For a Proper experience on Trainspy.com, enable JavaScript in your browser

Train Search








5 Trains from (SHU)SHOLINGHUR to (BQI)BOMMIDI


Address: Tamil Nadu 632501, India

Station Code: SHU

Station Name: SHOLINGHUR

Zone: SR/Southern

Train Frequency Weekly: 151

Station Traffic: High

Address: Bommudi Pappiredipatti Road, Bommidi, Tamil Nadu 635301, India

Station Code: BQI

Station Name: BOMMIDI

Zone: SR/Southern

Train Frequency Weekly: 101

Station Traffic: Medium





Trains
To Check Ticket Availibility Click Classes
TrainTrain NameFromDepToArrTimeDaysClassesStatus
22649YERCAUD EXPRESSSHU00:10BDY03:393:29M,TU,W,TH,F,SA,SU1A,2A,3A,SL,GN,22649 Status
13351DHN ALAPPUZHA EMCN03:50BQI07:193:29M,TU,W,TH,F,SA,SU2A,3A,SL,GN,13351 Status
18189TATA ALLP EXPMCN03:50BQI07:193:29M,TU,W,TH,F,SA,SU2A,3A,SL,GN,18189 Status
66019AJJ SA MEMUSHU05:05DSPT10:095:04M,TU,W,TH,F,SUUNRESERVED66019 Status
22637WEST COAST EXPWJR13:35BQI16:242:49M,TU,W,TH,F,SA,SU2A,3A,SL,GN,22637 Status
Train Type Train Table Info
SuperFast
Click On Function
Headers Sort-
Background Colour Code
Train No Detail Information About Train on new tab
Train Name Route Time Table & Fare of Train 
From & To Detail Information About Station on new tab
Classes Ticket Availibility
Mail/Express
Rajdhani
Shatabdi
Janshatabdi
Garibrath/Yuva
Duronto
Spl Tourism Trains






RECENT NEWS

1
445/2022-2310-11-2022
Chennai
Revision in timings of train services

Consequent to introduction of Train Nos. 20607/20608 Dr MGR Chennai Central – Mysuru – Dr MGR ChennaiCentralVande Bharat Express trains, the timings of the following Mail/Express trains have been revised as detailed below:

1.Train No.22626 KSR Bengaluru – Dr MGR Chennai Central AC Double Decker Daily Express with effect from 12.11.2022 at the following stations:

Station

↓

Timings

Jolarpettai

(a/d)

17.08/17.10

Vaniyampadi

(a/d)

17.23/17.25

Ambur

(a/d)

17.38/17.40

Katpadi

(a/d)

18.23/18.25

Arakkonam

(a/d)

19.13/19.15

Perambur

(a/d)

20.03/20.05

Dr MGR Chennai Central

(a)

20.35

* There is no revision in the arrival/departure timings of the train at other stations.

2.Train No.12640 KSR Bengaluru – Dr MGR Chennai Central Brindavan Daily Express with effect 12.11.2022

Station

↓

Timings

KSR Bengaluru

(d)

15.10

Bengaluru Cantonment

(a/d)

15.20/15.22

Krishnarajapuram

(a/d)

15.32/15.34

Bengarapet

(a/d)

16.14/16.15

Kuppam

(a/d)

16.43/16.44

Jolarpettai

(a/d)

17.28/17.30

Vaniyambadi

(a/d)

17.43/17.45

Ambur

(a/d)

17.58/18.00

Katpadi

(a/d)

18.43/18.45

Walajah Road

(a/d)

19.03/19.05

Sholinghur

(a/d)

19.18/19.20

Arakkonam

(a/d)

19.43/19.45

Perambur

(a/d)

20.33/20.35

Dr MGR Chennai Central

(a)

21.10

The arrival/departure timings of the following train services (passing via Jolarpettai/Katpadi/Arakkonam/Perambur) will be revised at the below mentioned stoppages effective from the dates mentioned below:

Sl.No.

Train No.

Station

Timings

With Effect from

1.

Train No. 12509 SMVT Bengaluru – Guwahati Express

Arakkonam

04.28/04.30

16.11.2022

2.

Train No.12515 Coimbatore – Silchar Express

Arakkonam

04.28/04.30

13.11.2022

3.

