For a Proper experience on Trainspy.com, enable JavaScript in your browser

Train Search








57 Trains from (TNA)THANE to (KAD)KHANDALA


Address: Thane Junction, Station Road, Kopri, Thane East, Thane, Maharashtra 400601, India

Station Code: TNA

Station Name: THANE

Zone: CR/Central

Train Frequency Weekly: 648

Station Traffic: High

Address: Khandala, Maharashtra 410301, India

Station Code: KAD

Station Name: KHANDALA

Zone: CR/Central

Train Frequency Weekly: 101

Station Traffic: Medium





Trains
To Check Ticket Availibility Click Classes
TrainTrain NameFromDepToArrTimeDaysClassesStatus
16209AII MYS EXPRESSBIRD00:10LNL02:422:32F,SU2A,3A,SL,GN,16209 Status
16505GIMB SBC EXPRESSBIRD00:10LNL02:422:32TU2A,3A,SL,GN,16505 Status
16507JU SBC EXPBIRD00:10LNL02:422:32TH,SA1A,2A,3A,SL,GN,16507 Status
16531SBC GARIB NAWAJBIRD00:10LNL02:422:32M2A,3A,SL,GN,16531 Status
11043MADURAI EXPRESSTNA00:35LNL02:331:58F2A,3A,SL,GN,11043 Status
11027CHENNAI MAILKYN00:40LNL02:071:27M,TU,W,TH,F,SA,SU2A,3A,SL,GN,11027 Status
11087VERAVAL PUNE EXPBIRD00:55LNL03:022:07SA1A,2A,3A,SL,GN,11087 Status
11089BGKTPUNE EXPRESSBIRD00:55LNL03:022:07TU1A,2A,3A,SL,GN,11089 Status
11091BHUJ PUNE EXPBIRD00:55LNL03:022:07W1A,2A,3A,SL,GN,11091 Status
11095AHIMSA EXPRESSBIRD00:55LNL03:022:07TH1A,2A,3A,SL,GN,11095 Status
16533JU SBC EXPRESSKYN01:05LNL02:421:37W2A,3A,SL,GN,16533 Status
11049KOLHAPUR EXPRESSBIRD03:55LNL06:182:23SU2A,3A,SL,GN,11049 Status
22944IND PUNE EXPRESBIRD04:35LNL06:422:07M,W,TH,F,SU2A,3A,SL,GN,22944 Status
22497TPJ HUMSAFAR SUPKYN04:50LNL06:181:28TU3A22497 Status
22105INDRAYANI EXPTNA06:16LNL07:581:42M,TU,W,TH,F,SA,SUCC,2S,GN,22105 Status
19312INDB PUNE EXPBIRD07:08LNL10:133:05TU,SA2A,3A,SL,GN,19312 Status
12127INTERCITY EXPTNA07:19LNL08:371:18M,TU,W,TH,F,SA,SUCC,2S,GN,12127 Status
11007DECCAN EXPRESSTNA07:35LNL09:382:03M,TU,W,TH,F,SA,SUCC,2S,GN,11007 Status
11025BSL PUNE EXPKYN08:00LNL10:442:44M,TU,W,TH,F,SA,SUCC,SL,2S,GN,11025 Status
11301UDYAN EXPRESSKYN09:05LNL10:321:27M,TU,W,TH,F,SA,SU1A,2A,3A,SL,GN,11301 Status
11029KOYNA EXPRESSTNA09:20LNL11:071:47M,TU,W,TH,F,SA,SUCC,2S,GN,11029 Status
17222LTT COA EXPRESSLTT12:25LNL14:231:58TH,SU2A,3A,SL,GN,17222 Status
11075LTT BIDR EXPRESSTNA12:33LNL14:231:50TU2A,3A,SL,GN,11075 Status
11017LTT KARAIKAL EXPTNA12:33LNL14:231:50SA2A,3A,SL,GN,11017 Status
11011LTT NANDED EXPTNA12:33LNL14:231:50W2A,3A,SL,GN,11011 Status
16331TRIVANDRAM EXPTNA12:45LNL14:381:53M2A,3A,SL,GN,16331 Status
16339NAGARCOIL EXPTNA12:45LNL14:381:53W,TH,F,SU2A,3A,SL,GN,16339 Status
16351NAGARCOIL EXPTNA12:45LNL14:381:53TU,SA2A,3A,SL,GN,16351 Status
17031HYDERABAD EXPKYN13:40LNL15:071:27M,TU,W,TH,F,SA,SU2A,3A,SL,GN,17031 Status
11041CSMT CHENNAI EXTNA14:40LNL16:271:47M,TU,W,TH,F,SA,SU2A,3A,SL,GN,11041 Status
