For a Proper experience on Trainspy.com, enable JavaScript in your browser

Train Search








53 Trains from (TNA)THANE to (bim)bilimora jn


Address: Thane Junction, Station Road, Kopri, Thane East, Thane, Maharashtra 400601, India

Station Code: TNA

Station Name: THANE

Zone: CR/Central

Train Frequency Weekly: 648

Station Traffic: High

Address: Bilimora Junction Railway Station, Bilimora, Gujarat 396321, India

Station Code: BIM

Station Name: BILIMORA JN

Zone: WR/Western

Train Frequency Weekly: 235

Station Traffic: High





Trains
To Check Ticket Availibility Click Classes
TrainTrain NameFromDepToArrTimeDaysClassesStatus
19041BDTS GCT EXPBVI00:02BL02:1826:16F,SU2A,3A,SL,GN,19041 Status
12927VADODARA EXPBVI00:16BL02:482:32M,TU,W,TH,F,SA,SU1A,2A,3A,SL,GN,12927 Status
22951GANDHIDHAM EXPBVI00:27BL03:042:37TH2A,3A,SL,GN,22951 Status
22965BDTS BGKT EXPBVI00:27BL02:352:08F2A,3A,SL,GN,22965 Status
19019DEHRADUN EXPBVI00:40BL03:202:40M,TU,W,TH,F,SA,SU2A,3A,SL,GN,19019 Status
19003KHANDESH EXPBVI00:53BL03:382:45M,W,SA2A,3A,SL,GN,19003 Status
19201SC PBR EXPKYN04:40BL08:283:48W2A,3A,SL,GN,19201 Status
17204COA BVC EXPRESSKYN04:40BL08:283:48TH2A,3A,SL,GN,17204 Status
17018RAJKOT EXPRESSKYN04:40BL08:303:50M,TU,SA2A,3A,SL,GN,17018 Status
16614RAJKOT EXPRESSKYN04:40BL08:383:58TH2A,3A,SL,GN,16614 Status
22953GUJARAT EXPRESSBVI06:27BL09:112:44M,TU,W,TH,F,SA,SUCC,2S,GN,22953 Status
12935BDTS SURAT EXPADH07:08BL09:542:46M,TU,W,TH,F,SA,SUFC,CC,2S,GN,12935 Status
69139BVI ST PASSBVI07:10VDH11:514:41M,TU,W,TH,F,SA,SUUNRESERVED69139 Status
19567VIVEK EXPKYN07:50BL11:073:17SU2A,3A,SL,GN,19567 Status
19023FZR JANATA EXPBVI08:07AML12:114:04M,TU,W,TH,F,SA,SUSL,2S,GN,19023 Status
19015SAURASHTRA EXPBVI09:02AML12:503:48M,TU,W,TH,F,SA,SU3A,SL,GN,19015 Status
12925PASCHIM EXPRESSADH12:17BL14:482:31M,TU,W,TH,F,SA,SU1A,2A,3A,SL,GN,12925 Status
59439AHMADABAD PASSADH13:08VDH19:045:56M,TU,W,TH,F,SA,SUSL,GN,59439 Status
22917HARIDWAR EXPBVI13:36BL15:522:16W2A,3A,SL,GN,22917 Status
12933KARNAVATI EXPBVI14:17BL16:372:20M,TU,W,TH,F,SA,SUCC,2S,GN,12933 Status
12931ADI DOUBLE DECKRBVI14:57BL16:521:55M,TU,W,TH,F,SACC12931 Status
22931BDTS JSM EXPBVI15:06BL17:152:09F2A,3A,SL,GN,22931 Status
12989AJMER EXPRESSBVI15:06BL17:152:09M,TH,SA2A,3A,SL,GN,12989 Status
22474BDTS BKN SUP EXPBVI15:06BL17:152:09TU2A,3A,SL,GN,22474 Status
19115DDR BHUJ EXPBVI15:31BL17:422:11M,TU,W,TH,F,SA,SU1A,2A,3A,SL,GN,19115 Status
14708RANAKPUR EXPRESBVI15:40BL18:102:30M,TU,W,TH,F,SA,SU2A,3A,SL,GN,14708 Status
12995BDTS AII UDZ EXBVI16:27BL19:262:59W,F,SU2A,3A,SL,GN,12995 Status
