For a Proper experience on Trainspy.com, enable JavaScript in your browser

Train Search








74 Trains from (SAV)SAVDA to (TNA)THANE


Address: Savda Railway Station, Maharashtra 425502, India

Station Code: SAV

Station Name: SAVDA

Zone: CR/Central

Train Frequency Weekly: 37

Station Traffic: Low

Address: Thane Junction, Station Road, Kopri, Thane East, Thane, Maharashtra 400601, India

Station Code: TNA

Station Name: THANE

Zone: CR/Central

Train Frequency Weekly: 648

Station Traffic: High





Trains
To Check Ticket Availibility Click Classes
TrainTrain NameFromDepToArrTimeDaysClassesStatus
12154HBJ LTT SUP EXPBSL00:15TNA06:476:32F2A,3A,SL,GN,12154 Status
11025BSL PUNE EXPBSL00:25KYN07:577:32M,TU,W,TH,F,SA,SUCC,SL,2S,GN,11025 Status
12618MNGLA LKSDP EXPBSL02:05KYN08:326:27M,TU,W,TH,F,SA,SU2A,3A,SL,GN,12618 Status
13201RJPB LTT EXPBSL02:35TNA10:478:12M,TU,W,TH,F,SA,SU2A,3A,SL,GN,13201 Status
12321HWH MUMBAI MAILBSL03:00KYN10:127:12M,TU,W,TH,F,SA,SU1A,2A,3A,SL,GN,12321 Status
12140SEVAGRAM EXPBSL03:50TNA10:436:53M,TU,W,TH,F,SA,SU2A,3A,SL,GN,12140 Status
51196BPQ WR PASSBSL03:50TNA10:436:53M,TU,W,TH,F,SA,SU3A,SL,GN,51196 Status
12187MUMBAI GARIBRATHBSL04:20KYN10:576:37M,W,SA3A12187 Status
18609RNC LTT EXPRESSBSL04:20KYN10:576:37W2A,3A,SL,GN,18609 Status
12168MUV LTT SUP EXPBSL04:55KYN11:226:27M,TU,W,TH,F,SA,SU1A,2A,3A,SL,GN,12168 Status
12597GKP CSTM JANSADHARANBSL05:15KYN10:575:42TUUNRESERVED12597 Status
11054AMH LTT EXPBSL05:15TNA11:286:13F2A,3A,SL,GN,11054 Status
22110NZM LTT AC EXPBSL05:25KYN10:465:21W1A,2A,3A,22110 Status
22128ANANDWAN EXPBSL05:40TNA13:037:23TU2A,3A,SL,GN,22128 Status
22866PURI LTT SF EXPBSL05:50TNA12:476:57TU1A,2A,3A,SL,GN,22866 Status
12812HTE LTT SUPERBSL05:50KYN12:226:32F,SA2A,3A,SL,GN,12812 Status
22847VSKP LTT EXPRESSBSL05:50KYN12:226:32SU2A,3A,SL,GN,22847 Status
12880BBS LTT SF EXPBSL05:50TNA12:476:57M,TH2A,3A,SL,GN,12880 Status
11094MAHANAGARI EXPBSL06:15TNA13:177:02M,TU,W,TH,F,SA,SU2A,3A,SL,GN,11094 Status
51154BSL CSTM PASSBSL07:05TNA18:1311:08M,TU,W,TH,F,SA,SUUNRESERVED51154 Status