11009SINHAGAD EXPTNA15:00LNL17:022:02M,TU,W,TH,F,SA,SUCC,2S,GN,11009 Status
11019KONARK EXPRESSTNA15:40LNL17:331:53M,TU,W,TH,F,SA,SU2A,3A,SL,GN,11019 Status
16381KANYAKUMARI EXPTNA16:15LNL18:021:47M,TU,W,TH,F,SA,SU2A,3A,SL,GN,16381 Status
12125PRAGATI EXPRESSTNA16:55LNL18:481:53M,TU,W,TH,F,SA,SUCC,2S,GN,12125 Status
12494DARSHAN EXPRESSKYN17:50LNL19:371:47F1A,2A,3A,12494 Status
06052ADI MAS SPLKYN18:02LNL19:381:36M2A,3A,SL,GN,06052 Status
11023SAHYADRI EXPRESKYN18:50LNL20:171:27M,TU,W,TH,F,SA,SU2A,3A,SL,GN,11023 Status
19202PBR SC EXPRESSBIRD18:55LNL21:172:22TU2A,3A,SL,GN,19202 Status
17017RJT SC EXPRESSBIRD18:55LNL21:172:22M,W,TH2A,3A,SL,GN,17017 Status
16613COIMBATORE EXPBIRD18:55LNL21:172:22SU2A,3A,SL,GN,16613 Status
17318LTT HUBLI EXPTNA19:10LNL21:382:28M,TU,W,TH,F,SA,SU2A,3A,SL,GN,17318 Status
19568VIVEK EXPRESSKYN19:45LNL21:171:32TH2A,3A,SL,GN,19568 Status
17203BVC KAKINADA EXKYN19:45LNL21:171:32SA2A,3A,SL,GN,17203 Status
17411MAHALAXMI EXPTNA21:00LNL22:541:54M,TU,W,TH,F,SA,SU1A,2A,3A,SL,GN,17411 Status
12163CHENNAI EXPRESSKYN21:10LNL22:371:27M,TU,W,TH,F,SA,SU1A,2A,3A,SL,GN,12163 Status
22143CSMT BIDAR EXPTNA21:35LNL23:221:47W,F,SA1A,2A,3A,SL,GN,22143 Status
22107CSMT LATUR EXPTNA21:35LNL23:221:47M,TU,TH,SU1A,2A,3A,SL,GN,22107 Status
11139CSMT GADAG EXPTNA21:55LNL00:012:06M,TU,W,F,SA,SU1A,2A,3A,SL,GN,11139 Status
11035SHARAVATHI EXPKYN22:13LNL23:421:29TH2A,3A,SL,GN,11035 Status
11005PUDUCHERRY EXPKYN22:13LNL23:421:29M,F,SU2A,3A,SL,GN,11005 Status
11021TIRUNELVELI EXPKYN22:13LNL23:421:29TU,W,SA2A,3A,SL,GN,11021 Status
16588BKN YPR EXPRESSKYN22:39LNL00:171:38TU,SU2A,3A,SL,GN,16588 Status
14806BME YPR AC EXPKYN22:45LNL00:231:38F1A,2A,3A,14806 Status
12115SIDDHESHWAR EXPTNA23:20LNL01:131:53M,TU,W,TH,F,SA,SU1A,2A,3A,SL,GN,12115 Status
51027FAST PASSENGERTNA23:35KMST02:122:37TH,F,SASL,GN,51027 Status
51029BJP FAST PASSTNA23:35KMST02:122:37M,TU,W,SUSL,GN,51029 Status
51033SHIRDI FAST PASSTNA23:35KMST02:112:36M,TU,W,TH,F,SA,SU3A,SL,GN,51033 Status
Train Type Train Table Info
SuperFast
Click On Function
Headers Sort-
Background Colour Code
Train No Detail Information About Train on new tab
Train Name Route Time Table & Fare of Train 
From & To Detail Information About Station on new tab
Classes Ticket Availibility
Mail/Express
Rajdhani
Shatabdi
Janshatabdi
Garibrath/Yuva
Duronto
Spl Tourism Trains






RECENT NEWS

1
2023/05/2525-05-2023
Annual Conference of Operations department of Central Railway conducted today 24/05/23



Annual Conference of Operations department of Central Railway conducted today 24/05/23

Shri Naresh Lalwani, General Manager, Central Railway addressed the Senior Divisional Operations Manager’s Annual Conference at Mumbai HQ o­n 24.5.2023.

