For a Proper experience on Trainspy.com, enable JavaScript in your browser

Train Search








6 Trains from (SNRD)Sandhurst Road to (BNC)BANGALORE CANT


Address: Dr Meisheri Rd, Dongri, Umerkhadi, Mumbai Maharashtra

Station Code: SNRD

Station Name: Sandhurst Road

Zone: CR/Central

Train Frequency Weekly: 1

Station Traffic: Low

Address: Cantonment Railway Station, Cantonment Railway Station Road, Vasanth Nagar, Bangalore, Karnataka, India

Station Code: BNC

Station Name: BANGALORE CANT

Zone: SWR/South Western

Train Frequency Weekly: 473

Station Traffic: High





Trains
To Check Ticket Availibility Click Classes
TrainTrain NameFromDepToArrTimeDaysClassesStatus
11301UDYAN EXPRESSDR08:25BNC08:1023:45M,TU,W,TH,F,SA,SU1A,2A,3A,SL,GN,11301 Status
16331TRIVANDRAM EXPDR12:20KJM10:2822:08M2A,3A,SL,GN,16331 Status
16339NAGARCOIL EXPDR12:20KJM10:2822:08W,TH,F,SU2A,3A,SL,GN,16339 Status
11005PUDUCHERRY EXPDR21:30YPR21:3024:00M,F,SU2A,3A,SL,GN,11005 Status
11021TIRUNELVELI EXPDR21:30YPR21:3024:00TU,W,SA2A,3A,SL,GN,11021 Status
11013COIMBATORE EXPLTT22:35BNC22:2023:45M,TU,W,TH,F,SA,SU1A,2A,3A,SL,GN,11013 Status
Train Type Train Table Info
SuperFast
Click On Function
Headers Sort-
Background Colour Code
Train No Detail Information About Train on new tab
Train Name Route Time Table & Fare of Train 
From & To Detail Information About Station on new tab
Classes Ticket Availibility
Mail/Express
Rajdhani
Shatabdi
Janshatabdi
Garibrath/Yuva
Duronto
Spl Tourism Trains






RECENT NEWS

1
0102-06-2023
TRAIN SERVICES OVER EAST COAST RAILWAY JURISDICTION TO BE AFFECTED TEMPORARILY FOR SAFETY RELATED MODERNISATION WORK AT DIFFERENT PLACES:

TRAIN SERVICES OVER EAST COAST RAILWAY JURISDICTION TO BE AFFECTED TEMPORARILY FOR SAFETY RELATED MODERNISATION WORK AT DIFFERENT PLACES:

●        Bridge rebuilding between Rajathagarh and Joranda road in Bhubaneswar/Cuttack-Dhenkanal Railway Section:

●        Construction of Limited Height Subways in Chhatrapur-Jagannathpur Railway Stations in Chhatrapur-Brahmapur Rail Section.

●        Second chord line between Brundamal Station and MAVM Siding.

●        Bridge Rebuilding between Khariar Road-Nawapara Road-Lapanga and Important Track Machine Works between Lapanga & Rengali.

Cancellation of Train:

A.08441/08442 Bhubaneswar-Brahmapur-Bhubaneswar Passenger Special from both the directions o­n 5th June 2023.

B.08264 Bilaspur-Titilagarh Passenger from Bilaspur from 7th to 9th June.

C.08277 Titilagarh-Raipur Passenger from Titilagarh from 7th to 9th June.

D.08171/08172 Jharsuguda-Sambalpur-Jharsuguda MEMU from both sides from 7th to 9th June.

E. 08169/08170 Jharsuguda-Sambalpur-Jharsuguda MEMU from both sides from 7th to 9thJune.

F.08263Titilagarh-Bilaspur Passenger from Titilagarh from 8th to 10th June.

G.08278 Raipur-Titilagarh Passenger from Raipur from 8th to 10th June.

H.08527/08528 Raipur-Visakhapatnam-Raipur Passenger Special from both sides o­n 3rd June, 2023.

I.08275 Raipur-Junagarh Road Passenger Special from Raipur o­n 3rd June’2023.

J.08276 Junagarh Road-Raipur Passenger Special from Junagarh Road o­n 4th June’2023.

 

Partial Cancellation of Trains:

A.08263 Titilagarh-Bilaspur Passenger Special from Titilagarh o­n 3rd & 5th June 2023 will run up to Sambalpur and will return to Titilagarh as 08264 Bilaspur-Titilagarh Passenger Special.

B.08264 Bilaspur-Titilagarh Passenger Special from Bilaspur o­n 3rd & 5th June 2023 will run up to Brajarajnagar and will return back as 08263 Titilagarh-Bilaspur Passenger Special from Brajarajnagar to Bilaspur.

C.Services of both the trains between Sambalpur and Brajarajnagar from both sides will remain cancelled.

Rescheduling of Train:

         

A.17016 Secunderabad-Bhubaneswar Visakha Express from Secunderabad at 1650hrs will leave at 2050hrs o­n 4thJune 2023.

B.12840 Chennai-Howrah Mail from Chennai at 1920hrs will leave at 2320hrs o­n 4th June 2023.

C.18048 Vasco da gama-Howrah Amaravati Express from Vasco at 0630hrs will leave at 1030hrs o­n 4th June 2023.

D.12807 Visakhapatnam-Nizamuddin Samata Express from Visakhapatnam o­n 3rd June will leave at 1020hrs instead of 0920hrs.

E.20808 Amritsar-Visakhapatnam Hirakud Express from Amritsar 3rd June at 2355hrs will leave at 0455hrs o­n 4thJune 2023.

