For a Proper experience on Trainspy.com, enable JavaScript in your browser

Train Search








1 Trains from (PC)PACHORA JN to (RIG)RAIGARH


Address: Pachora, Maharashtra 424201, India

Station Code: PC

Station Name: PACHORA JN

Zone: CR/Central

Train Frequency Weekly: 178

Station Traffic: High

Address: Raigarh Railway Station, Raigarh, Chhattisgarh 496001, India

Station Code: RIG

Station Name: RAIGARH

Zone: SECR/South East Central

Train Frequency Weekly: 221

Station Traffic: High





Trains
To Check Ticket Availibility Click Classes
TrainTrain NameFromDepToArrTimeDaysClassesStatus
18029LTT SHALIMAR EXPC04:05RIG00:2420:19M,TU,W,TH,F,SA,SU2A,3A,SL,GN,18029 Status
Train Type Train Table Info
SuperFast
Click On Function
Headers Sort-
Background Colour Code
Train No Detail Information About Train on new tab
Train Name Route Time Table & Fare of Train 
From & To Detail Information About Station on new tab
Classes Ticket Availibility
Mail/Express
Rajdhani
Shatabdi
Janshatabdi
Garibrath/Yuva
Duronto
Spl Tourism Trains






RECENT NEWS

1
2023/05/2525-05-2023
Annual Conference of Operations department of Central Railway conducted today 24/05/23



Annual Conference of Operations department of Central Railway conducted today 24/05/23

Shri Naresh Lalwani, General Manager, Central Railway addressed the Senior Divisional Operations Manager’s Annual Conference at Mumbai HQ o­n 24.5.2023.

Shri Alok Singh, Additional General Manager and Shri Mukul Jain, Principal Chief Operations Manager, Central Railway were also present. The conference was attended by Heads of Coaching section, Planning section and Goods section of Operations Department of Central Railway and Operations Department Heads of Mumbai, Bhusawal, Nagpur, Pune and Solapur Divisions.

The targets and achievements of upcoming year 2023-24 have been discussed in conference as follows-

1) Goods loading-

In year 2021-22- 76.16 million tonne (MT) goods loading achieved by CR.

In year 2022-23- 81.88 million tonne goods loading achieved by CR.

In year 2023-24- 90.05 million tonne target of goods loading has been set by CR.

2) Coal loading -

Out of above total loading, coal is highest commodity loading.

In 2021-22- 39.52 MT loading done.

In 22-23- 37.17 MT loading done.

In 23-24- target of 40.95 MT coal loading has been set.

3) Cement loading-

In 22-23- 7.48 MT loading achieved.

In 23-24- target of 8.8 MT is set.

Major plants of Cement loading are- ACC/Wadi/Solapur, ACC/Ghuggus/Nagpur, Ultratech cement/Hotgi/Solapur, Orient cement/Bhadli/Bhusawal.

4) New infrastructures lines completed-

-Bhusawal-Jalgaon new 3rd line & 4th line of 24.13 km completed in year 2022-23.

-Jalgaon-Pachora new 3rd line of 47.59 km completed in year 2022-23.

5) New infrastructure lines under progress-

-Nagpur-Wardha 3rd& 4th line

-Bhusawal-khandwa 3rd & 4th line

-3rd line in Nagpur-Etarasi, Bhusawal-Wardha, Jalgaon-Manmad.

6) Parcel loading hubs-

Bhiwandi, Jalgaon, Ajni/Nagpur have been developed as major parcel loading points.

In 2022-23- 312 parcel train loaded with 764759 tonnage and 45.86 Crores revenue earning.

7) Improvement of goods sheds under progress-

It will be completed in this 2023-24 year. Circulating area, lighting, approach road, labour room, merchant room etc will be renewed.

-Mumbai division- Kalamboli

-Bhusawal division- Kasbe Sukane, Borgaon, Khamgaon, Savda, Burhanpur, Nandgaon

-Nagpur- Tadali, Ballarshah, Kalmeshwar, maramjhiri.

