For a Proper experience on Trainspy.com, enable JavaScript in your browser

Train Search








19 Trains from (MZR)MURTAJAPUR to (BGN)Borgaon


Address: Murtuzapur Junction Railway Station, Murtizapur, Maharashtra 444107, India

Station Code: MZR

Station Name: MURTAJAPUR

Zone: CR/Central

Train Frequency Weekly: 172

Station Traffic: High

Address: Akola Maharashtra

Station Code: BGN

Station Name: Borgaon

Zone: CR/Central

Train Frequency Weekly: 37

Station Traffic: Low





Trains
To Check Ticket Availibility Click Classes
TrainTrain NameFromDepToArrTimeDaysClassesStatus
12140SEVAGRAM EXPMZR00:45AK01:150:30M,TU,W,TH,F,SA,SU2A,3A,SL,GN,12140 Status
51196BPQ WR PASSMZR00:45AK01:150:30M,TU,W,TH,F,SA,SU3A,SL,GN,51196 Status
51198WR BSL PASSMZR03:57AK04:350:38M,TU,W,TH,F,SA,SUUNRESERVED51198 Status
12656NAVAJIVAN EXPMZR04:50AK05:150:25M,TU,W,TH,F,SA,SU1A,2A,3A,SL,GN,12656 Status
17642NRKR KCG EXPMZR08:10AK09:101:00M,W,TH,F,SA,SUCC,2S,GN,17642 Status
51286NGP BSL PASSMZR09:45AK10:200:35M,TU,W,TH,F,SA,SUUNRESERVED51286 Status
19026SURAT EXPRESSMZR10:00AK10:350:35M,F,SA2S,GN,19026 Status
12406GONDWANA EXPRESSMZR13:00AK13:200:20F,SU2A,3A,SL,GN,12406 Status
51184NRKR BSL PASSMZR14:16AK14:500:34M,TU,W,TH,F,SA,SUUNRESERVED51184 Status
11040MAHARASHTRA EXPMZR14:45AK15:100:25M,TU,W,TH,F,SA,SU2A,3A,SL,GN,11040 Status
18030SHM LTT EXPRESSMZR17:30AK18:000:30M,TU,W,TH,F,SA,SU2A,3A,SL,GN,18030 Status
12810HWH MUMBAI MAILMZR18:15AK18:400:25M,TU,W,TH,F,SA,SU1A,2A,3A,SL,GN,12810 Status
11403NGP KOP EXPRESSMZR18:35AK19:501:15TU,SA2A,3A,SL,GN,11403 Status
19713JP SC EXPMZR19:05AK19:500:45SA1A,2A,3A,SL,GN,19713 Status
11406AMI PUNE EXPMZR19:25AK20:251:00M,SA2A,3A,SL,GN,11406 Status
12112AMI CSMT EXPRESSMZR20:00AK20:250:25M,TU,W,TH,F,SA,SU1A,2A,3A,SL,GN,12112 Status
11202AJNI LTT EXPRESSMZR20:10AK21:201:10F2A,3A,SL,GN,11202 Status
12106VIDARBHA EXPRESMZR20:25AK20:550:30M,TU,W,TH,F,SA,SU1A,2A,3A,SL,GN,12106 Status
12834HWH ADI EXPRESSMZR22:42AK23:150:33M,TU,W,TH,F,SA,SU2A,3A,SL,GN,12834 Status
Train Type Train Table Info
SuperFast
Click On Function
Headers Sort-
Background Colour Code
Train No Detail Information About Train on new tab
Train Name Route Time Table & Fare of Train 
From & To Detail Information About Station on new tab
Classes Ticket Availibility
Mail/Express
Rajdhani
Shatabdi
Janshatabdi
Garibrath/Yuva
Duronto
Spl Tourism Trains






RECENT NEWS

1
2023/05/2525-05-2023
Annual Conference of Operations department of Central Railway conducted today 24/05/23



Annual Conference of Operations department of Central Railway conducted today 24/05/23

Shri Naresh Lalwani, General Manager, Central Railway addressed the Senior Divisional Operations Manager’s Annual Conference at Mumbai HQ o­n 24.5.2023.

Shri Alok Singh, Additional General Manager and Shri Mukul Jain, Principal Chief Operations Manager, Central Railway were also present. The conference was attended by Heads of Coaching section, Planning section and Goods section of Operations Department of Central Railway and Operations Department Heads of Mumbai, Bhusawal, Nagpur, Pune and Solapur Divisions.