12142PPTA LTT EXPBSL07:40KYN14:126:32M,TU,W,TH,F,SA,SU1A,2A,3A,SL,GN,12142 Status
11056GODAN EXPRESSBSL08:10TNA15:327:22TU,W,F,SU2A,3A,SL,GN,11056 Status
11060CPR LTT EXPRESSBSL08:10TNA15:327:22M,TH,SA2A,3A,SL,GN,11060 Status
15063GKP LTT EXPBSL08:35TNA15:276:52M2A,3A,SL,GN,15063 Status
11080GKP LTT EXPRESSBSL08:35KYN15:026:27SA2A,3A,SL,GN,11080 Status
15067GKP BDTS EXPBSL08:35BVI18:269:51W2A,3A,SL,GN,15067 Status
15065GKP PNVL EXPBSL08:35KYN15:026:27TU,TH,F,SU2A,3A,SL,GN,15065 Status
59076BSL ST BCT PASSBSL08:45BVI03:2318:38M,TU,W,TH,F,SA,SUSL,GN,59076 Status
12294ALD LTT DURONTOBSL09:00LTT14:555:55TU,SA1A,2A,3A,12294 Status
15018GKP LTT EXPBSL10:20TNA17:277:07M,TU,W,TH,F,SA,SU2A,3A,SL,GN,15018 Status
12520KYQ LTT AC EXPBSL10:30TNA16:426:12TH1A,2A,3A,12520 Status
22122LKO LTT AC EXPBSL10:30TNA16:426:12SU1A,2A,3A,22122 Status
14314BE LTT EXPRESSBSL11:55TNA19:227:27SA2A,3A,SL,GN,14314 Status
12335BGP LTT EXPRESSBSL11:55TNA19:227:27TU,F,SU2A,3A,SL,GN,12335 Status
15648GHY LTT EXPRESSBSL11:55TNA19:227:27TU2A,3A,SL,GN,15648 Status
15646GHY LTT EXPBSL11:55TNA19:227:27W,SU2A,3A,SL,GN,15646 Status
12533PUSHPAK EXPBSL12:20KYN18:256:05M,TU,W,TH,F,SA,SU1A,2A,3A,SL,GN,12533 Status
12860GITANJALI EXPBSL13:20KYN20:086:48M,TU,W,TH,F,SA,SU2A,3A,SL,GN,12860 Status
21068SAKET LINK EXPBSL13:35TNA20:477:12TH,SU3A,SL,GN,21068 Status
12742PNBE VSG EXPRESBSL13:35KYN20:577:22SA2A,3A,SL,GN,12742 Status
11068SAKET EXPRESSBSL13:35TNA20:477:12TH,SU2A,3A,SL,GN,11068 Status
22130TULSI EXPRESSBSL13:45TNA20:477:02M,W2A,3A,SL,GN,22130 Status
12166BSB LTT SUP EXPBSL13:45TNA20:477:02TU,F,SA2A,3A,SL,GN,12166 Status
12870HWH CSMT EXPRESBSL14:25KYN22:027:37F2A,3A,SL,GN,12870 Status
22512KARMABHOOMI EXPBSL14:25KYN22:027:37SA2A,3A,SL,GN,22512 Status
11072KAMAYANI EXPRESBSL14:45TNA22:107:25M,TU,W,TH,F,SA,SU2A,3A,SL,GN,11072 Status
11082GKP LTT EXPBSL14:50KYN21:517:01F2A,3A,SL,GN,11082 Status
12108LJN LTT EXPRESSSBSL14:50TNA22:207:30TU,TH,SU2A,3A,SL,GN,12108 Status
12162LASHKAR EXPRESSBSL14:50TNA22:207:30SA2A,3A,SL,GN,12162 Status
20822HUMSAFAR EXPBSL16:40KYN22:406:00SA3A20822 Status
22886ANTYODAYA EXPBSL16:40LTT23:457:05TH,SUUNRESERVED22886 Status
