For a Proper experience on Trainspy.com, enable JavaScript in your browser

Train Search








62 Trains from (TNA)THANE to (MANR)Mansarovar


Address: Thane Junction, Station Road, Kopri, Thane East, Thane, Maharashtra 400601, India

Station Code: TNA

Station Name: THANE

Zone: CR/Central

Train Frequency Weekly: 648

Station Traffic: High

Address: manas complex, Jui-Kamothe Sector - 36, Kamothe, Navi Mumbai Maharashtra

Station Code: MANR

Station Name: Mansarovar

Zone: CR/Central

Train Frequency Weekly: 1

Station Traffic: Low





Trains
To Check Ticket Availibility Click Classes
TrainTrain NameFromDepToArrTimeDaysClassesStatus
50119DIVA PNVL PASSDIVA00:20PNVL01:100:50M,TU,W,TH,F,SA,SUUNRESERVED50119 Status
09009BDTS MAJN SPLBVI00:23PNVL02:402:17TU2A,3A,SL,GN,09009 Status
09011BDTS MAJN AC SPLBVI00:30PNVL02:402:10SU2A,3A,CC,09011 Status
11003TUTARI EXPRESSTNA00:30PNVL01:150:45M,TU,W,TH,F,SA,SU2A,3A,SL,GN,11003 Status
09007MMCT THVM SPLBVI00:33PNVL02:402:07M,TH2A,3A,SL,GN,09007 Status
09001MMCT MAJN SPLBVI00:33PNVL02:402:07W2A,3A,SL,GN,09001 Status
01001CSMT SWV SPLTNA00:57PNVL02:101:13M,TU,W,F,SU3A,SL,GN,01001 Status
22115LTT KRMI AC SUPTNA01:35PNVL02:100:35TH1A,2A,3A,22115 Status
11099MAO DOUBLEDECKERTNA01:35PNVL02:100:35SACC11099 Status
01039LTT ZARAP SPLTNA01:45PNVL02:200:35M2A,3A,SL,GN,01039 Status
01069LTT PERN SPLTNA01:45PNVL02:200:35F2A,3A,SL,GN,01069 Status
01007CSMT SWV SPLTNA01:45PNVL02:200:35TH,SA3A,SL,GN,01007 Status
50120PNVL DIVA PASSTPND05:03DIVA05:300:27M,TU,W,TH,F,SA,SUUNRESERVED50120 Status
12051JAN SHATABDI EXTNA05:50PNVL06:360:46M,TU,W,TH,F,SA,SUEC,CC,2S,12051 Status
11085MAO DOUBLEDECKRTNA05:52PNVL06:400:48M,WCC11085 Status
50105DIVA SWV PASSDIVA06:25APTA07:291:04M,TU,W,TH,F,SA,SU2S,GN,50105 Status
22119TEJAS EXPRESSTNA06:25PNVL06:580:33TU,TH,SAEC,CC,22119 Status
19312INDB PUNE EXPBIRD07:08PNVL08:050:57TU,SA2A,3A,SL,GN,19312 Status
61010ROHA DIVA MEMUTPND07:16DIVA07:450:29M,TU,W,TH,F,SA,SUUNRESERVED61010 Status
10103MANDOVI EXPRESSTNA07:50PNVL08:250:35M,TU,W,TH,F,SA,SU1A,2A,3A,SL,2S,GN,10103 Status
11025BSL PUNE EXPKYN08:00PNVL09:031:03M,TU,W,TH,F,SA,SUCC,SL,2S,GN,11025 Status
12618MNGLA LKSDP EXPKYN08:35PNVL09:250:50M,TU,W,TH,F,SA,SU2A,3A,SL,GN,12618 Status
61016PEN DIVA MEMU TRAINTPND08:44DIVA09:100:26M,TU,W,TH,FUNRESERVED61016 Status
61011DIVA ROHA MEMUDIVA09:10APTA10:221:12M,TU,W,TH,F,SA,SUUNRESERVED61011 Status
61017DIVA PNVL MEMU TRAINDIVA09:25PNVL10:050:40M,TU,W,TH,FUNRESERVED61017 Status
69165PNVL BSR MEMUTPND09:37DTVL09:520:15M,TU,W,TH,F,SA,SUUNRESERVED69165 Status
61003BSR DIVA DMUBIRD10:20DIVA10:500:30M,TU,W,TH,F,SA,SUUNRESERVED61003 Status
61018PNVL DIVA MEMU TRAINTPND10:47DIVA11:100:23M,TU,W,TH,FUNRESERVED61018 Status
61019DIVA PEN MEMU TRAINDIVA11:20APTA12:221:02M,TU,W,TH,FUNRESERVED61019 Status
