ex NDLS (i.e. 125” late).
12566 New Delhi - Darbhanga JCO 06.05.2023 will be rescheduled for 15.05 ex NDLS (i.e. 125” late).
12368 Aanad Viahr T-Bhagalpur JCO 06.05.2023 will be rescheduled for 15.00 ex NDLS (i.e.105” late).
--------






COMMENTS

NO Comments. Be the first to Comment...

Add Comment






Submit