For a Proper experience on Trainspy.com, enable JavaScript in your browser

Train Search








22 Trains from (PCN)PANCH PIPILA to (MEP)MAHIDPUR ROAD


Address: 457777, India

Station Code: PCN

Station Name: PANCH PIPILA

Zone: WR/Western

Train Frequency Weekly: 61

Station Traffic: Medium

Address: Mandawal - Kharwa Kala Road, Madhya Pradesh, India

Station Code: MEP

Station Name: MAHIDPUR ROAD

Zone: WCR/West Central

Train Frequency Weekly: 95

Station Traffic: Medium





Trains
To Check Ticket Availibility Click Classes
TrainTrain NameFromDepToArrTimeDaysClassesStatus
11465SMNH JBP EXPRESMGN00:19NAD02:322:13M,SA1A,2A,3A,SL,GN,11465 Status
11463SMNH JBP EXPRESMGN00:19NAD02:322:13TU,W,TH,F,SU1A,2A,3A,SL,GN,11463 Status
19309GNC INDORE EXPMGN00:41NAD02:582:17M,TU,W,TH,F,SA,SU1A,2A,3A,SL,GN,19309 Status
12979JAIPUR SUP FASTMGN01:14NAD03:532:39TU,TH,SA1A,2A,3A,SL,GN,12979 Status
19167SABARMATI EXPMGN01:59NAD04:082:09M,TU,TH,SA2A,3A,SL,GN,19167 Status
19165SABARMATI EXPMGN01:59NAD04:082:09W,F,SU2A,3A,SL,GN,19165 Status
12955MMCT JP SF EXPMGN03:07NAD05:362:29M,TU,W,TH,F,SA,SU1A,2A,3A,SL,GN,12955 Status
22943PUNE INDORE EXPMGN03:35NAD05:502:15M,TU,TH,F,SA2A,3A,SL,GN,22943 Status
12961AVANTIKA EXPMGN04:00NAD06:222:22M,TU,W,TH,F,SA,SU1A,2A,3A,SL,GN,12961 Status
12903GOLDENTEMPLE MLMGN05:45NAD08:082:23M,TU,W,TH,F,SA,SU1A,2A,3A,SL,GN,12903 Status
19311PUNE INDORE EXPMGN06:06NAD08:452:39W,SU2A,3A,SL,GN,19311 Status
59393DHD HBJ FAST PASPCN06:56BTSD09:462:50M,TU,W,TH,F,SA,SUCC,2S,GN,59393 Status
19037AVADH EXPRESSMGN08:19NAD10:502:31TU,W,F,SU2A,3A,SL,GN,19037 Status
19039AVADH EXPRESSMGN08:19NAD10:502:31M,TH,SA2A,3A,SL,GN,19039 Status
19019DEHRADUN EXPPCN10:52LNR14:413:49M,TU,W,TH,F,SA,SU2A,3A,SL,GN,19019 Status
59831BRC KOTA PASSPCN12:37LNR16:474:10M,TU,W,TH,F,SA,SUUNRESERVED59831 Status
12477JAM SVDK EXPMGN16:25NAD18:582:33TU2A,3A,SL,GN,12477 Status
12475HAPA SVDK EXPMGN16:25NAD18:582:33W2A,3A,SL,GN,12475 Status
12473SARVODAYA EXPMGN16:25NAD18:582:33SA2A,3A,SL,GN,12473 Status
12471SWARAJ EXPRESSMGN16:25NAD18:552:30M,TH,F,SU2A,3A,SL,GN,12471 Status
19023FZR JANATA EXPMGN19:08NAD22:002:52M,TU,W,TH,F,SA,SUSL,2S,GN,19023 Status
12925PASCHIM EXPRESSMGN20:39NAD23:232:44M,TU,W,TH,F,SA,SU1A,2A,3A,SL,GN,12925 Status
Train Type Train Table Info
SuperFast
Click On Function
Headers Sort-
Background Colour Code
Train No Detail Information About Train on new tab
Train Name Route Time Table & Fare of Train 
From & To Detail Information About Station on new tab
Classes Ticket Availibility
Mail/Express
Rajdhani
Shatabdi
Janshatabdi
Garibrath/Yuva
Duronto
Spl Tourism Trains