Train No. 17651 Chengalpattu – Kacheguda Express

Arakkonam

18.08/18.10

12.11.2022

4.

Train No.16111 Tirupati – Puducherry MEMU Express

Chengalpattu

09.20/09.25

12.11.2022

Maduranthakam

09.44/09.45

12.11.2022

Melmaruvathur

09.54/09.55

12.11.2022

Olakur

10.09/10.10

12.11.2022

Tindivanam

10.24/10.25

12.11.2022

Mailam

2

336/2022-23 22-09-2022
Chennai
General Manager of Southern Railway conducts annual Inspection of Jolarpettai – Erode section in Salem Division

General Manager of Southern Railway conducts annual Inspection of

Jolarpettai – Erode section in Salem Division


Shri B. G. Mallya, General Manager, Southern Railway conducted the statutory annual inspection of Jolarpettai -  Erode Section in Salem Division today,  21st  September,  2022.  Shri A. G. Srinivas, Divisional Railway Manager of Salem Division, Principal Heads of Departments, Officers and Senior Supervisors from HQRS and Salem Division accompanied the General Manager during the annual inspection.


The inspection started from Tirupattur station where General Manager inspected station working and surrounding area. At Tiruppattur Railway Station, a new advertisement branding of Locomotive was unveiled as part of product promotion in the division. Loco Branding has become a popular mode of Advertisement in Indian Railways in recent times.


During the inspection, a speed trial was conducted between Tirupattur - Morappur stations (48 km stretch). The inspection special clocked a speed of 121 kmph which was a testimony to the good condition of track, signaling and other parameters.


On the way to Salem Shri B. G. Mallya inspected Morappur, Bommidi, Lokkur stations. He inspected a lift, the newly developed garden Junior Engineer/Permanent Way offices, Gang Rest Rooms, newly erected Solar Panels, Inspection of Level crossing gates, Traction substations, Rain water harvesting etc. He inspected the various engineering works undertaken in the section for strengthening of tracks and appreciated the efforts of the various departments especially the technical staffs for their meritorious work. Moving further, General Manager and Officers team inspected a major bridge No.206 at Km 308/30-32 and minor bridges, curves and points in the section. He also interacted with the Gang Staffs and enquired about their welfare and solicited their cooperation in safe running of trains.


On reaching Salem Station, a thorough inspection of various passenger amenities, Crew lobby, running rooms, inauguration of Automatic Ticket Vending Machine (ATVM) and Electronic Leak Detection testing/training centre. Various Utilities such as BMI Kiosk, Station App, and Gang rest room, New Senior Sectional Engineer/Permanent Way office etc were commissioned during the inspection.


He also visited the Salem Railway colony and Annex building at Salem Divisional office and inspected the works review module developed by the Accounts department. Later General Manager also released Booklets o­n Operating, Accounts, Personnel and Safety posters.


Later during the day, Shri B. G. Mallya along with the team of officers conducted a speed trial from Salem to Sankaridurg (38 km stretch) and o­n his way to Erode inspected the major o­ngoing track renewal works in the section. He inspected the major bridge No.322 at Km 376/22-24 and minor bridges, LC gates, in the Anangur- Kaveri - Erode Stretch.


After reaching Erode station General Manager inspected the Railway Hospital, dedicated/inaugurated new facilities and interacted with the Doctors and Paramedical staffs.  A working model of Centre Buffer Coupling and Failure Indication and Brake Application system and its application in LHB coaches were commissioned at Multi Disciplinary Divisional Training Institute, Erode.  He visited Diesel loco shed, electric loco shed at Erode and its various capabilities and commmissioned newly inducted machineries in the shed.


Shri B. G. Mallya also interacted with Elected representatives, Passenger Associations, Commuters and Press and Media at various railway stations enroute and received their representations.


General Manager appreciated the works done by various departments, staffs and gave cash awards to outstanding employees for their dedicated and sincere service during the inspection.

         

Follow us

www.sr.indianrailways.gov.in

https://twitter.com/GMSRailway

https://www.facebook.com/Southern-Railway-240606622749869/



(D. Om Prakash Narayan)
Sr.PRO





COMMENTS

NO Comments. Be the first to Comment...

Add Comment






Submit