For a Proper experience on Trainspy.com, enable JavaScript in your browser

Train Search








1 Trains from (arj)aunrihar jn to (PC)PACHORA JN


Address: Aunrihar Junction Railway Station, Uttar Pradesh 233221, India

Station Code: ARJ

Station Name: AUNRIHAR JN

Zone: NER/North Eastern

Train Frequency Weekly: 341

Station Traffic: High

Address: Pachora, Maharashtra 424201, India

Station Code: PC

Station Name: PACHORA JN

Zone: CR/Central

Train Frequency Weekly: 178

Station Traffic: High





Trains
To Check Ticket Availibility Click Classes
TrainTrain NameFromDepToArrTimeDaysClassesStatus
15018GKP LTT EXPARJ09:57PC11:1825:21M,TU,W,TH,F,SA,SU2A,3A,SL,GN,15018 Status
Train Type Train Table Info
SuperFast
Click On Function
Headers Sort-
Background Colour Code
Train No Detail Information About Train on new tab
Train Name Route Time Table & Fare of Train 
From & To Detail Information About Station on new tab
Classes Ticket Availibility
Mail/Express
Rajdhani
Shatabdi
Janshatabdi
Garibrath/Yuva
Duronto
Spl Tourism Trains






RECENT NEWS

1
2023/05/2525-05-2023
Annual Conference of Operations department of Central Railway conducted today 24/05/23



Annual Conference of Operations department of Central Railway conducted today 24/05/23

Shri Naresh Lalwani, General Manager, Central Railway addressed the Senior Divisional Operations Manager’s Annual Conference at Mumbai HQ o­n 24.5.2023.

Shri Alok Singh, Additional General Manager and Shri Mukul Jain, Principal Chief Operations Manager, Central Railway were also present. The conference was attended by Heads of Coaching section, Planning section and Goods section of Operations Department of Central Railway and Operations Department Heads of Mumbai, Bhusawal, Nagpur, Pune and Solapur Divisions.

The targets and achievements of upcoming year 2023-24 have been discussed in conference as follows-

1) Goods loading-

In year 2021-22- 76.16 million tonne (MT) goods loading achieved by CR.

In year 2022-23- 81.88 million tonne goods loading achieved by CR.

In year 2023-24- 90.05 million tonne target of goods loading has been set by CR.

2) Coal loading -

Out of above total loading, coal is highest commodity loading.

In 2021-22- 39.52 MT loading done.

In 22-23- 37.17 MT loading done.

In 23-24- target of 40.95 MT coal loading has been set.

3) Cement loading-

In 22-23- 7.48 MT loading achieved.

In 23-24- target of 8.8 MT is set.

Major plants of Cement loading are- ACC/Wadi/Solapur, ACC/Ghuggus/Nagpur, Ultratech cement/Hotgi/Solapur, Orient cement/Bhadli/Bhusawal.

4) New infrastructures lines completed-

-Bhusawal-Jalgaon new 3rd line & 4th line of 24.13 km completed in year 2022-23.

-Jalgaon-Pachora new 3rd line of 47.59 km completed in year 2022-23.

5) New infrastructure lines under progress-

-Nagpur-Wardha 3rd& 4th line

-Bhusawal-khandwa 3rd & 4th line

-3rd line in Nagpur-Etarasi, Bhusawal-Wardha, Jalgaon-Manmad.

6) Parcel loading hubs-

Bhiwandi, Jalgaon, Ajni/Nagpur have been developed as major parcel loading points.

In 2022-23- 312 parcel train loaded with 764759 tonnage and 45.86 Crores revenue earning.

7) Improvement of goods sheds under progress-

It will be completed in this 2023-24 year. Circulating area, lighting, approach road, labour room, merchant room etc will be renewed.

-Mumbai division- Kalamboli

-Bhusawal division- Kasbe Sukane, Borgaon, Khamgaon, Savda, Burhanpur, Nandgaon

-Nagpur- Tadali, Ballarshah, Kalmeshwar, maramjhiri.

-Pune- Nira, Loni,

-Solapur- Vilad, Ahmednagar, Belapur, Daund, Arag.

8) Daily goods train interchange-

In 2021-22- 317 goods trains taken over/handed over daily by CR with other railway zones.

In 22-23- 336 goods train interchange daily by CR. It's 18.4% increase capacity handling.

9) Infrastructural works completed to increase mail express and goods train mobility-

-Electrification completed at Roha yard, Gurumarket yard/Pune div, Solapur yard, Barshi yard/Solapur yard, Bale yard/solapur div.

-OHE Overhead wire new substations completed at- Karad/Pune div, Ausa/Solapur div, Gaudgaon/Solapur div, Nagothane/Mumbai div.

