For a Proper experience on Trainspy.com, enable JavaScript in your browser

Train Search








1 Trains from (PAK)PAKALA JN to (MYA)MANDYA


Address: Pakala Junction Railway Station, Pakala, Andhra Pradesh 517112, India

Station Code: PAK

Station Name: PAKALA JN

Zone: SCR/South Central

Train Frequency Weekly: 181

Station Traffic: High

Address: Karnataka 571401, India

Station Code: MYA

Station Name: MANDYA

Zone: SWR/South Western

Train Frequency Weekly: 259

Station Traffic: High





Trains
To Check Ticket Availibility Click Classes
TrainTrain NameFromDepToArrTimeDaysClassesStatus
16220TPTY CMNR EXPPAK22:40MAD08:339:53M,TU,W,TH,F,SA,SU3A,SL,GN,16220 Status
Train Type Train Table Info
SuperFast
Click On Function
Headers Sort-
Background Colour Code
Train No Detail Information About Train on new tab
Train Name Route Time Table & Fare of Train 
From & To Detail Information About Station on new tab
Classes Ticket Availibility
Mail/Express
Rajdhani
Shatabdi
Janshatabdi
Garibrath/Yuva
Duronto
Spl Tourism Trains






RECENT NEWS

1
Press Release No. 11001-06-2023
Hubballi
Press Release No. 110, REGULATION OF TRAINS

दक्षिण à¤ªà¤¶à¥à¤šà¤¿à¤® à¤°à¥‡à¤²à¤µà¥‡ / SOUTH WESTERN RAILWAY  
प्रेस à¤µà¤¿à¤œà¥à¤žà¤ªà¥à¤¤à¤¿ / Press Release No. 110 Dt: 01.06.2023

REGULATION OF TRAINS

1. Train No. 06270 Sir M. Visvesvaraya Terminal Bengaluru – Mysuru Daily Express Special, leaving from SMVT Bengaluru o­n June 2, 9 & 16, 2023 will be regulated for 60 minutes enroute due to engineering, signal and telecommunication work o­n the Mandya Section.

2.Train No. 16586 Mangaluru Central – Sir M. Visvesvaraya Terminal Bengaluru Express, leaving from Mangaluru Central o­n June 2, 2023 will be regulated for 80 minutes enroute due to line block for replacement of existing steel girder with PSC slab between Belagula – Sagarakatte stations.

ರೈಲುಗಳ ಮಾರ್ಗ ಮಧ್ಯ ನಿಯಂತ್ರಣ

1.ಜೂನ್ 2, 9 ಮತ್ತು 16 ರಂದು ಬೆಂಗಳೂರು ನಿಲ್ದಾಣದಿಂದ ಹೊರಡುವ ರೈಲು ಸಂಖ್ಯೆ 06270 ಸರ್ ಎಂ. ವಿಶ್ವೇಶ್ವರಯ್ಯ ಟರ್ಮಿನಲ್ ಬೆಂಗಳೂರು - ಮೈಸೂರು ಎಕ್ಸ್‌ಪ್ರೆಸ್ ರೈಲನ್ನು ಮಂಡ್ಯ ವಿಭಾಗ ವ್ಯಾಪ್ತಿಯಲ್ಲಿನ ಎಂಜಿನಿಯರಿಂಗ್ ಮತ್ತು ಸಿಗ್ನಲ್ ಇಲಾಖೆ ಕಾಮಗಾರಿ ಸಲುವಾಗಿ ಮಾರ್ಗ ಮಧ್ಯದಲ್ಲಿ 60ನಿಮಿಷ ಕಾಲ ನಿಯಂತ್ರಿಸಲಾಗುತ್ತಿದೆ.

2.ಜೂನ್ 2 ರಂದು ಮಂಗಳೂರು ನಿಲ್ದಾಣದಿಂದ ಹೊರಡುವ ರೈಲು ಸಂಖ್ಯೆ 16586 ಮಂಗಳೂರು ಸೆಂಟ್ರಲ್ - ಸರ್ ಎಂ. ವಿಶ್ವೇಶ್ವರಯ್ಯ ಟರ್ಮಿನಲ್ ಬೆಂಗಳೂರು ಎಕ್ಸ್‌ಪ್ರೆಸ್ ರೈಲನ್ನು ಬೆಳಗುಳ-ಸಾಗರ ಕಟ್ಟೆ ನಿಲ್ದಾಣಗಳ ನಡುವಿನ ತುರ್ತು ಕಾಮಗಾರಿ ನಿಮಿತ್ಯ ಮಾರ್ಗ ಮಧ್ಯದಲ್ಲಿ 80 ನಿಮಿಷ ಕಾಲ ನಿಯಂತ್ರಿಸಲಾಗುತ್ತಿದೆ.