12172HW LTT AC SFBSL16:45KYN22:476:02TU,F1A,2A,3A,12172 Status
19004KHANDESH EXPBSL17:40BVI04:2210:42TU,TH,SU2A,3A,SL,GN,19004 Status
11058ASR CSTM EXPBSL18:55TNA03:028:07M,TU,W,TH,F,SA,SU2A,3A,SL,GN,11058 Status
11062DBG LTT EXPRESSBSL19:00TNA02:527:52M,TU,W,TH,F,SA,SU2A,3A,SL,GN,11062 Status
11016KUSHINAGAR EXPBSL19:20TNA03:328:12M,TU,W,TH,F,SA,SU2A,3A,SL,GN,11016 Status
22972PNBE BDTS SF EXPBSL19:30BVI06:5411:24W2A,3A,SL,GN,22972 Status
12541GKP LTT SUP EXPBSL19:55LTT04:008:05M,TU,W,TH,F,SA,SU2A,3A,SL,GN,12541 Status
12144SLN LTT SFBSL20:25LTT04:107:45M2A,3A,SL,GN,12144 Status
18030SHM LTT EXPRESSBSL20:45TNA04:087:23M,TU,W,TH,F,SA,SU2A,3A,SL,GN,18030 Status
12810HWH MUMBAI MAILBSL21:15KYN04:076:52M,TU,W,TH,F,SA,SU1A,2A,3A,SL,GN,12810 Status
22104FD LTT SF EXPBSL21:40KYN03:275:47TU1A,2A,3A,SL,GN,22104 Status
12102JNANESWARISUPDLXBSL22:00KYN04:506:50M,W,TH,SU1A,2A,3A,SL,GN,12102 Status
15267JANSADHARAN EXPBSL22:30KYN05:006:30SAUNRESERVED15267 Status
15547JYG LTT JANSADHARAN EXPBSL22:30KYN06:277:57MUNRESERVED15547 Status
12545KARMABHUMI EXPBSL22:30KYN05:006:30THUNRESERVED12545 Status
12112AMI CSMT EXPRESSBSL22:50TNA05:436:53M,TU,W,TH,F,SA,SU1A,2A,3A,SL,GN,12112 Status
15101JANSADHARAN EXPBSL22:55KYN05:006:05TUUNRESERVED15101 Status
12174UDYOG NAGRI EXPBSL22:55TNA05:236:28TU,TH2A,3A,SL,GN,12174 Status
12106VIDARBHA EXPRESBSL23:15TNA06:026:47M,TU,W,TH,F,SA,SU1A,2A,3A,SL,GN,12106 Status
12361ASN CSTM EXPRESSBSL23:34KYN05:065:32SU2A,3A,SL,GN,12361 Status
12138PUNJAB MAILBSL23:35KYN06:206:45M,TU,W,TH,F,SA,SU1A,2A,3A,SL,GN,12138 Status
12146PURI LTT SUP EXPBSL23:50KYN06:276:37TU1A,2A,3A,SL,GN,12146 Status
12152SAMARSATA EXPBSL23:50KYN06:276:37F,SA1A,2A,3A,SL,GN,12152 Status
Train Type Train Table Info
SuperFast
Click On Function
Headers Sort-
Background Colour Code
Train No Detail Information About Train on new tab
Train Name Route Time Table & Fare of Train 
From & To Detail Information About Station on new tab
Classes Ticket Availibility
Mail/Express
Rajdhani
Shatabdi
Janshatabdi
Garibrath/Yuva
Duronto
Spl Tourism Trains