16345NETRAVATI EXPTNA12:05PNVL12:500:45M,TU,W,TH,F,SA,SU2A,3A,SL,GN,16345 Status
01033CSMT RN SPLTNA12:08PNVL13:201:12M,TU,W,TH,F,SA,SU3A,SL,GN,01033 Status
50104RN DADAR PASSTPND12:40DIVA13:180:38M,TU,W,TH,F,SA,SU2S,GN,50104 Status
69168BSR PNVL MEMUBIRD12:40PNVL13:451:05M,TU,W,TH,F,SA,SUUNRESERVED69168 Status
61005BSR DIVA DMUBIRD13:21DIVA13:500:29M,TU,W,TH,F,SA,SUUNRESERVED61005 Status
01447PUNE KRMI SPLKYN14:50PNVL15:551:05F3A,SL,GN,01447 Status
69167PNVL BSR MEMUTPND14:52DTVL15:060:14M,TU,W,TH,F,SA,SUUNRESERVED69167 Status
15065GKP PNVL EXPKYN15:05PNVL16:201:15TU,TH,F,SU2A,3A,SL,GN,15065 Status
61020PEN DIVA MEMU TRAINTPND15:05DIVA15:300:25M,TU,W,TH,FUNRESERVED61020 Status
12619MATSYAGANDHA EXPTNA15:45PNVL16:220:37M,TU,W,TH,F,SA,SU2A,3A,SL,GN,12619 Status
50103RATNAGIRI PASSTNA16:05APTA17:241:19M,TU,W,TH,F,SA,SU2S,GN,50103 Status
61007BSR DIVA DMUBIRD16:07DIVA16:350:28M,TU,W,TH,F,SA,SUUNRESERVED61007 Status
12125PRAGATI EXPRESSTNA16:55PNVL17:290:34M,TU,W,TH,F,SA,SUCC,2S,GN,12125 Status
69166BSR PNVL MEMUBIRD17:18PNVL18:251:07M,TU,W,TH,F,SA,SUUNRESERVED69166 Status
22113LTT KCVL EXPRESSTNA17:20PNVL17:550:35TU,SA1A,2A,3A,SL,GN,22113 Status
01041LTT ZARP SPLTNA17:20PNVL18:301:10TH2A,3A,SL,GN,01041 Status
12201KCVL GARIB RATHTNA17:20PNVL17:550:35M,F3A,CC,12201 Status
61021VASAI ROAD DIVA MEMUBIRD18:08DIVA18:350:27M,TU,W,TH,FUNRESERVED61021 Status
61012ROHA DIVA MEMUTPND18:13DIVA18:450:32M,TU,W,TH,F,SA,SUUNRESERVED61012 Status
61015DIVA PEN MEMU TRAINDIVA18:45APTA19:471:02M,TU,W,TH,FUNRESERVED61015 Status
17318LTT HUBLI EXPTNA19:10PNVL19:420:32M,TU,W,TH,F,SA,SU2A,3A,SL,GN,17318 Status
50106SWV DIVA PASSTPND19:27DIVA20:100:43M,TU,W,TH,F,SA,SU2S,GN,50106 Status
61009BSR DIVA DMUBIRD19:43DIVA20:070:24M,TU,W,TH,F,SA,SUUNRESERVED61009 Status
61013DIVA ROHA MEMUDIVA20:00APTA21:061:06M,TU,W,TH,F,SA,SUUNRESERVED61013 Status
12742PNBE VSG EXPRESKYN21:00PNVL21:500:50SA2A,3A,SL,GN,12742 Status
22629DADAR TEN EXPTNA21:05PNVL21:500:45TH2A,3A,SL,GN,22629 Status
16335NAGERCOIL EXPBIRD21:08PNVL22:000:52F2A,3A,SL,GN,16335 Status
16337OKHA ERS EXPBIRD21:08PNVL22:000:52M,SA2A,3A,SL,GN,16337 Status
16333VRL TVC EXPRESSBIRD21:08PNVL22:000:52TH2A,3A,SL,GN,16333 Status
17322LTT HUBBALLI EXPTNA21:40PNVL22:200:40SU2A,3A,SL,GN,17322 Status
12133MANGALORE EXPTNA22:35PNVL23:120:37M,TU,W,TH,F,SA,SU2A,3A,SL,GN,12133 Status
20822HUMSAFAR EXPKYN22:43PNVL23:350:52SA3A20822 Status
10111KONKAN KANYA EXTNA23:45PNVL00:250:40M,TU,W,TH,F,SA,SU1A,2A,3A,SL,GN,10111 Status
Train Type Train Table Info
SuperFast
Click On Function
Headers Sort-
Background Colour Code
Train No Detail Information About Train on new tab
Train Name Route Time Table & Fare of Train 
From & To Detail Information About Station on new tab
Classes Ticket Availibility
Mail/Express
Rajdhani
Shatabdi
Janshatabdi
Garibrath/Yuva
Duronto
Spl Tourism Trains






