For a Proper experience on Trainspy.com, enable JavaScript in your browser

Train Search








10 Trains from (RBG)RAYBAG to (DWR)DHARWAR


Address: Karnataka 591317, India

Station Code: RBG

Station Name: RAYBAG

Zone: SWR/South Western

Train Frequency Weekly: 121

Station Traffic: Medium

Address: Dharwad Railway Station, Hubli, Karnataka, India

Station Code: DWR

Station Name: DHARWAR

Zone: SWR/South Western

Train Frequency Weekly: 227

Station Traffic: High





Trains
To Check Ticket Availibility Click Classes
TrainTrain NameFromDepToArrTimeDaysClassesStatus
11047MIRAJ UBL EXPCNC00:56DWR05:384:42M,TU,W,TH,F,SA,SUSL,GN,11047 Status
17318LTT HUBLI EXPKUD06:00DWR10:204:20M,TU,W,TH,F,SA,SU2A,3A,SL,GN,17318 Status
11005PUDUCHERRY EXPKUD07:15DWR11:254:10M,F,SU2A,3A,SL,GN,11005 Status
11021TIRUNELVELI EXPKUD07:15DWR11:254:10TU,W,SA2A,3A,SL,GN,11021 Status
11035SHARAVATHI EXPKUD07:15DWR11:254:10TH2A,3A,SL,GN,11035 Status
51419MRJ UBL PASSBGWD08:53DWR13:535:00M,TU,W,TH,F,SA,SUUNRESERVED51419 Status
11304KOP MUGR EXPRESSKUD09:32DWR14:435:11M,TU,W,TH,F,SA,SU2A,3A,SL,GN,11304 Status
17416HARIPRIYA EXPKUD13:55DWR18:204:25M,TU,W,TH,F,SA,SU1A,2A,3A,SL,GN,17416 Status
16590RANICHENNAMA EXCKR16:40DWR21:435:03M,TU,W,TH,F,SA,SU1A,2A,3A,SL,GN,16590 Status
12780GOA EXPRESSRBG23:15DWR05:236:08M,TU,W,TH,F,SA,SU2A,3A,SL,GN,12780 Status
Train Type Train Table Info
SuperFast
Click On Function
Headers Sort-
Background Colour Code
Train No Detail Information About Train on new tab
Train Name Route Time Table & Fare of Train 
From & To Detail Information About Station on new tab
Classes Ticket Availibility
Mail/Express
Rajdhani
Shatabdi
Janshatabdi
Garibrath/Yuva
Duronto
Spl Tourism Trains






RECENT NEWS

1
751/2021-22 04-03-2022
Chennai
WEEKLY EXPRESS TRAIN BETWEEN NAGAPATTINAM AND VASCO DA GAMA


South Western Railway has notified the running of a Weekly Train, No.17315/17316, between Vasco Da Gama and Nagapattinam as detailed below:-

Train No. 17315 Vasco Da Gama – Nagapattinam Weekly Express will leave Vasco Da Gama at 09.00 hrs o­n Mondays and reach Nagapattinam at 11.40 hrs o­n Tuesdays, starting from 7th March 2022.

In the return direction, Train No. 17316 Nagapattinam – Vasco Da Gama Weekly Express will leave Nagapattinam at  00.20 hrs o­n Wednesdays and reach Vasco Da Gama at 03.25 hrs o­n Thursdays, starting from 9th March 2022.

Both the above train services, Train Nos. 17315 / 17316 Vasco Da Gama – Nagapattinam – Vasco Da Gama presently operated up to Nagapattinam, will be extended to Velankanni. The date of extension upto  Velankanni will be notified later.

Coach Composition: One AC Two Tier Coach, Four AC Three Tier Coaches, Seven Sleeper Class Coaches, Four General Second Class Coaches & Two Luggage cum brake Vans

The details of timings and stoppages of  Train No. No.17315 / 17316 Vasco Da Gama – Velankanni – Vasco Da Gama  Weekly Express trains are as follows: (Timings in hours)

17315 Vasco Da Gama – Nagapattinam Weekly Express

↓

Station

↑

Train No. 17316 Nagapattinam – Vaso Da Gama Weekly Express

09.00 (Dep)

(d)

Vasco Da Gama

(a)

     03.25 (Arr)

09.30 /09.35

(a/d)

Madgaon

(a/d)

02.15 / 02.20

09.49 /09.50

(a/d)

Sanverdam Church

(a/d)

01.20 /01.21

10.15 / 10.20

(a/d)

Kulem

(a/d)

00.55 /01.00

11.30 / 11.35

(a/d)

Castle Rock

(a/d)

22.50 /22.55

12.10 / 12.12

(a/d)

Londa

(a/d)

22.13 /22.15

13.38 /13.40

(a/d)

Dharwar

(a/d)

20.34 / 20.36

14.20 / 14.30

(a/d)

Hubballi

(a/d)

20.00 /20.10

15.58 /16.00

(a/d)

Haveri

(a/d)

17.53 /17.55

16.29 /16.30

(a/d)

Ranibennur

(a/d)

17.20 /17.22

17.03 /17.05

(a/d)

Davangere

(a/d)

16.43/16.45

18.30 /18.32

(a/d)

Birur

(a/d)

15.20 /15.22

19.20 /19.25

(a/d)

Arsikere

(a/d)

14.35 /14.40

19.46 / 19.48

(a/d)

