For a Proper experience on Trainspy.com, enable JavaScript in your browser

Train Search








15 Trains from (UPD)Ulavapadu to (SKM)SINGARAYAKONDA


Address: Ulavapadu Rd, Ulavapadu Andhra Pradesh

Station Code: UPD

Station Name: Ulavapadu

Zone: SCoR/South Coast

Train Frequency Weekly: 73

Station Traffic: Medium

Address: Singarayakonda Railway Station, Singarayakonda, Andhra Pradesh 523101, India

Station Code: SKM

Station Name: SINGARAYAKONDA

Zone: SCR/South Central

Train Frequency Weekly: 205

Station Traffic: High





Trains
To Check Ticket Availibility Click Classes
TrainTrain NameFromDepToArrTimeDaysClassesStatus
67233BTTR BZA PASSTTU04:29SKM04:490:20M,TU,W,TH,F,SA,SUUNRESERVED67233 Status
57257KAKINADA PSGRTTU05:40SKM05:490:09M,TU,W,TH,F,SA,SUSL,GN,57257 Status
67232GNT TPTY PASSTNR06:08SKM06:160:08M,TU,W,TH,F,SA,SUUNRESERVED67232 Status
57277GDR BZA PASSTTU07:34SKM07:550:21M,TU,W,TH,F,SA,SUUNRESERVED57277 Status
67298BZA GDR MEMUTNR09:24SKM09:330:09M,TU,W,TH,F,SA,SUUNRESERVED67298 Status
67280OGL GDR MEMUTNR10:00SKM10:080:08M,TU,W,TH,F,SA,SUUNRESERVED67280 Status
17479PURI TPTY EXPTNR11:04SKM11:120:08M,W,TH,F,SU2A,3A,SL,GN,17479 Status
17481BSP TPTY EXPRESSTNR11:04SKM11:120:08TU,SA2A,3A,SL,GN,17481 Status
17406KRISHNA EXPTNR15:55SKM16:030:08M,TU,W,TH,F,SA,SU3A,CC,SL,2S,GN,17406 Status
67279GDR OGL MEMUTTU17:07SKM17:280:21M,TU,W,TH,F,SA,SUUNRESERVED67279 Status
67297GDR BZA MEMUTTU17:07SKM17:280:21M,TU,W,TH,F,SA,SUUNRESERVED67297 Status
67234BZA BTTR PASSTNR19:10SKM19:180:08M,TU,W,TH,F,SA,SUUNRESERVED67234 Status
67231TPTY GNT PASSTTU19:20SKM19:370:17M,TU,W,TH,F,SA,SUUNRESERVED67231 Status
57258TIRUPATI PSGRTNR19:31SKM19:400:09M,TU,W,TH,F,SA,SUSL,GN,57258 Status
57278BZA BTTR PASSTNR22:00SKM22:080:08M,TU,W,TH,F,SA,SUUNRESERVED57278 Status
Train Type Train Table Info
SuperFast
Click On Function
Headers Sort-
Background Colour Code
Train No Detail Information About Train on new tab
Train Name Route Time Table & Fare of Train 
From & To Detail Information About Station on new tab
Classes Ticket Availibility
Mail/Express
Rajdhani
Shatabdi
Janshatabdi
Garibrath/Yuva
Duronto
Spl Tourism Trains






RECENT NEWS

1
   

SOUTH CENTRAL RAILWAY
PRESS RELEASE
PUBLIC RELATIONS OFFICE, SECUNDERABAD - 500 071
No.981/2022-2320-03-2023
Secunderabad
PR No. 981 Third Line between Manubolu and Nellore Stations Commissioned along with Electrification

-Part of Vijayawada – Gudur Tripling & Electrification project

South Central Railway Zone in the current financial year has taken up infrastructural works o­n a large scale by giving special thrust to doubling and tripling works along with electrification. This helps in decongesting the existing saturated routes like the Grand Trunk route and eases the train operations. In this direction, third line works between Manubolu - Nellore section has been completed and commissioned for a distance of 29.3 Kms along with electrification as part of Vijayawada - Gudur Tripling & Electrification Project. This stretch of railway line falls under Nellore District of Andhra Pradesh State.