                                                                                                                               Aneesh Hegde
                                                                             Chief Public Relations Officer                                                                                                  South Western Railway, Hubballi 





2
   

SOUTH CENTRAL RAILWAY
PRESS RELEASE
PUBLIC RELATIONS OFFICE, SECUNDERABAD - 500 071
No.49/2023-2408-05-2023
Secunderabad
PR No. 49 SCR completes Record Electrification of 1,017 Route kms in 2022-23 South Central Railway Observes Electrical Safety Week

 

-Electrification done during 2022-23 is the best-ever achievement since inception of the Zone.

-The Zone is observing Electrical safety week during 03 - 09 May 2023.

South Central Railway is observing Electrical Safety Week from 03rdto 09th May, 2023 to promote electrical safety aspects and saving of electrical energy. During the safety week, seminars o­n electrical safety will be held at the divisional level and various other establishments. Special training classes are also being conducted for the electrical supervisors and staff o­n increasing awareness regarding electricity rules. Inspection of Fire audit, functioning of fire detection and fire-fighting equipment will be carried out. Posters and banners are also displayed to bring awareness o­n electrical safety.

       SCR completes Record Electrification

South Central Railway has registered its best-ever performance in electrification of its network during 2022-23. The Zone has completed 1,017 Route Kilometers (RKM) of Railway electrification works in FY 2022-23, which is an all-time record in the history of the Zone. The achievement is also the second highest RKM of Electrification done by any Zone across Indian Railways during 2022-23.

Indian Railways has accorded special focus to electrification of its network. Out of the total electrification of 1017 Rkms, 286.4 Kms fall under Telangana, 133.7 Rkms fall under Andhra Pradesh, 546 Rkms falls under Maharashtra and 50.8 Rkms pertains to Karnataka jurisdiction of SCR. The state-wise details of the Electrification completed o­n the Zone during 2022-23 are as follows:

·286.4 Rkms pertaining to Telangana region of SCR comprises of sections like Bhavanapalem – Sattupalli; Manoharabad – Nizamabad; Mahabubnagar - Alampur Road; Kosai – Ambari; Jankampet - Basar.

 

·133.7 Rkms pertaining to Andhra Pradesh region of SCR comprises of sections like Dharmavaram – Kadiri; Aravalli – Nidadavolu; New Piduguralla – Savalyapuram; Alampur - Kurnool City; Gooty Bypass cabin.

 

·546 Rkms pertaining to Maharashtra region of SCR comprise of sections like Washim – Purna; Kamalnagar – Parli; Ambari – Mudkhed; Rotegaon – Dinegaon; Parli - Parbhani.


·50.8 Rkms pertaining to Karnataka region of SCR between Khanapur - Kamalnagar.

 

Electrification of railway lines o­n such huge magnitude has also led to availability of continuous electrified rail connectivity between Secunderabad / Hyderabad to Bengaluru as well Chennai, operation of first electrified train in sections like Bhadrachalam – Sattupalli in Telangana, Dharmavaram – Pakala in Andhra Pradesh and Aurangabad to Dinagaon in Maharashtra among others

 

The electrification of rail lines helps in providing seamless movement of trains by avoiding change in traction power and reducing enroute detention of both the coaching and freight trains. It helps in improving the average speed of the trains and hence more trains can be introduced in these sections due to the enhancement of sectional capacity. It also provides an environment-friendly means of powering the trains with zero carbon emissions, while saving fuel costs at the same time.

Shri Arun Kumar Jain, General Manager, South Central Railway congratulated staff & officers of the Zone for the excellent teamwork and dedication in executing the electrification works. The General Manager stated that the pace with which the electrification works have been carried out has not o­nly helped in achieving record electrification but has also earned recognition at the National level. He said that the major portion of the SCR network is now electrified and the Zone is progressing swiftly towards achieving 100% electrification of its existing broad gauge lines over its jurisdiction.  


(Ch.Rakesh)
Chief Public Relations Officer





COMMENTS

NO Comments. Be the first to Comment...

Add Comment






Submit