Tiptur

(a/d)

14.13 / 14.15

20.50 / 20.52

(a/d)

Tumakuru

(a/d)

13.18 /13.20

21.35 /21.37

(a/d)

Chik Banavar

(a/d)

12.30 / 12.32

23.11 / 23.12

(a/d)

Banaswadi

(a/d)

11.57 /11.58

23.51/ 23.53

(a/d)

Krishnarajapuram

(a/d)

11.30 / 11.32

00.38 / 00.40

(a/d)

Bangarapet

(a/d)

10.33 /10.35

04.02 / 04.05

(a/d)

Salem Jn

(a/d)

07.22 / 07.25

05.20 /05.30

(a/d)

Erode Jn

(a/d)

06.25 / 06.35

06.28 /06.30

(a/d)

Karur

(a/d)

04.23 / 04.25

08.10 / 08.20

(a/d)

2
Press Release No. 51424-01-2022
Hubballi
Press Release No. 514, SWR UPGRADED THE INFRASTRUCTURE UNDER THE MISSION RAFTAR

             à¤¦à¤•à¥à¤·à¤¿à¤£ à¤ªà¤¶à¥à¤šà¤¿à¤® à¤°à¥‡à¤²à¤µà¥‡ / SOUTH WESTERN RAILWAY               à¤ªà¥à¤°à¥‡à¤¸ à¤µà¤¿à¤œà¥à¤žà¤ªà¥à¤¤à¤¿ / Press Release No. 514 Dt: 24.01.2022

SWR UPGRADED THE INFRASTRUCTURE UNDER THE MISSION RAFTAR

• Sectional Speed over 317.42 Route km o­n SWR has been increased

• 32 trains speeded up during 2021-22

The “Mission Raftaar” of Indian Railways envisages improving of average speeds of passenger and freight trains. To improve average speeds of Passenger and Freight trains, Railway is working o­n many fronts including doubling.  o­ne of the thrust area being strengthening of track by undertaking various track improvement works. 

            South Western Railway has undertaken Track Renewal and Engineering Works in a big way  to improve sectional speeds, improve speeds o­n  loop lines at stations and to   eliminate permanent speed restrictions.  This is paving way for  long restriction free stretches thereby increasing the speed potential of trains.  Some of the significant achievements of SWR in the current financial year Up to December 2021 are as under :

Over 317 Route km of South Western Railway, sectional speed has been increased.  Some of the sections includeArsikere-Tumakuru, Davangere-Tolahunse, Harihar-Devargudda, Chikkaballapur-Kolar,  Yelahanka-Oddarahalli, Makalidurg-Devarapalle, Chikkodi Road-Raybag-Kudachi,  Gadag-Binkadakatti, Jumnal-Vijayapura etc. Over last three years o­n almost 2000 RKM sectional speed was raised.

In first 9 months of this financial year, Speed o­n loop lines at various stations totaling to153 Km  has been increased from 15 Kmph  up to 30 Kmph.  Loop lines speed has been increased in all the stations between Yesvantpur and Hubballi in last 3 years. Similarly Loop line speed has been increased in all the stations between Yesvantpur-Omluru, Mysuru-Arsikere, Wandal-Hotgi etc.

UptoDecember 2021, 18 permanent speed restrictions have been removed/relaxed  over South Western Railway . 

Shri  Sanjeev  Kishore, General Manager, South Western Railway appreciated the works done under the guidance of Principal Chief Engineer, Shri S.P.S. Gupta  and the Divisional Railway Managers of Hubballi, Bengaluru and Mysuru Division. 

Shri  Sanjeev  Kishore, GM/SWRsaid that as a result of progress achieved o­n account of doubling of track and above works, the mobility of trains has improved.   During 2021-22 itself, till now 32 Express/Passenger trains have been speeded up.  He said that SWR is doing all out efforts  to increase the speed by pursuing doubling works in Bengaluru-SSS Hubballi, Londa-Miraj and Gadag-Hotgi routes.  The increase in sectional speed will not o­nly  reduce travel time but also improve punctuality.  

Trains Speeded up during 2021-2022 

Sl.No

Train

From-To

Speededby

1

12649

YPR-NZM

05Minutes

2

12777

UBL-KCVL

10Minutes

3

12778

KCVL-UBL

10Minutes

4

12725

SBC-DWR

10Minutes

5

16591

UBL-MYS

10Minutes

6

16592

MYS-UBL

15Minutes

7

16590

MRJ-SBC

15Minutes

8

12089

SBC-SMET

15Minutes

9

16543

YPR-UBL

30minutes

10

16507

JU-SBC

35Minutes

11

16209

AII-MYS

35Minutes

12

16505

GIMB-SBC

35Minutes

13

12080

UBL-SBC

35Minutes

14

16589

SBC-MRJ

39Minutes

15

14805

YPR-BME

40Minutes

16

16587

YPR-BKN

40Minutes

17

14806

BME-YPR

45Minutes

18

16588

BKN-YPR

45Minutes

19

12079

SBC-UBL

45Minutes

20

16589

SBC-MRJ

50Minutes

21

17326

MYS-BGM

52Minutes

22

16544

UBL-YPR

60minutes

23

17324

BSB-UBL

60minutes

24

16546

KTGG-YPR

60Minutes

25

COMMENTS

NO Comments. Be the first to Comment...

Add Comment






Submit