10) Critical bottleneck infrastructure works completed in year 2022-23-

-Daund- Gulbarga doubling

-Wardha- Chitoda 2nd cord line

-Khapri-Nagpur-Godhani- 20 km automatic signalling system.

-Kamshet/pune div- loop lines extention.

--- --- ---

Date: May 24, 2023

PR No.2023/05/25

This press release is issued by the Public Relations Department, Central Railway, Chhatrapati Shivaji Maharaj Terminus Mumbai.



(Shivraj Manaspure)
Chief Public Relations Officer




2
17-03-2023
Diversion of trains due to non –interlocking work on Lucknow Division

New Delhi

Date 17.03.2023

 

Diversion of trains due to non –interlocking work o­n Lucknow Division

It is notified for the information of the general public that due to non-interlocking work in connection with doubling work of Goshaiganj -Ulnabhari -Bilharghat -Darshan Nagar o­n Barabanki-Ayodhya Cantt-Akbarpur-Zafrabad section over LKO Division from 19.03.2023 to 26.03.2023, the following trains shall remain temporarily diverted as under :  

 

Sr.

Train

Train Name

Diverted via

JCO EFFECTIVE FROM

1

13009

HOWRAH- YOGNAGRI RISHIKESH

via VARANASI-PRATAPGARH-LUCKNOW

18/03/23 to 25/03/23

2

13010

YOGNAGRI RISHIKESH -HOWRAH

via LUCKNOW-PRATAPGARH-VARANASI

18/03/23 to 25/03/23

3

13307

DHANBAD-FEROZPUR

via VARANASI-PRATAPGARH-LUCKNOW

18/03/23 to 25/03/23

4

13308

FEROZPUR-DHANBAD

via LUCKNOW-PRATAPGARH-VARANASI

18/03/23 to 25/03/23

5

18103

TATA-AMRITSAR

via VARANASI-PRATAPGARH-LUCKNOW

20/03/23, 22/03/23

6

18104

AMRITSAR-TATA

via LUCKNOW-PRATAPGARH-VARANASI

22/03/23, 24/03/23

7

15636

GUWAHATI-OKHA

via VARANASI-PRATAPGARH-LUCKNOW

20-03-2023

8

15635

OKHA-GUWAHATI

via LUCKNOW-PRATAPGARH-VARANASI

24-03-2023

9

15668

KAMAKHYA-GANDHIDHAM

via VARANASI-PRATAPGARH-LUCKNOW

22-03-2023

10

15667

GANDHIDHAM-KAMAKHYA

via LUCKNOW-PRATAPGARH-VARANASI

18-03-2023

11

14017

RAXUAL-ANAND VIHAR T.

via VARANASI-SULTANPUR-LUCKNOW

23-03-2023

12

14018

ANAND VIHAR T.-RAXUAL

via LUCKNOW-SULTANPUR-VARANASI

22-03-2023

13

22103

LOKMANYA TILAKT.-AYODHYA CANTT

via PFM-PRATAPGARH-SULTANPUR-AYODHYA CANTT

20-03-2023

14

13238

KOTA - PATNA

via LUCKNOW-SULTANPUR-ZAFRABAD

19/03/23, 23/03/23, 24/03/23

15

15934

AMRITSAR-NEW TINSUKIA

via LUCKNOW-SULTANPUR-ZAFRABAD

24-03-2023

16

19321

INDORE - PATNA

via LUCKNOW-SULTANPUR-ZAFRABAD

18/03/23, 25/03/23

17

13483

MLDT -DELHI

via ZAFRABAD-SULTANPUR-LUCKNOW

19/03/23, 21/03/23, 22/03/23, 24/03/23

18

13484

DELHI-MALDA TOWN

via LUCKNOW-SULTANPUR-ZAFRABAD

19/03/23, 21/03/23, 23/03/23, 24/03/23

19

13509

ASN-GONDA

via CHHAPRA-BHATANI-GORAKHPUR-GONDA

21-03-2023

20

13510

GONDA-ASANSOL

via GONDA-GORAKHPUR-BHATANI-MAU

22-03-2023

21

15715

KNE-AII

via BBK-GORAKHPUR-CHHAPRA

19/03/23, 21/03/23, 24/03/23

22

15716

AJMER-KISHANGANJ

via CHHAPRA-GORAKHPUR-BARABANKI

20/03/23, 21/03/23, 23/03/23

23

14649

 JYG-AMRITSAR

via JAYNAGAR-GORAKHPUR-BARABANKI (14673 route)

19/03/23, 21/03/23, 24/03/23, 26/03/23

24

14650

AMRITSAR-JAYNAGAR

via BARABANKI-GORAKHPUR-JAYNAGAR (14674 route)

18/03/23, 20/03/23, 22/03/23, 25/03/23

25

15025

MAU-ANAND VIHAR T.

COMMENTS

NO Comments. Be the first to Comment...

Add Comment






Submit