12979JAIPUR SUP FASTADH16:32BL19:323:00TU,TH,SA1A,2A,3A,SL,GN,12979 Status
22971BDTS PNBE S FASTBVI17:09BL19:442:35M2A,3A,SL,GN,22971 Status
19217SAU JANATA EXPBVI17:47BL20:222:35M,TU,W,TH,F,SA,SU2A,3A,SL,GN,19217 Status
12953AUG KR RAJ EXPADH18:03BL20:032:00M,TU,W,TH,F,SA,SU1A,2A,3A,12953 Status
12921FLYING RANEEADH18:19AML21:263:07M,TU,W,TH,F,SA,SUFC,CC,2S,GN,12921 Status
22955KUTCH EXPRESSBVI18:20BL20:382:18M,TU,W,TH,F,SA,SU1A,2A,3A,SL,GN,22955 Status
59023BCT BL PASSBVI18:55BL22:554:00M,TU,W,TH,F,SA,SUUNRESERVED59023 Status
12961AVANTIKA EXPBVI19:48BL21:552:07M,TU,W,TH,F,SA,SU1A,2A,3A,SL,GN,12961 Status
22927LOK SHAKTI EXPADH19:58BL22:552:57M,TU,W,TH,F,SA,SU1A,2A,3A,SL,GN,22927 Status
16534SBC JODHPUR EXPKYN21:30BL01:163:46SU2A,3A,SL,GN,16534 Status
16532GARIB NAWAZ EXPKYN21:30BL01:163:46F2A,3A,SL,GN,16532 Status
16508JODHPUR EXPRESSKYN21:30BL01:163:46M,W1A,2A,3A,SL,GN,16508 Status
16210AJMER EXPRESSKYN21:30BL01:173:47TU,TH2A,3A,SL,GN,16210 Status
12971BHAVNAGAR EXPADH21:47BL00:162:29M,TU,W,TH,F,SA,SU2A,3A,SL,GN,12971 Status
11096AHIMSA EXPRESSKYN22:20BL02:113:51W1A,2A,3A,SL,GN,11096 Status
11088PUNE VERAVAL EXPKYN22:20BL02:113:51TH1A,2A,3A,SL,GN,11088 Status
11090PUNE BGKT EXPKYN22:20BL02:113:51SU1A,2A,3A,SL,GN,11090 Status
11092PUNE BHUJ EXPKYN22:20BL02:113:51M1A,2A,3A,SL,GN,11092 Status
22945SAURASHTRA MAILBVI22:26BL00:342:08M,TU,W,TH,F,SA,SU1A,2A,3A,SL,GN,22945 Status
16338OKHA EXPRESSBIRD22:30BL01:282:58W,F2A,3A,SL,GN,16338 Status
16336GANDHIDHAM EXPBIRD22:30BL01:282:58TU2A,3A,SL,GN,16336 Status
16334VERAVAL EXPRESSBIRD22:30BL01:282:58M2A,3A,SL,GN,16334 Status
12901GUJARAT MAILBVI22:53BL01:002:07M,TU,W,TH,F,SA,SU1A,2A,3A,SL,GN,12901 Status
19039AVADH EXPRESSADH22:58BL01:583:00M,TH,SA2A,3A,SL,GN,19039 Status
19037AVADH EXPRESSADH22:58BL01:583:00TU,W,F,SU2A,3A,SL,GN,19037 Status
59441AHMEDABAD PASSBVI23:30VDH04:555:25M,TU,W,TH,F,SA,SU2A,SL,GN,59441 Status
Train Type Train Table Info
SuperFast
Click On Function
Headers Sort-
Background Colour Code
Train No Detail Information About Train on new tab
Train Name Route Time Table & Fare of Train 
From & To Detail Information About Station on new tab
Classes Ticket Availibility
Mail/Express
Rajdhani
Shatabdi
Janshatabdi
Garibrath/Yuva
Duronto
Spl Tourism Trains






RECENT NEWS

1
2023/05/2525-05-2023
Annual Conference of Operations department of Central Railway conducted today 24/05/23



Annual Conference of Operations department of Central Railway conducted today 24/05/23

Shri Naresh Lalwani, General Manager, Central Railway addressed the Senior Divisional Operations Manager’s Annual Conference at Mumbai HQ o­n 24.5.2023.