-Pune- Nira, Loni,

-Solapur- Vilad, Ahmednagar, Belapur, Daund, Arag.

8) Daily goods train interchange-

In 2021-22- 317 goods trains taken over/handed over daily by CR with other railway zones.

In 22-23- 336 goods train interchange daily by CR. It's 18.4% increase capacity handling.

9) Infrastructural works completed to increase mail express and goods train mobility-

-Electrification completed at Roha yard, Gurumarket yard/Pune div, Solapur yard, Barshi yard/Solapur yard, Bale yard/solapur div.

-OHE Overhead wire new substations completed at- Karad/Pune div, Ausa/Solapur div, Gaudgaon/Solapur div, Nagothane/Mumbai div.

10) Critical bottleneck infrastructure works completed in year 2022-23-

-Daund- Gulbarga doubling

-Wardha- Chitoda 2nd cord line

-Khapri-Nagpur-Godhani- 20 km automatic signalling system.

-Kamshet/pune div- loop lines extention.

--- --- ---

Date: May 24, 2023

PR No.2023/05/25

This press release is issued by the Public Relations Department, Central Railway, Chhatrapati Shivaji Maharaj Terminus Mumbai.



(Shivraj Manaspure)
Chief Public Relations Officer




2
09-02-2023
Rescheduling /Short Termination/Origination & Diversion of trains Due to Traffic Block over Raipur Division.

               

It is notified for the information of the general public that due to traffic block between the Raipur-Urkura Stations o­n Raipur Division of South East Central Railway, the following trains shall remain temporarily rescheduled/short terminated/originate/diverted and regulated as under:

 

Rescheduling of trains:-

SN

Train No.

Effective from JCO

01)

15159 Chhapra-Durg Exp.

09.02.23 To Be Rescheduled By 2.00 Hrs.

02)

12409 Raigarh-Hazrat Nizamuddin Exp.

 10.02.23 To Be Rescheduled By 1.00 Hrs.

03)

12808 Hazrat Nizamuddin - Visakhapatnam Exp.

 09.02.23 To Be Rescheduled By 2.00 Hrs.

 

Short Termination / Origination of trains;-

SN

Train No.

Effective from JCO

01)

15159

Chhapra -Durg Exp.

 JCO 08.02.23 short terminated at Bilaspur and shall remain partially cancelled bet Bilaspur-Durg.

02)

15160

Durg- Chhapra Exp.

JCO 09.02.23 short originated from Bilaspur and shall remain partially cancelled bet Durg-Bilaspur.

 

Diversion of trains:-

 

Train No.

Effective from JCO

15232

Gondia.Barauni Exp.

09.02.23 shall be diverted to run via Nainpur-Jabalpur- Katni in place of Gondia-Raipur- Uslapur -Katni and shall remain cancelled between Gondia - Uslapur -Katni.

-Diversion of trains due to Traffic block o­n NER

14018 Anand Vihar Terminal Raxaul Sadbhavana Express

JCO 08.02.2023 shall be diverted to run via Mankapur-Gorakhpur-Chhapra instead of Varanasi –Aunrihar-Ballia- Chhapra

19489 Ahmedabad- Gorakhpur Express

JCO 08.02.2023 shall be diverted to run via Varanasi -Jaunpur –Shahganj-Mau instead of Varanasi –Aunrihar-Mau

15017 Lokmanya Tilak Terminus-Gorakhpur Kashi Express

JCO 08.02.2023 shall be diverted to run via Janghai-Jaunpur –Shahganj-Mau instead of Janghai -Varanasi –Aunrihar-Mau

18201 Durg-Nautanwa Express

JCO 08.02.2023 shall be diverted to run via Varanasi-Janghai-Jaunpur –Shahganj-Mau instead of Varanasi –Aunrihar-Mau

11061 Lokmanya Tilak Terminus-Jaynagar Pawan Express

JCO 08.02.2023 shall be diverted to run via Varanasi-Pt. DD Upadhyaya-Danapur –Patliputra-Parmanandpur instead of Varanasi –Aunrihar-Chhapra-Sonapur