RECENT NEWS

1
08119-03-2023
Maligaon
Meghalaya gets Electric trains for the first time; Electrification of sections between Abhayapuri – Pancharatna; Dudhnai – Mendipathar completed successfully

N.F. Railway is progressing at full throttle for achieving the Indian Railways target of becoming Net Zero Carbon Emitter by 2030. In an endeavour for complete electrification, N.F. Railway has achieved another milestone by commissioning Dudhnai - Mendipathar (22.823 Track Kilometre) single line section and Abhayapuri – Pancharatna (34.59 Track Kilometre) double line section o­n 15th March, 2023. The Central Organization for Railway Electrification (CORE) has carried out the electrification works in these sections.

 Mendipathar is the o­nly railway station in the north-eastern state of Meghalaya which is in operation since 2014 after being inaugurated by the Hon’ble Prime Minister of India. After commissioning of electric traction, trains hauled by electric locomotive will now be able to operate directly from Mendipathar in Meghalaya which will increase the average speed. More passenger & freight carrying trains will be able to operate through these sections with full sectional speeds. Punctuality will also increase in this section. Parcel & freight carrying trains hauled by electric locomotives from other states will be able to reach Meghalaya directly.

Electrification will significantly improve the mobility of trains in Northeast India.  In addition to the reduction in pollution due to the shift from fossil fuel to electricity, the efficiency of the Railway system in the region will also improve. This would facilitate seamless traffic and also save time of the trains moving to and from northeastern states apart from savings in precious foreign exchange.



(Sabyasachi De)
CPRO/N.F.Railway




2
06-12-2022
Press Release:GM/ER INSPECTED ASANSOL DIVISION AS A PART OF ANNUAL INSPECTION PROGRAMME

GM/ER INSPECTED ASANSOL DIVISION AS A PART OF ANNUAL INSPECTION PROGRAMME

Kolkata, December 5, 2022

Shri Arun Arora, General Manager, Eastern Railway inspected Asansol Division today (5.12.2022) where he visited Kunuri, Siuri, Chinpai, Dubrajpur, Pandabeswar & Andal stations & inspected passenger amenities, interacted with the gangmen, inspected points, crossings & level crossing gates, goods shed, diesel shed & BOXN Depot, conducted speed trial and interacted with media persons. Principal Heads of Departments from Headquarters along with Shri Permanand Sharma, Divisional Railway Manager, Asansol along with senior officers of Headquarters & Asansol Division were present in the inspection.

At Kunuri station, Shri Arora, GM/ER inspected the station & passenger amenities. He inaugurated renovated station master chamber, goods shed & its office. He also planted saplings at the Kunuri station concourse area. GM/ER, at Siuri station, inspected station building, level crossing gate, points & curves. He also inspected minor & major bridges in between Siuri & Chinpai stations. Later, GM/ER interacted with the media persons.

At Dubrajpur station, Shri Arora, GM/ER inspected various passenger amenities available at Dubrajpur station, level crossing gate, curve no. 5 & 9 in between Dubrajpur and Panchra stations and interacted with the gangmen no. 5. He also inaugurated Children Park at Railway colony of Dubrajpur.

At Pandabeswar station, Shri Arora, GM/ER inspected passenger amenities at the station, the TRD Depot and inaugurated renovated Crew Rest Room. Later, Shri Arora conducted speed trial over a stretch of 17.140 km in between Pandabeswar & Andal stations.

Later, GM/ER inspected crew booking lobby, Railway Health Unit, Running Room & BOXN Depot therein, inaugurated electric interlocking system at Andal station, and also inaugurated maintenance building at Diesel Shed, Andal.   

GM/ER also conducted a window trailing inspection over Kunuri – Andal section to observe the track condition and OHE equipment.

During the course of his inspection at various stations as well as in the level crossing gates, Shri Arora counselled Railway staff at different levels for even better performance in the fields of safety, security and passengers convenience. 





COMMENTS

NO Comments. Be the first to Comment...

Add Comment






Submit