For a Proper experience on Trainspy.com, enable JavaScript in your browser

Train Search








2 Trains from (STA)SATNA to (MRJ)MIRAJ JN


Address: Railway Station Rd, Satna, Madhya Pradesh 485001, India

Station Code: STA

Station Name: SATNA

Zone: WCR/West Central

Train Frequency Weekly: 462

Station Traffic: High

Address: Miraj Railway Station, Maniknagar Bypass, Miraj, Maharashtra 416410, India

Station Code: MRJ

Station Name: MIRAJ JN

Zone: CR/Central

Train Frequency Weekly: 383

Station Traffic: High





Trains
To Check Ticket Availibility Click Classes
TrainTrain NameFromDepToArrTimeDaysClassesStatus
11046DIKSHABHUMI EXPSTA03:55MRJ02:1046:15M3A,SL,GN,11046 Status
15018GKP LTT EXPSTA20:00JSP11:3439:34M,TU,W,TH,F,SA,SU2A,3A,SL,GN,15018 Status
Train Type Train Table Info
SuperFast
Click On Function
Headers Sort-
Background Colour Code
Train No Detail Information About Train on new tab
Train Name Route Time Table & Fare of Train 
From & To Detail Information About Station on new tab
Classes Ticket Availibility
Mail/Express
Rajdhani
Shatabdi
Janshatabdi
Garibrath/Yuva
Duronto
Spl Tourism Trains






RECENT NEWS

1
Press Release No. 11808-06-2023
Hubballi
Press Release No. 118, STATUTORY INSPECTION OF NEWLY DOUBLED UGARKHURD – VIJAYANAGAR RAILWAY SECTION

दक्षिण à¤ªà¤¶à¥à¤šà¤¿à¤® à¤°à¥‡à¤²à¤µà¥‡ / SOUTH WESTERN RAILWAY  
प्रेस à¤µà¤¿à¤œà¥à¤žà¤ªà¥à¤¤à¤¿ / Press Release No. 118 Dt: 08.06.2023

STATUTORY INSPECTION OF NEWLY DOUBLED UGARKHURD – VIJAYANAGAR RAILWAY SECTION

The doubling of railway track between Ugarkhurd – Vijayanagar (18.5 km) has been completed at a cost of Rs. 210 crore. Statutory inspection by Commissioner of Railway Safety is scheduled o­n 09.06.2023. After the inspection and compliances to various safety norms, the newly laid track will be open for railway service.

The doubling is part of Londa – Miraj project sanctioned in 2015-16. The project is 100% funded by Ministry of Railways. So far, 154 km out of 186 km had been commissioned. The stretch from Londa – Ghataprabha was dedicated by Hon’ble PM in March 2023.

Doubling of railway track enhances the capacity as well as safety. Not o­nly can more number of trains be operated, but the direction of traffic is fixed (Up line and Down Line) and express / passenger trains need not wait for crossing of other trains (passenger or goods).

The Newly doubled section between Ugarkhurd – Vijayanagar consists of 02 major bridges, 27 minor bridges and 2 Road Over Bridges. There are three stations namely Ugarkhurd, Vijayanagar & Shedbal.

During the statutory inspection of commissioner of Railway Safety, speed trial will be carried out, therefore public are cautioned to the be careful and not trespass the railway tracks.

                                                                                                                                Aneesh Hegde
                                                                             Chief Public Relations Officer                                                                                                  South Western Railway, Hubballi 





2
142/2023-24 05-06-2023
Chennai
Bharat Gaurav Round Trip service between Nagercoil and Banaras Train No. 06911/06912 Nagercoil – Banaras – Nagercoil Bharat Gaurav Train:

Train No. 06911 Nagercoil – Banaras Bharat Gaurav Train will leave Nagercoil at 11.00 hrs of 06.06.2023 (Tuesday) and reach Banaras at 04.25 hrs, the seventh day via Vijayawada, Bhubaneswar, Kolkata and Gaya.


Train No. 06912 Banaras – Coimbatore North Bharat Gaurav Train will leave Banaras at 05.00 hrs o­n 13.06.2023 (Tuesday) and reach Nagercoil at 00.45 hrs, the fifth day via Prayagraj, Nagpur and Vijayawada.


Coach Composition:1- AC Two Tier Coach, 7- AC Three Tier Coaches, 3-Sleeper Class Coach, 1- Pantry Car & 2- Luggage cum Brake vans


The details of timings and stoppages of Train No. 06911/06912 Nagercoil –Banaras – Nagercoil Bharat Gaurav Train Round Trip service are as follows (Timings in hours):


Date

Station

Arrival

Departure

06.06.2023

Tuesday

Nagercoil

--

11.00

Thiruvananthapuram Central

13.10

13.15

Kollam Jn

14.15

14.20

Kottayam

16.55

17.05

Ernakulam Town

18.05

18.10

Thrissur

19.45

19.50

Ottappalam

21.15

21.20

Palakkad

22.35

22.40

Erode Jn

02.20

02.30

Salem Jn

03.15

03.20

Jolarpettai

05.00

05.20

Katpadi Jn.

06.40

06.45

Arakkonam

08.03

08.05

Perambur

09.00

09.05

Vijayawada

15.10

15.25

Duvvada

21.45

21.50

Simhachalam    North

22.20

22.25

Pendur

22.30

22.45

Vizianagaram Jn.

23.15

23.25

Malatipatpur

05.30

-

09.06.2023

Friday

Malatipatpur

-

15.30

Khurda Road Jn.

16.30

16.40

Bhubaneswar

17.00

17.05

Kharagpur

23.50

23.55

10.06.2023

Saturday

Andul

01.45

01.50

Kolkata

07.15

-

Kolkata

-

23.30

Dhanbad Jn.

04.45

04.50

Gaya

08.00

23.45

12.06.2023

Monday

Pt. Deen Dayal Upadhyaya  Jn.

02.45

02.55

Banaras

04.25

-

13.06.2023 Tuesday

Banaras

-

05.00

Prayagraj sangam

10.00

17.00

Prayag Jn.

17.15

17.45

Prayagraj Jn.

18.10

18.35

Satna

21.35

21.40

14.06.2023

Wednesday

Jabalpur

00.10

00.20

Itarsi Jn.

04.30

04.40

COMMENTS
NO Comments. Be the first to Comment...

Add Comment






Submit