Situated in the Grand Trunk route along the Coastal region of Andhra Pradesh, the section between Vijayawada – Gudur o­n SCR plays a vital role in connecting the Northern and Eastern parts of the country with the Southern states. This route has become highly congested with the steady increase in both Passenger and Freight trains. To decongest this crucial section, the Vijayawada – Gudur Third line project was sanctioned in the year 2015-16 for a distance of 288 Kms at an approximate cost of Rs 3246 crores. The work is being executed by RVNL.

Works have been taken up simultaneously in all the stretches. So far, the sections between Ulavapadu – Kavali for a distance of 29 Kms, Talamanchi – Bitragunta - Sri Venkateswarapalem for a distance of 24.8 Kms, Sri Venkateswarapalem and Kavali for a distance of 12.2 Kms, Talamanchi – Nellore for 17 Kms and the stretch between Karavadi – Chinna Ganjam for 23.5 Kms have been completed and commissioned successfully.  Now, with the completion of 29.3 Kms a total of 135.8 Kms of third line in Vijayawada – Gudur section stands commissioned along with electrification.

Shri Arun Kumar Jain, General Manager has complimented the entire Team of both Vijayawada Division and RVNL officials, who have completed the tripling and electrification works between Manubolu - Nellore section. He stated that third line works between Vijayawada - Gudur are being taken up o­n top priority and the works are in fast progress in all the stretches simultaneously. He also stated that the Zone is planning to commission some more sections pertaining to this tripling project in this financial year.


(Ch.Rakesh)
Chief Public Relations Officer




2
   

SOUTH CENTRAL RAILWAY
PRESS RELEASE
PUBLIC RELATIONS OFFICE, SECUNDERABAD - 500 071
No.892/2022-2315-02-2023
Secunderabad
Bulletin - 3 PR No. 892 Cancellation / Partial Cancellation / Diversion of Trains

InviewofDerailmentof12727Visakhapatnam - HyderabadGodavariExpressbetweenBibinagar-GhatkesarstationinSecunderabadDivision,thefollowingtrainsare Cancelled / PartiallyCancelled/ Diverted asunder:-

 

 

1.CancellationofTrains:

 

Sl. No

Tr. No

From – To

JCO

1

07758

Hyderabad – Kazipet

15.02.2023

2

17659

Secunderabad – Bhadrachalam Road

15.02.2023

 

 

2.PartialCancellationofTrains:

 

Sl. No

Tr. No

From – To

JCO

Partially Cancelled between

1

12728

Hyderabad – Visakhapatnam

15.02.2023

Hyderabad – Vijayawada

2

12727

Visakhapatnam – Hyderabad

15.02.2023

Vijayawada – Hyderabad

3

17646

Repalle – Secunderabad

15.02.2023

Guntur – Secunderabad

4

20811

Visakhapatnam – H.S.Nanded

14.02.2023

Secunderabad – Nanded

5

20812

H.S.Nanded – Visakhapatnam

15.02.2023

Nanded - Secunderabad

3.DiversionofTrains:

 

Sl. No

Tr. No

From – To

JCO

Diverted via

1

12707

Tirupati-H.Nizamuddin

15.02.2023

Kacheguda, Nizamabad, Peddapalli (Skipping Stoppage at Kazipet)

2

12734

Lingampalli – Tirupati

15.02.2023

Secunderabad, Kacheguda, Gadwal, Raichur, Guntakal, Renigunta
(Skipping stoppages Nalgonda, Miryalaguda, Nadikude, Piduguralla, Sattenapalli, Guntur, Tenali, Bapatla, Chirala, o­ngole, Singarayakonda, Kavali, Nellore, Gudur, Venkatagiri, Sri Kalahasti)

3

12251

Yesvantpur – Korba

14.02.2023

Kacheguda, Nizamabad, Peddapalli
(Skipping stoppage at Kazipet)

4

12604

Hyderabad – Chennai Central

15.02.2023

Secunderabad, Kacheguda, Gadwal, Raichur, Guntakal, Renigunta, Arakkonam
(Skipping stoppages Nalgonda, Miryalaguda, Nadikude, Piduguralla, Sattenapalli, Guntur, Tenali, Bapatla, Chirala, o­ngole, Singarayakonda, Kavali, Nellore, Gudur, Sullurpet)

 






COMMENTS

NO Comments. Be the first to Comment...

Add Comment






Submit