RECENT NEWS

1
2023/05/2525-05-2023
Annual Conference of Operations department of Central Railway conducted today 24/05/23



Annual Conference of Operations department of Central Railway conducted today 24/05/23

Shri Naresh Lalwani, General Manager, Central Railway addressed the Senior Divisional Operations Manager’s Annual Conference at Mumbai HQ o­n 24.5.2023.

Shri Alok Singh, Additional General Manager and Shri Mukul Jain, Principal Chief Operations Manager, Central Railway were also present. The conference was attended by Heads of Coaching section, Planning section and Goods section of Operations Department of Central Railway and Operations Department Heads of Mumbai, Bhusawal, Nagpur, Pune and Solapur Divisions.

The targets and achievements of upcoming year 2023-24 have been discussed in conference as follows-

1) Goods loading-

In year 2021-22- 76.16 million tonne (MT) goods loading achieved by CR.

In year 2022-23- 81.88 million tonne goods loading achieved by CR.

In year 2023-24- 90.05 million tonne target of goods loading has been set by CR.

2) Coal loading -

Out of above total loading, coal is highest commodity loading.

In 2021-22- 39.52 MT loading done.

In 22-23- 37.17 MT loading done.

In 23-24- target of 40.95 MT coal loading has been set.

3) Cement loading-

In 22-23- 7.48 MT loading achieved.

In 23-24- target of 8.8 MT is set.

Major plants of Cement loading are- ACC/Wadi/Solapur, ACC/Ghuggus/Nagpur, Ultratech cement/Hotgi/Solapur, Orient cement/Bhadli/Bhusawal.

4) New infrastructures lines completed-

-Bhusawal-Jalgaon new 3rd line & 4th line of 24.13 km completed in year 2022-23.

-Jalgaon-Pachora new 3rd line of 47.59 km completed in year 2022-23.

5) New infrastructure lines under progress-

-Nagpur-Wardha 3rd& 4th line

-Bhusawal-khandwa 3rd & 4th line

-3rd line in Nagpur-Etarasi, Bhusawal-Wardha, Jalgaon-Manmad.

6) Parcel loading hubs-

Bhiwandi, Jalgaon, Ajni/Nagpur have been developed as major parcel loading points.

In 2022-23- 312 parcel train loaded with 764759 tonnage and 45.86 Crores revenue earning.

7) Improvement of goods sheds under progress-

It will be completed in this 2023-24 year. Circulating area, lighting, approach road, labour room, merchant room etc will be renewed.

-Mumbai division- Kalamboli

-Bhusawal division- Kasbe Sukane, Borgaon, Khamgaon, Savda, Burhanpur, Nandgaon

-Nagpur- Tadali, Ballarshah, Kalmeshwar, maramjhiri.

-Pune- Nira, Loni,

-Solapur- Vilad, Ahmednagar, Belapur, Daund, Arag.

8) Daily goods train interchange-

In 2021-22- 317 goods trains taken over/handed over daily by CR with other railway zones.

In 22-23- 336 goods train interchange daily by CR. It's 18.4% increase capacity handling.

9) Infrastructural works completed to increase mail express and goods train mobility-

-Electrification completed at Roha yard, Gurumarket yard/Pune div, Solapur yard, Barshi yard/Solapur yard, Bale yard/solapur div.

-OHE Overhead wire new substations completed at- Karad/Pune div, Ausa/Solapur div, Gaudgaon/Solapur div, Nagothane/Mumbai div.

10) Critical bottleneck infrastructure works completed in year 2022-23-

-Daund- Gulbarga doubling

-Wardha- Chitoda 2nd cord line

-Khapri-Nagpur-Godhani- 20 km automatic signalling system.

-Kamshet/pune div- loop lines extention.

--- --- ---

Date: May 24, 2023

PR No.2023/05/25

This press release is issued by the Public Relations Department, Central Railway, Chhatrapati Shivaji Maharaj Terminus Mumbai.



(Shivraj Manaspure)
Chief Public Relations Officer




2
2023/05/2323-05-2023
General Manager reviews monsoon preparations - Central Railway gears up with monsoon preparations


General Manager reviews monsoon preparations

Central Railway gears up with monsoon preparations

Shri Naresh Lalwani, General Manager, Central Railway reviewed the monsoon preparations of Central Railway. Shri Alok Singh, Additional General Manager, Central Railway, Shri Rajnish Kumar Goyal, Divisional Railway Manager, Mumbai Division and Principal Head of Departments of civil engg, electrical, signalling  were also present.