RECENT NEWS

1
2023/05/2525-05-2023
Annual Conference of Operations department of Central Railway conducted today 24/05/23



Annual Conference of Operations department of Central Railway conducted today 24/05/23

Shri Naresh Lalwani, General Manager, Central Railway addressed the Senior Divisional Operations Manager’s Annual Conference at Mumbai HQ o­n 24.5.2023.

Shri Alok Singh, Additional General Manager and Shri Mukul Jain, Principal Chief Operations Manager, Central Railway were also present. The conference was attended by Heads of Coaching section, Planning section and Goods section of Operations Department of Central Railway and Operations Department Heads of Mumbai, Bhusawal, Nagpur, Pune and Solapur Divisions.

The targets and achievements of upcoming year 2023-24 have been discussed in conference as follows-

1) Goods loading-

In year 2021-22- 76.16 million tonne (MT) goods loading achieved by CR.

In year 2022-23- 81.88 million tonne goods loading achieved by CR.

In year 2023-24- 90.05 million tonne target of goods loading has been set by CR.

2) Coal loading -

Out of above total loading, coal is highest commodity loading.

In 2021-22- 39.52 MT loading done.

In 22-23- 37.17 MT loading done.

In 23-24- target of 40.95 MT coal loading has been set.

3) Cement loading-

In 22-23- 7.48 MT loading achieved.

In 23-24- target of 8.8 MT is set.

Major plants of Cement loading are- ACC/Wadi/Solapur, ACC/Ghuggus/Nagpur, Ultratech cement/Hotgi/Solapur, Orient cement/Bhadli/Bhusawal.

4) New infrastructures lines completed-

-Bhusawal-Jalgaon new 3rd line & 4th line of 24.13 km completed in year 2022-23.

-Jalgaon-Pachora new 3rd line of 47.59 km completed in year 2022-23.

5) New infrastructure lines under progress-

-Nagpur-Wardha 3rd& 4th line

-Bhusawal-khandwa 3rd & 4th line

-3rd line in Nagpur-Etarasi, Bhusawal-Wardha, Jalgaon-Manmad.

6) Parcel loading hubs-

Bhiwandi, Jalgaon, Ajni/Nagpur have been developed as major parcel loading points.

In 2022-23- 312 parcel train loaded with 764759 tonnage and 45.86 Crores revenue earning.

7) Improvement of goods sheds under progress-

It will be completed in this 2023-24 year. Circulating area, lighting, approach road, labour room, merchant room etc will be renewed.

-Mumbai division- Kalamboli

-Bhusawal division- Kasbe Sukane, Borgaon, Khamgaon, Savda, Burhanpur, Nandgaon

-Nagpur- Tadali, Ballarshah, Kalmeshwar, maramjhiri.

-Pune- Nira, Loni,

-Solapur- Vilad, Ahmednagar, Belapur, Daund, Arag.

8) Daily goods train interchange-

In 2021-22- 317 goods trains taken over/handed over daily by CR with other railway zones.

In 22-23- 336 goods train interchange daily by CR. It's 18.4% increase capacity handling.

9) Infrastructural works completed to increase mail express and goods train mobility-

-Electrification completed at Roha yard, Gurumarket yard/Pune div, Solapur yard, Barshi yard/Solapur yard, Bale yard/solapur div.

-OHE Overhead wire new substations completed at- Karad/Pune div, Ausa/Solapur div, Gaudgaon/Solapur div, Nagothane/Mumbai div.

10) Critical bottleneck infrastructure works completed in year 2022-23-

-Daund- Gulbarga doubling

-Wardha- Chitoda 2nd cord line

-Khapri-Nagpur-Godhani- 20 km automatic signalling system.

-Kamshet/pune div- loop lines extention.

--- --- ---

Date: May 24, 2023

PR No.2023/05/25

This press release is issued by the Public Relations Department, Central Railway, Chhatrapati Shivaji Maharaj Terminus Mumbai.