Shri Alok Singh, Additional General Manager and Shri Mukul Jain, Principal Chief Operations Manager, Central Railway were also present. The conference was attended by Heads of Coaching section, Planning section and Goods section of Operations Department of Central Railway and Operations Department Heads of Mumbai, Bhusawal, Nagpur, Pune and Solapur Divisions.

The targets and achievements of upcoming year 2023-24 have been discussed in conference as follows-

1) Goods loading-

In year 2021-22- 76.16 million tonne (MT) goods loading achieved by CR.

In year 2022-23- 81.88 million tonne goods loading achieved by CR.

In year 2023-24- 90.05 million tonne target of goods loading has been set by CR.

2) Coal loading -

Out of above total loading, coal is highest commodity loading.

In 2021-22- 39.52 MT loading done.

In 22-23- 37.17 MT loading done.

In 23-24- target of 40.95 MT coal loading has been set.

3) Cement loading-

In 22-23- 7.48 MT loading achieved.

In 23-24- target of 8.8 MT is set.

Major plants of Cement loading are- ACC/Wadi/Solapur, ACC/Ghuggus/Nagpur, Ultratech cement/Hotgi/Solapur, Orient cement/Bhadli/Bhusawal.

4) New infrastructures lines completed-

-Bhusawal-Jalgaon new 3rd line & 4th line of 24.13 km completed in year 2022-23.

-Jalgaon-Pachora new 3rd line of 47.59 km completed in year 2022-23.

5) New infrastructure lines under progress-

-Nagpur-Wardha 3rd& 4th line

-Bhusawal-khandwa 3rd & 4th line

-3rd line in Nagpur-Etarasi, Bhusawal-Wardha, Jalgaon-Manmad.

6) Parcel loading hubs-

Bhiwandi, Jalgaon, Ajni/Nagpur have been developed as major parcel loading points.

In 2022-23- 312 parcel train loaded with 764759 tonnage and 45.86 Crores revenue earning.

7) Improvement of goods sheds under progress-

It will be completed in this 2023-24 year. Circulating area, lighting, approach road, labour room, merchant room etc will be renewed.

-Mumbai division- Kalamboli

-Bhusawal division- Kasbe Sukane, Borgaon, Khamgaon, Savda, Burhanpur, Nandgaon

-Nagpur- Tadali, Ballarshah, Kalmeshwar, maramjhiri.

-Pune- Nira, Loni,

-Solapur- Vilad, Ahmednagar, Belapur, Daund, Arag.

8) Daily goods train interchange-

In 2021-22- 317 goods trains taken over/handed over daily by CR with other railway zones.

In 22-23- 336 goods train interchange daily by CR. It's 18.4% increase capacity handling.

9) Infrastructural works completed to increase mail express and goods train mobility-

-Electrification completed at Roha yard, Gurumarket yard/Pune div, Solapur yard, Barshi yard/Solapur yard, Bale yard/solapur div.

-OHE Overhead wire new substations completed at- Karad/Pune div, Ausa/Solapur div, Gaudgaon/Solapur div, Nagothane/Mumbai div.

10) Critical bottleneck infrastructure works completed in year 2022-23-

-Daund- Gulbarga doubling

-Wardha- Chitoda 2nd cord line

-Khapri-Nagpur-Godhani- 20 km automatic signalling system.

-Kamshet/pune div- loop lines extention.

--- --- ---

Date: May 24, 2023

PR No.2023/05/25

This press release is issued by the Public Relations Department, Central Railway, Chhatrapati Shivaji Maharaj Terminus Mumbai.



(Shivraj Manaspure)
Chief Public Relations Officer




2
2023/05/2323-05-2023
General Manager reviews monsoon preparations - Central Railway gears up with monsoon preparations


General Manager reviews monsoon preparations

Central Railway gears up with monsoon preparations

Shri Naresh Lalwani, General Manager, Central Railway reviewed the monsoon preparations of Central Railway. Shri Alok Singh, Additional General Manager, Central Railway, Shri Rajnish Kumar Goyal, Divisional Railway Manager, Mumbai Division and Principal Head of Departments of civil engg, electrical, signalling  were also present.