Shri Alok Singh, Additional General Manager and Shri Mukul Jain, Principal Chief Operations Manager, Central Railway were also present. The conference was attended by Heads of Coaching section, Planning section and Goods section of Operations Department of Central Railway and Operations Department Heads of Mumbai, Bhusawal, Nagpur, Pune and Solapur Divisions.

The targets and achievements of upcoming year 2023-24 have been discussed in conference as follows-

1) Goods loading-

In year 2021-22- 76.16 million tonne (MT) goods loading achieved by CR.

In year 2022-23- 81.88 million tonne goods loading achieved by CR.

In year 2023-24- 90.05 million tonne target of goods loading has been set by CR.

2) Coal loading -

Out of above total loading, coal is highest commodity loading.

In 2021-22- 39.52 MT loading done.

In 22-23- 37.17 MT loading done.

In 23-24- target of 40.95 MT coal loading has been set.

3) Cement loading-

In 22-23- 7.48 MT loading achieved.

In 23-24- target of 8.8 MT is set.

Major plants of Cement loading are- ACC/Wadi/Solapur, ACC/Ghuggus/Nagpur, Ultratech cement/Hotgi/Solapur, Orient cement/Bhadli/Bhusawal.

4) New infrastructures lines completed-

-Bhusawal-Jalgaon new 3rd line & 4th line of 24.13 km completed in year 2022-23.

-Jalgaon-Pachora new 3rd line of 47.59 km completed in year 2022-23.

5) New infrastructure lines under progress-

-Nagpur-Wardha 3rd& 4th line

-Bhusawal-khandwa 3rd & 4th line

-3rd line in Nagpur-Etarasi, Bhusawal-Wardha, Jalgaon-Manmad.

6) Parcel loading hubs-

Bhiwandi, Jalgaon, Ajni/Nagpur have been developed as major parcel loading points.

In 2022-23- 312 parcel train loaded with 764759 tonnage and 45.86 Crores revenue earning.

7) Improvement of goods sheds under progress-

It will be completed in this 2023-24 year. Circulating area, lighting, approach road, labour room, merchant room etc will be renewed.

-Mumbai division- Kalamboli

-Bhusawal division- Kasbe Sukane, Borgaon, Khamgaon, Savda, Burhanpur, Nandgaon

-Nagpur- Tadali, Ballarshah, Kalmeshwar, maramjhiri.

-Pune- Nira, Loni,

-Solapur- Vilad, Ahmednagar, Belapur, Daund, Arag.

8) Daily goods train interchange-

In 2021-22- 317 goods trains taken over/handed over daily by CR with other railway zones.

In 22-23- 336 goods train interchange daily by CR. It's 18.4% increase capacity handling.

9) Infrastructural works completed to increase mail express and goods train mobility-

-Electrification completed at Roha yard, Gurumarket yard/Pune div, Solapur yard, Barshi yard/Solapur yard, Bale yard/solapur div.

-OHE Overhead wire new substations completed at- Karad/Pune div, Ausa/Solapur div, Gaudgaon/Solapur div, Nagothane/Mumbai div.

10) Critical bottleneck infrastructure works completed in year 2022-23-

-Daund- Gulbarga doubling

-Wardha- Chitoda 2nd cord line

-Khapri-Nagpur-Godhani- 20 km automatic signalling system.

-Kamshet/pune div- loop lines extention.

--- --- ---

Date: May 24, 2023

PR No.2023/05/25

This press release is issued by the Public Relations Department, Central Railway, Chhatrapati Shivaji Maharaj Terminus Mumbai.



(Shivraj Manaspure)
Chief Public Relations Officer




2
2023/05/2323-05-2023
General Manager reviews monsoon preparations - Central Railway gears up with monsoon preparations


General Manager reviews monsoon preparations

Central Railway gears up with monsoon preparations

Shri Naresh Lalwani, General Manager, Central Railway reviewed the monsoon preparations of Central Railway. Shri Alok Singh, Additional General Manager, Central Railway, Shri Rajnish Kumar Goyal, Divisional Railway Manager, Mumbai Division and Principal Head of Departments of civil engg, electrical, signalling  were also present.