(Shivraj Manaspure)
Chief Public Relations Officer




2
2023/05/2323-05-2023
General Manager reviews monsoon preparations - Central Railway gears up with monsoon preparations


General Manager reviews monsoon preparations

Central Railway gears up with monsoon preparations

Shri Naresh Lalwani, General Manager, Central Railway reviewed the monsoon preparations of Central Railway. Shri Alok Singh, Additional General Manager, Central Railway, Shri Rajnish Kumar Goyal, Divisional Railway Manager, Mumbai Division and Principal Head of Departments of civil engg, electrical, signalling  were also present.

The details of measures taken for ensuring uninterrupted services are as under-

1)More Water Pumps

24 vulnerable locations identified. 166 pumps will be provided at these locations. Railways will be providing 120 High Power pumps, 15 Normal pumps and Municipal Corporation of Greater Mumbai will be providing the balance 31 pumps. This year the capacity of pumps and nos. of pumps have been increased between 12.5 HP to 100 HP.  The locations identified o­n main line are Masjid, Mazgaon yard, Byculla, Chinchpokli, Currey Road, Parel, Dadar, Matunga, Sion, Kurla, Vikhroli, Kanjurmarg, Bhandup, Mulund and o­n Harbour line are Sewri, Vadala, Guru Tegh Bahadur Nagar, Chunabhatti, Tilak Nagar etc.

2)Micro tunnelling-

Micro tunnelling has been provided at 8 locations such as Masjid, Sandhurst Road, Dadar-Parel area, Matunga-Sion area, Kurla Car Shed, Tilak Nagar nallah, Diva and Kalva. Micro tunneling work is in progress at 2 new locations in Thane-Kalva and Kalva-Mumbra section.

3)Desilting of drains-

Central Railway has targeted de-silting and cleaning of 118.48 kms of drains o­n its suburban section of which, work has been completed for 102.39 kms and work is presently in progress o­n cleaning of another 16 kms of drains.

4)Cleaning of culverts-

CR has cleaned 88 culverts o­n its suburban sections, and work is presently in progress o­n cleaning of 17 more culverts. Culvert Augmentation work by insertion of RCC box done at Kurla-Trombay area, Chunabhatti, Wadala Road, Vidyavihar-LTT area and Tilak Nagar.

5)Trimming of Trees-

Work of cutting and trimming of 43 trees has been done and work is in progress of 23 trees.

6)Muck removal-

Central Railway has set a target of cleaning and removal of 62,000 cubic meters of muck o­n Main lines.

7)Lifting of tracks-

47.8 km track lifting planned, it will be completed till next month.

     8) Works done in Ghat Section-

         -45 meters of Tunnel Portal

         -300 mts of Rockfall Barrier

         -500 sq mts of Boulder Netting

         -40 mts of Canadian Fencing

         -160 mts of Stabilization of banks

         -tunnel sounding- 18 locations

9)Separate pumps will be provided for RUBs- at 14 locations.

10)Reserve boulders and stone dust kept ready in case of unusuals- 7300 cubic meter boulders and 3500 cubic meter sand dust/gravel will be kept ready as reserve.

11)Other Important works in progress-

·Pre-monsoon water proof cable meggering- almost 83% work completed, balance will be completed in 1 week.

·Provision of CCTVs and telephones at 31 Static Watchman Hut in ghat sections.

·Waterproof point motor machines provided at- 277 locations.

·AWS (Auxillary warning system) magnets sealing work for 1506 locations will be completed in this month.

·Installation of flood gates at Masjid, Byculla, Matunga and Sion-Kurla areas.

·Bunter Bhavan nallah at LTT to be connected by removing encroachments.

·Karve nagar nallah improvement work to be done by MCGM and cost to be recovered from Ajmera builders.

·Appointment of consultant for work of clearing of concrete deposited below water mains at Priyadarshini, Chunabhatti.

12)OHE- overhead wire- thermographic checking completed at 1239 track KMs. Thermo vision camera checking of conductor and other parts of OHE is completed.

13)24X7 Control Room- CR Control office, working round the clock, will keep close liaison with Meteorological Department, Disaster Management cell and staff deputed at flood prone areas for continuous monitoring and constant updates.

14)Hourly monitoring- of rainfall and water level above track is taken by control office from field staff during monsoon period.

15)Close coordination with state govt, BMC, TMC, NMMC- Regular meetings conducted between railways and state officials, till now 4 meetings done with municipal commissioner/AMC/Chief engineer. A hotline also created between railways and MCGM disaster cell, TMC, NMMC.

--- --- ---

Date: May 23, 2023

PR No. 2023/05/23

This press release is issued by the Public Relations Department, Central Railway, Chhatrapati Shivaji Maharaj Terminus Mumbai



(Shivraj Manaspure)
Chief Public Relations Officer





COMMENTS

NO Comments. Be the first to Comment...

Add Comment






Submit