For a Proper experience on Trainspy.com, enable JavaScript in your browser

Train Search








8 Trains from (SPRD)SINGAPURAM ROAD to (ANB)AMMANABROLU


Address: Singapuram Road Station, JK Pur, Odisha 765017, India

Station Code: SPRD

Station Name: SINGAPURAM ROAD

Zone: ECoR/East Coast

Train Frequency Weekly: 133

Station Traffic: Medium

Address: Ammanabrolu Railway Station, Ammanabrolu, Andhra Pradesh 523180, India

Station Code: ANB

Station Name: AMMANABROLU

Zone: SCR/South Central

Train Frequency Weekly: 113

Station Traffic: Medium





Trains
To Check Ticket Availibility Click Classes
TrainTrain NameFromDepToArrTimeDaysClassesStatus
13351DHN ALAPPUZHA ESPRD04:22OGL19:2915:07M,TU,W,TH,F,SA,SU2A,3A,SL,GN,13351 Status
18189TATA ALLP EXPSPRD04:22OGL18:5414:32M,TU,W,TH,F,SA,SU2A,3A,SL,GN,18189 Status
12376ASN MAS EXPRESSRGDA06:10OGL17:2811:18W2A,3A,SL,GN,12376 Status
12889TATA YPR EXPRGDA06:10OGL17:2411:14F2A,3A,SL,GN,12889 Status
22837DHARTI AABA EXPRGDA06:10OGL17:2411:14M2A,3A,GN,22837 Status
13576JSME TBM EXPRGDA06:10OGL17:2811:18W2A,3A,SL,GN,13576 Status
08301SBP BAND SPLRGDA15:55OGL02:4310:48W2A,3A,SL,GN,08301 Status
17481BSP TPTY EXPRESSSPRD19:02OGL10:4915:47TU,SA2A,3A,SL,GN,17481 Status
Train Type Train Table Info
SuperFast
Click On Function
Headers Sort-
Background Colour Code
Train No Detail Information About Train on new tab
Train Name Route Time Table & Fare of Train 
From & To Detail Information About Station on new tab
Classes Ticket Availibility
Mail/Express
Rajdhani
Shatabdi
Janshatabdi
Garibrath/Yuva
Duronto
Spl Tourism Trains






RECENT NEWS

1
   

SOUTH CENTRAL RAILWAY
PRESS RELEASE
PUBLIC RELATIONS OFFICE, SECUNDERABAD - 500 071
No.409/2021-2214-09-2021
Secunderabad
SCR Commissions Longer Loop Line at Navabpalem Station




- To ease freight operations & to accommodate Longer Haul Goods trains

- This is the second longer loop over the zone

To enhance train operations, ease congestion and to accommodate long haul goods trains with additional wagons than the standard composition, SCR has commissioned a longer loop line at Navabpalem Railway Station of Vijayawada Division located o­n the Grand trunk route of Vijayawada – Visakhapatnam section. This is the second longer loop that has been constructed o­n the Zone, the first o­ne being at Bikkavolu station.

In Railways, loop lines are constructed in station area to handle more number of trains and to ease out the train operations. Normally, the loop lines at a station are constructed with a length of 750 meters which can accommodate a full-length goods train with multiple engines. With the increasing need to transport huge quantities at a o­ne go, it has necessitated to handle longer trains having more number of wagons than the regular composition. To mitigate this problem, Indian Railways has been encouraging the construction of Longer Loop lines of around 1500 meters (which is double than the existing loop line lengths).

Considering the importance of longer loop lines, Ministry of Railways has accorded sanction for construction of Longer Loops at six stations of Vijayawada Division viz., Bikkavolu, Navabpalem & Elamanchili in Vijayawada – Visakhapatnam section and Nidubrolu, Ammanabrolu & Bitragunta in Vijayawada – Chennai section. Out of these, now, two longer loops have been commissioned i.e., At Bikkavolu and Navabpalem stations. Works are in the fast progress at the remaining locations.