The details of measures taken for ensuring uninterrupted services are as under-

1)More Water Pumps

24 vulnerable locations identified. 166 pumps will be provided at these locations. Railways will be providing 120 High Power pumps, 15 Normal pumps and Municipal Corporation of Greater Mumbai will be providing the balance 31 pumps. This year the capacity of pumps and nos. of pumps have been increased between 12.5 HP to 100 HP.  The locations identified o­n main line are Masjid, Mazgaon yard, Byculla, Chinchpokli, Currey Road, Parel, Dadar, Matunga, Sion, Kurla, Vikhroli, Kanjurmarg, Bhandup, Mulund and o­n Harbour line are Sewri, Vadala, Guru Tegh Bahadur Nagar, Chunabhatti, Tilak Nagar etc.

2)Micro tunnelling-

Micro tunnelling has been provided at 8 locations such as Masjid, Sandhurst Road, Dadar-Parel area, Matunga-Sion area, Kurla Car Shed, Tilak Nagar nallah, Diva and Kalva. Micro tunneling work is in progress at 2 new locations in Thane-Kalva and Kalva-Mumbra section.

3)Desilting of drains-

Central Railway has targeted de-silting and cleaning of 118.48 kms of drains o­n its suburban section of which, work has been completed for 102.39 kms and work is presently in progress o­n cleaning of another 16 kms of drains.

4)Cleaning of culverts-

CR has cleaned 88 culverts o­n its suburban sections, and work is presently in progress o­n cleaning of 17 more culverts. Culvert Augmentation work by insertion of RCC box done at Kurla-Trombay area, Chunabhatti, Wadala Road, Vidyavihar-LTT area and Tilak Nagar.

5)Trimming of Trees-

Work of cutting and trimming of 43 trees has been done and work is in progress of 23 trees.

6)Muck removal-

Central Railway has set a target of cleaning and removal of 62,000 cubic meters of muck o­n Main lines.

7)Lifting of tracks-

47.8 km track lifting planned, it will be completed till next month.

     8) Works done in Ghat Section-

         -45 meters of Tunnel Portal

         -300 mts of Rockfall Barrier

         -500 sq mts of Boulder Netting

         -40 mts of Canadian Fencing

         -160 mts of Stabilization of banks

         -tunnel sounding- 18 locations

9)Separate pumps will be provided for RUBs- at 14 locations.

10)Reserve boulders and stone dust kept ready in case of unusuals- 7300 cubic meter boulders and 3500 cubic meter sand dust/gravel will be kept ready as reserve.

11)Other Important works in progress-

·Pre-monsoon water proof cable meggering- almost 83% work completed, balance will be completed in 1 week.

·Provision of CCTVs and telephones at 31 Static Watchman Hut in ghat sections.

·Waterproof point motor machines provided at- 277 locations.

·AWS (Auxillary warning system) magnets sealing work for 1506 locations will be completed in this month.

·Installation of flood gates at Masjid, Byculla, Matunga and Sion-Kurla areas.

·Bunter Bhavan nallah at LTT to be connected by removing encroachments.

·Karve nagar nallah improvement work to be done by MCGM and cost to be recovered from Ajmera builders.

·Appointment of consultant for work of clearing of concrete deposited below water mains at Priyadarshini, Chunabhatti.

12)OHE- overhead wire- thermographic checking completed at 1239 track KMs. Thermo vision camera checking of conductor and other parts of OHE is completed.

13)24X7 Control Room- CR Control office, working round the clock, will keep close liaison with Meteorological Department, Disaster Management cell and staff deputed at flood prone areas for continuous monitoring and constant updates.

14)Hourly monitoring- of rainfall and water level above track is taken by control office from field staff during monsoon period.

15)Close coordination with state govt, BMC, TMC, NMMC- Regular meetings conducted between railways and state officials, till now 4 meetings done with municipal commissioner/AMC/Chief engineer. A hotline also created between railways and MCGM disaster cell, TMC, NMMC.

--- --- ---

Date: May 23, 2023

PR No. 2023/05/23

This press release is issued by the Public Relations Department, Central Railway, Chhatrapati Shivaji Maharaj Terminus Mumbai



(Shivraj Manaspure)
Chief Public Relations Officer