F.18125 Rourkela-Puri Express from Rourkela o­n 3rd, 5th & 7th June 2023 will leave at 1005hrs instead of 0805hrs.

Regulation of Trains:

20808 Amritsar-Visakhapatnam Hirakud Express from Amritsar o­n 31st May, 22840 Bhubaneswar-Rourkela Inter City Express from Bhubaneswr o­n 2ndJune, 20895 Rameswaram-Bhubaneswar Express from Rameswaram o­n 4thJune and 18464 Bangalore-Bhubaneswar Prashanti Express from Bangalore o­n 4thJune 2023 will be controlled en-route for a few minutes.





2
2023/05/2323-05-2023
General Manager reviews monsoon preparations - Central Railway gears up with monsoon preparations


General Manager reviews monsoon preparations

Central Railway gears up with monsoon preparations

Shri Naresh Lalwani, General Manager, Central Railway reviewed the monsoon preparations of Central Railway. Shri Alok Singh, Additional General Manager, Central Railway, Shri Rajnish Kumar Goyal, Divisional Railway Manager, Mumbai Division and Principal Head of Departments of civil engg, electrical, signalling  were also present.

The details of measures taken for ensuring uninterrupted services are as under-

1)More Water Pumps

24 vulnerable locations identified. 166 pumps will be provided at these locations. Railways will be providing 120 High Power pumps, 15 Normal pumps and Municipal Corporation of Greater Mumbai will be providing the balance 31 pumps. This year the capacity of pumps and nos. of pumps have been increased between 12.5 HP to 100 HP.  The locations identified o­n main line are Masjid, Mazgaon yard, Byculla, Chinchpokli, Currey Road, Parel, Dadar, Matunga, Sion, Kurla, Vikhroli, Kanjurmarg, Bhandup, Mulund and o­n Harbour line are Sewri, Vadala, Guru Tegh Bahadur Nagar, Chunabhatti, Tilak Nagar etc.

2)Micro tunnelling-

Micro tunnelling has been provided at 8 locations such as Masjid, Sandhurst Road, Dadar-Parel area, Matunga-Sion area, Kurla Car Shed, Tilak Nagar nallah, Diva and Kalva. Micro tunneling work is in progress at 2 new locations in Thane-Kalva and Kalva-Mumbra section.

3)Desilting of drains-

Central Railway has targeted de-silting and cleaning of 118.48 kms of drains o­n its suburban section of which, work has been completed for 102.39 kms and work is presently in progress o­n cleaning of another 16 kms of drains.

4)Cleaning of culverts-

CR has cleaned 88 culverts o­n its suburban sections, and work is presently in progress o­n cleaning of 17 more culverts. Culvert Augmentation work by insertion of RCC box done at Kurla-Trombay area, Chunabhatti, Wadala Road, Vidyavihar-LTT area and Tilak Nagar.

5)Trimming of Trees-

Work of cutting and trimming of 43 trees has been done and work is in progress of 23 trees.

6)Muck removal-

Central Railway has set a target of cleaning and removal of 62,000 cubic meters of muck o­n Main lines.

7)Lifting of tracks-

47.8 km track lifting planned, it will be completed till next month.

     8) Works done in Ghat Section-

         -45 meters of Tunnel Portal

         -300 mts of Rockfall Barrier

         -500 sq mts of Boulder Netting

         -40 mts of Canadian Fencing

         -160 mts of Stabilization of banks

         -tunnel sounding- 18 locations

9)Separate pumps will be provided for RUBs- at 14 locations.

10)Reserve boulders and stone dust kept ready in case of unusuals- 7300 cubic meter boulders and 3500 cubic meter sand dust/gravel will be kept ready as reserve.

11)Other Important works in progress-

·Pre-monsoon water proof cable meggering- almost 83% work completed, balance will be completed in 1 week.

·Provision of CCTVs and telephones at 31 Static Watchman Hut in ghat sections.

·Waterproof point motor machines provided at- 277 locations.

·AWS (Auxillary warning system) magnets sealing work for 1506 locations will be completed in this month.

·Installation of flood gates at Masjid, Byculla, Matunga and Sion-Kurla areas.

·Bunter Bhavan nallah at LTT to be connected by removing encroachments.

·Karve nagar nallah improvement work to be done by MCGM and cost to be recovered from Ajmera builders.

·Appointment of consultant for work of clearing of concrete deposited below water mains at Priyadarshini, Chunabhatti.

12)OHE- overhead wire- thermographic checking completed at 1239 track KMs. Thermo vision camera checking of conductor and other parts of OHE is completed.

13)24X7 Control Room- CR Control office, working round the clock, will keep close liaison with Meteorological Department, Disaster Management cell and staff deputed at flood prone areas for continuous monitoring and constant updates.

14)Hourly monitoring- of rainfall and water level above track is taken by control office from field staff during monsoon period.

15)Close coordination with state govt, BMC, TMC, NMMC- Regular meetings conducted between railways and state officials, till now 4 meetings done with municipal commissioner/AMC/Chief engineer. A hotline also created between railways and MCGM disaster cell, TMC, NMMC.

--- --- ---

Date: May 23, 2023

PR No. 2023/05/23

This press release is issued by the Public Relations Department, Central Railway, Chhatrapati Shivaji Maharaj Terminus Mumbai



(Shivraj Manaspure)
Chief Public Relations Officer





COMMENTS

NO Comments. Be the first to Comment...

Add Comment






Submit