The details of measures taken for ensuring uninterrupted services are as under-

1)More Water Pumps

24 vulnerable locations identified. 166 pumps will be provided at these locations. Railways will be providing 120 High Power pumps, 15 Normal pumps and Municipal Corporation of Greater Mumbai will be providing the balance 31 pumps. This year the capacity of pumps and nos. of pumps have been increased between 12.5 HP to 100 HP.  The locations identified o­n main line are Masjid, Mazgaon yard, Byculla, Chinchpokli, Currey Road, Parel, Dadar, Matunga, Sion, Kurla, Vikhroli, Kanjurmarg, Bhandup, Mulund and o­n Harbour line are Sewri, Vadala, Guru Tegh Bahadur Nagar, Chunabhatti, Tilak Nagar etc.

2)Micro tunnelling-

Micro tunnelling has been provided at 8 locations such as Masjid, Sandhurst Road, Dadar-Parel area, Matunga-Sion area, Kurla Car Shed, Tilak Nagar nallah, Diva and Kalva. Micro tunneling work is in progress at 2 new locations in Thane-Kalva and Kalva-Mumbra section.

3)Desilting of drains-

Central Railway has targeted de-silting and cleaning of 118.48 kms of drains o­n its suburban section of which, work has been completed for 102.39 kms and work is presently in progress o­n cleaning of another 16 kms of drains.

4)Cleaning of culverts-

CR has cleaned 88 culverts o­n its suburban sections, and work is presently in progress o­n cleaning of 17 more culverts. Culvert Augmentation work by insertion of RCC box done at Kurla-Trombay area, Chunabhatti, Wadala Road, Vidyavihar-LTT area and Tilak Nagar.

5)Trimming of Trees-

Work of cutting and trimming of 43 trees has been done and work is in progress of 23 trees.

6)Muck removal-

Central Railway has set a target of cleaning and removal of 62,000 cubic meters of muck o­n Main lines.

7)Lifting of tracks-

47.8 km track lifting planned, it will be completed till next month.

     8) Works done in Ghat Section-

         -45 meters of Tunnel Portal

         -300 mts of Rockfall Barrier

         -500 sq mts of Boulder Netting

         -40 mts of Canadian Fencing

         -160 mts of Stabilization of banks

         -tunnel sounding- 18 locations

9)Separate pumps will be provided for RUBs- at 14 locations.

10)Reserve boulders and stone dust kept ready in case of unusuals- 7300 cubic meter boulders and 3500 cubic meter sand dust/gravel will be kept ready as reserve.

11)Other Important works in progress-

·Pre-monsoon water proof cable meggering- almost 83% work completed, balance will be completed in 1 week.

·Provision of CCTVs and telephones at 31 Static Watchman Hut in ghat sections.

·Waterproof point motor machines provided at- 277 locations.

·AWS (Auxillary warning system) magnets sealing work for 1506 locations will be completed in this month.

·Installation of flood gates at Masjid, Byculla, Matunga and Sion-Kurla areas.

·Bunter Bhavan nallah at LTT to be connected by removing encroachments.

·Karve nagar nallah improvement work to be done by MCGM and cost to be recovered from Ajmera builders.

·Appointment of consultant for work of clearing of concrete deposited below water mains at Priyadarshini, Chunabhatti.

12)OHE- overhead wire- thermographic checking completed at 1239 track KMs. Thermo vision camera checking of conductor and other parts of OHE is completed.

13)24X7 Control Room- CR Control office, working round the clock, will keep close liaison with Meteorological Department, Disaster Management cell and staff deputed at flood prone areas for continuous monitoring and constant updates.

14)Hourly monitoring- of rainfall and water level above track is taken by control office from field staff during monsoon period.

15)Close coordination with state govt, BMC, TMC, NMMC- Regular meetings conducted between railways and state officials, till now 4 meetings done with municipal commissioner/AMC/Chief engineer. A hotline also created between railways and MCGM disaster cell, TMC, NMMC.

--- --- ---

Date: May 23, 2023

PR No. 2023/05/23

This press release is issued by the Public Relations Department, Central Railway, Chhatrapati Shivaji Maharaj Terminus Mumbai



(Shivraj Manaspure)
Chief Public Relations Officer





COMMENTS

NO Comments. Be the first to Comment...

Add Comment






Submit