Salient features of Longer Loop line at Navabpalem station

v The Electronic interlocking system has been provided with 70 routes.

v Advanced Axle counters have been provided for Intermediate Block signals located in Navabpalem - Tadepalligudem & Navabpalem - Nidadavolu sections.

v The Central Interlocking system, Data loggers are provided with modern equipment.

v Fire alarm facility is provided for enhanced protection.

v The execution of works has been done with meticulous planning duly completing the NI work within seven days as against scheduled period of 9 days.

v 2 sets of Unimat machines and T-28 Cranes have been used at the site for faster work.

v The main line and loop line of the station have been provided with separate elementary sections to facilitate independent OHE blocks.

Benefits of Longer Loop Lines

v Will accommodate long haul trains like Jai Kisan specials where 2 freight trains are combined and run for quick mobility

v Provision for crossing of trains to enable faster movement of trains without too much detention of freight trains

v Improves punctuality of passenger trains by avoiding main line regulation of Goods trains

v Improves overall train operations.

v Reduces the wagon detention and travel expenses.

v Enables in handling more number of trains.

Shri Gajanan Mallya, General Manger, SCR complimented the officials of Vijayawada Division o­n completion of second longer loop line over the Zone with sincere and dedicated efforts. He instructed the officials to complete the remaining longer loop lines o­n fast pace for overall improvement in operation of freight trains in the busy trunk route section.





2
   

SOUTH CENTRAL RAILWAY
PRESS RELEASE
PUBLIC RELATIONS OFFICE, SECUNDERABAD - 500 071
No.459/2020-2118-12-2020
Secunderabad
First Longer Loop Line of SCR commissioned at Bikkavolu Station

\




To ease freight operations & to accommodate Longer Haul Goods trains

The First Longer Loop Line of South Central Railway has been commissioned at Bikkavolu Railway Station of Vijayawada Division located o­n the busy Vijayawada – Visakhapatnam (Waltair) section.

In Railways, loop lines are constructed in station area to accommodate more number of trains and to ease out the train operations. Normally, these loop lines are constructed with a length of 750 meters which can accommodate a full-length goods train with multiple engines. With the increasing need to handle more number of trains with higher average speeds, Indian Railways has been encouraging the construction of Longer Loop lines of around 1500 meters (which is double than the existing loop line lengths).

Over SCR, the Ministry of Railways has initially sanctioned construction of Longer Loops at six stations of Vijayawada Division viz., Bikkavolu, Nawabpalem & Elamanchili in Vijayawada – Visakhapatnam section and Nidubrolu, Ammanabrolu & Bitragunta in Vijayawada – Chennai section.

Accordingly, the Longer Loop line works at Bikkavolu station has been taken up and completed well before the target date and this longer loop line stands as first o­ne commissioned across the Zone. Further, the works for commissioning of longer loop lines at Nidubrolu, Ammanabrolu and Bitragunta stations are in progress simultaneously along with 3rd Line works being carried out between Vijayawada – Gudur, while the longer loops at Nawabpalem and Elamanchili are nearing completion and are targeted for commissioning in 2021.

The execution of works for construction of Longer Loop at Bikkavolu has been taken up with meticulous planning without any disruption to regular train services. The total cost of this project is around Rs 85 crores. The loop line is having two isolations to strengthen the safety and also facilitates stabling two trains at a time.

The benefits of Longer loop are :-

v Will accommodate Long haul trains like Jai Kisan specials where 2 freight trains are combined and run for quick mobility

v Provision for crossing of trains to enable faster movement of trains without too much detention of freight trains

v Improves punctuality of passenger trains by avoiding main line regulation of Goods trains

v Improves overall train operations.

v Enables in handling more number of trains.

Shri Gajanan Mallya, General Manger, SCR complimented the officials of Vijayawada Division o­n completion of First longer loop line over the Zone. He instructed the officials to complete the remaining 5 longer loop lines o­n fast pace for overall improvement in operation of freight trains in busy trunk route section.






COMMENTS

NO Comments. Be the first to Comment...

Add Comment






Submit