For a Proper experience on Trainspy.com, enable JavaScript in your browser

Train Search








0 Trains from (RAMA)Ramva to (LKO)LUCKNOW NR


Address: Ramva Dist. Fatehpur Uttar Pradesh

Station Code: RAMA

Station Name: Ramva

Zone: NCR/North Central

Train Frequency Weekly: 13

Station Traffic: Low

Address: Lucknow Railway Station, Kanpur Road, Railway Colony, Charbagh, Lucknow, Uttar Pradesh, India

Station Code: LKO

Station Name: LUCKNOW NR

Zone: NR/Northern

Train Frequency Weekly: 860

Station Traffic: High





Trains
To Check Ticket Availibility Click Classes
Since no Direct Trains Try Nearest Via Stations
Nearest From (RAMA)Ramva
(cnb)kanpur central 80Kms from (RAMA)Ramva

Nearest From LKO
(cnb)kanpur central 72Kms from (LKO)LUCKNOW NR
Train Type Train Table Info
SuperFast
Click On Function
Headers Sort-
Background Colour Code
Train No Detail Information About Train on new tab
Train Name Route Time Table & Fare of Train 
From & To Detail Information About Station on new tab
Classes Ticket Availibility
Mail/Express
Rajdhani
Shatabdi
Janshatabdi
Garibrath/Yuva
Duronto
Spl Tourism Trains






RECENT NEWS

1
   

SOUTH CENTRAL RAILWAY
PRESS RELEASE
PUBLIC RELATIONS OFFICE, SECUNDERABAD - 500 071
No.832/2021-2204-04-2022
secunderabad
PR No. 832 - 26 Summer Special Trains between Hyderabad - Gorakhpur

  


In order to clear extra rush during summer season, South Central Railway will run 26 summer special trains between Hyderabad – Gorakhpur - Hyderabad as detailed below:

 

Sl. No

Train No

From - To

Dep.

Arrival

JCO

1

02575

Hyderabad - Gorakhpur

21.05 hrs

(Friday)

06.30 hrs

(Sunday)

1st. 8th, 15th, 22nd, 29th April, 6th, 13th, 20th, 27th May, 3rd, 10th, 17th, 24th June, 2022

2

02576

Gorakhpur - Hyderabad

08.30 hrs

(Sunday)

16.20 hrs

(Monday)

3rd. 10th, 17th, 24th April, 1st, 8th, 15th, 22nd, 29th May, 5th, 12th, 19th, 26th June, 2022

 

I.Train No. 02575/02576 Hyderabad – Gorakhpur – Hyderabad special train : (26 services)

These Special Trains will stop at Secunderabad, Kazipet, Peddapalli, Mancherial, Balharshah, Nagpur, Itarsi, Bhopal, Bina, Virangana Lakhshmibai, Orai, Pokhrayan, Kanpur,Aishbagh, Lucknow City, Barabanki Station and Gonda Railway stations in both the directions (Note: Train No.02575 will not stop at Barabanki Station) .

            These tarins consist of AC II tier, AC III tier and Sleeper class coaches





2
   

SOUTH CENTRAL RAILWAY
PRESS RELEASE
PUBLIC RELATIONS OFFICE, SECUNDERABAD - 500 071
No.369/2021-2217-08-2021
Secunderabad
SCR Commissions Double Line with Electrification between Vijayawada- Uppaluru



- This provides continuous double line with electrification connectivity for 141 kms between Vijayawada - Gudivada - Bhimavaram Town and Gudivada - Machilipatnam

South Central Railway has completed and commissioned 17 Kms of Double Line & Electric traction o­n Vijayawada - Uppaluru Double Line. The commissioning of Doubling with Electrification between these two stations (Vijayawada – Uppaluru) provides continuous double line rail connectivity, along with electrification, for a combined distance of 141 kms between Vijayawada - Gudivada - Bhimavaram Town and Gudivada – Machilipatnam.

This commissioning of double line with electrification is part of the Vijayawada – Gudivada – Bhimavaram – Narsapur, Gudivada – Machilipatnam & Narsapur – Nidadavolu Doubling and Electrification project. The project was sanctioned in the year 2011-12 for a distance of 221 Kms at an estimated cost of Rs. 3,000 Crore, and is being executed by RVNL (Rail Vikas Nigam Limited). This is a prestigious project in the coastal belt of Andhra Pradesh and boosts the development of the region. Out of the total project length of 221 Kms project, a total of 141 Kms has now been completed and commissioned. Works in the remaining sections, i.e., between Nidadavolu - Narsapur for a distance of 70 Route Kms, are progressing at a fast pace and is nearing completion.

Salient Features of the newly completed Double line with Electrification -

· Entire track is designed to handle 25 T Axle loads with a speed potential of 110 kmph,

· 2 Major bridges with PSC Girders and 18 Minor bridges have been constructed.

· Passenger amenities at all the stations viz., Uppaluru, Nidamanuru and Ramavarappadu have been strengthened with well planned circulating area, booking concourse, convenient platforms, drinking water facilities, foot over bridges etc.

· Three Station yards of Uppaluru, Nidamanuru and Ramvarappadu has been remodeled with standard double line layout with modern facilities.

· Cut and Connection method is used wherever possible and hence almost the entire line is commissioned with maximum permissible speed.

· Indigenously built Centralized Architecture Electronic Interlocking has been installed at 3 stations Uppaluru, Nidamanuru, Ramavarappadu to ensure safety at the highest level.

· Electrically operated Lifting Barriers have been installed at 7 Railway Level Crossing Gates in the section with good road surface and indication boards.

Benefits

ü This infrastructure development project will significantly strengthen Rail transport infrastructure by providing seamless movement of freight and passenger traffic o­n rails.

ü The new double rail line will increase mobility and serve public aspirations with regard to rail transportation.

ü Economy of hinterland will see leverage with boost in transport of Agriculture and Aqua products.

ü The electrification works will help in saving energy and reducing fuel expenditure besides reducing carbon foot print.

ü This line also serves as the viable alternate railway line for the coastal rail corridor between Vijayawada - Visakhapatnam.

Shri Gajanan Mallya, General Manager, SCR complimented the officials of Vijayawada Division & RVNL for completing the project works as per schedule. The General Manager advised RVNL authorities to complete the project in pro-active approach so that the entire project is completed & commissioned at the earliest, thereby fulfilling the needs of the Coastal Belt of Andhra Pradesh. He also instructed the Railway officials to extend all the possible help in execution of project at a faster pace.






COMMENTS

NO Comments. Be the first to Comment...

Add Comment






Submit