The details of measures taken for ensuring uninterrupted services are as under-

1)More Water Pumps

24 vulnerable locations identified. 166 pumps will be provided at these locations. Railways will be providing 120 High Power pumps, 15 Normal pumps and Municipal Corporation of Greater Mumbai will be providing the balance 31 pumps. This year the capacity of pumps and nos. of pumps have been increased between 12.5 HP to 100 HP.  The locations identified o­n main line are Masjid, Mazgaon yard, Byculla, Chinchpokli, Currey Road, Parel, Dadar, Matunga, Sion, Kurla, Vikhroli, Kanjurmarg, Bhandup, Mulund and o­n Harbour line are Sewri, Vadala, Guru Tegh Bahadur Nagar, Chunabhatti, Tilak Nagar etc.

2)Micro tunnelling-

Micro tunnelling has been provided at 8 locations such as Masjid, Sandhurst Road, Dadar-Parel area, Matunga-Sion area, Kurla Car Shed, Tilak Nagar nallah, Diva and Kalva. Micro tunneling work is in progress at 2 new locations in Thane-Kalva and Kalva-Mumbra section.

3)Desilting of drains-

Central Railway has targeted de-silting and cleaning of 118.48 kms of drains o­n its suburban section of which, work has been completed for 102.39 kms and work is presently in progress o­n cleaning of another 16 kms of drains.

4)Cleaning of culverts-

CR has cleaned 88 culverts o­n its suburban sections, and work is presently in progress o­n cleaning of 17 more culverts. Culvert Augmentation work by insertion of RCC box done at Kurla-Trombay area, Chunabhatti, Wadala Road, Vidyavihar-LTT area and Tilak Nagar.

5)Trimming of Trees-

Work of cutting and trimming of 43 trees has been done and work is in progress of 23 trees.

6)Muck removal-

Central Railway has set a target of cleaning and removal of 62,000 cubic meters of muck o­n Main lines.

7)Lifting of tracks-

47.8 km track lifting planned, it will be completed till next month.

     8) Works done in Ghat Section-

         -45 meters of Tunnel Portal

         -300 mts of Rockfall Barrier

         -500 sq mts of Boulder Netting

         -40 mts of Canadian Fencing

         -160 mts of Stabilization of banks

         -tunnel sounding- 18 locations

9)Separate pumps will be provided for RUBs- at 14 locations.

10)Reserve boulders and stone dust kept ready in case of unusuals- 7300 cubic meter boulders and 3500 cubic meter sand dust/gravel will be kept ready as reserve.

11)Other Important works in progress-

·Pre-monsoon water proof cable meggering- almost 83% work completed, balance will be completed in 1 week.

·Provision of CCTVs and telephones at 31 Static Watchman Hut in ghat sections.

·Waterproof point motor machines provided at- 277 locations.

·AWS (Auxillary warning system) magnets sealing work for 1506 locations will be completed in this month.

·Installation of flood gates at Masjid, Byculla, Matunga and Sion-Kurla areas.

·Bunter Bhavan nallah at LTT to be connected by removing encroachments.

·Karve nagar nallah improvement work to be done by MCGM and cost to be recovered from Ajmera builders.

·Appointment of consultant for work of clearing of concrete deposited below water mains at Priyadarshini, Chunabhatti.

12)OHE- overhead wire- thermographic checking completed at 1239 track KMs. Thermo vision camera checking of conductor and other parts of OHE is completed.

13)24X7 Control Room- CR Control office, working round the clock, will keep close liaison with Meteorological Department, Disaster Management cell and staff deputed at flood prone areas for continuous monitoring and constant updates.

14)Hourly monitoring- of rainfall and water level above track is taken by control office from field staff during monsoon period.

15)Close coordination with state govt, BMC, TMC, NMMC- Regular meetings conducted between railways and state officials, till now 4 meetings done with municipal commissioner/AMC/Chief engineer. A hotline also created between railways and MCGM disaster cell, TMC, NMMC.

--- --- ---

Date: May 23, 2023

PR No. 2023/05/23

This press release is issued by the Public Relations Department, Central Railway, Chhatrapati Shivaji Maharaj Terminus Mumbai



(Shivraj Manaspure)
Chief Public Relations Officer





COMMENTS

NO Comments. Be the first to Comment...

Add Comment






Submit