The targets and achievements of upcoming year 2023-24 have been discussed in conference as follows-

1) Goods loading-

In year 2021-22- 76.16 million tonne (MT) goods loading achieved by CR.

In year 2022-23- 81.88 million tonne goods loading achieved by CR.

In year 2023-24- 90.05 million tonne target of goods loading has been set by CR.

2) Coal loading -

Out of above total loading, coal is highest commodity loading.

In 2021-22- 39.52 MT loading done.

In 22-23- 37.17 MT loading done.

In 23-24- target of 40.95 MT coal loading has been set.

3) Cement loading-

In 22-23- 7.48 MT loading achieved.

In 23-24- target of 8.8 MT is set.

Major plants of Cement loading are- ACC/Wadi/Solapur, ACC/Ghuggus/Nagpur, Ultratech cement/Hotgi/Solapur, Orient cement/Bhadli/Bhusawal.

4) New infrastructures lines completed-

-Bhusawal-Jalgaon new 3rd line & 4th line of 24.13 km completed in year 2022-23.

-Jalgaon-Pachora new 3rd line of 47.59 km completed in year 2022-23.

5) New infrastructure lines under progress-

-Nagpur-Wardha 3rd& 4th line

-Bhusawal-khandwa 3rd & 4th line

-3rd line in Nagpur-Etarasi, Bhusawal-Wardha, Jalgaon-Manmad.

6) Parcel loading hubs-

Bhiwandi, Jalgaon, Ajni/Nagpur have been developed as major parcel loading points.

In 2022-23- 312 parcel train loaded with 764759 tonnage and 45.86 Crores revenue earning.

7) Improvement of goods sheds under progress-

It will be completed in this 2023-24 year. Circulating area, lighting, approach road, labour room, merchant room etc will be renewed.

-Mumbai division- Kalamboli

-Bhusawal division- Kasbe Sukane, Borgaon, Khamgaon, Savda, Burhanpur, Nandgaon

-Nagpur- Tadali, Ballarshah, Kalmeshwar, maramjhiri.

-Pune- Nira, Loni,

-Solapur- Vilad, Ahmednagar, Belapur, Daund, Arag.

8) Daily goods train interchange-

In 2021-22- 317 goods trains taken over/handed over daily by CR with other railway zones.

In 22-23- 336 goods train interchange daily by CR. It's 18.4% increase capacity handling.

9) Infrastructural works completed to increase mail express and goods train mobility-

-Electrification completed at Roha yard, Gurumarket yard/Pune div, Solapur yard, Barshi yard/Solapur yard, Bale yard/solapur div.

-OHE Overhead wire new substations completed at- Karad/Pune div, Ausa/Solapur div, Gaudgaon/Solapur div, Nagothane/Mumbai div.

10) Critical bottleneck infrastructure works completed in year 2022-23-

-Daund- Gulbarga doubling

-Wardha- Chitoda 2nd cord line

-Khapri-Nagpur-Godhani- 20 km automatic signalling system.

-Kamshet/pune div- loop lines extention.

--- --- ---

Date: May 24, 2023

PR No.2023/05/25

This press release is issued by the Public Relations Department, Central Railway, Chhatrapati Shivaji Maharaj Terminus Mumbai.



(Shivraj Manaspure)
Chief Public Relations Officer




2
2023/02/2521-02-2023
General Manager Central Railway inspects Badnera-Bhusaval Section on Bhusaval Division


General Manager Central Railway inspects Badnera-Bhusaval Section o­n Bhusaval Division

Shri Naresh Lalwani, General Manager, Central Railway inspected Badnera-Bhusaval Section of Bhusaval o­n 20.2.2023.

The General Manager inspected the new lifts and station premises at Amravati where he also visited the coach restaurant and inspected the Sewage Treatment Plant. He also inspected the newly constructed Foot Over Bridge, new Accident Relief Train (ART) Shed, Railway Colony, Health Unit, RPF Thana (Post), Crew Lobby at Badnera. A speed trial run o­n Badnera-Takli-Kuram section was also conducted. He also inspected curve, level crossing gate o­n Murtajapur-Katepurna section, Safety & Rajbhasha exhibition at Borgaon.

The General Manager inspected the Traction Sub Station (TSS), interacted with Gang at Akola Yard. He also inspected passenger amenities, S&T Real Time Monitoring System, Electronic Interlocking (EI) Learning Centre and station premises at Akola. A speed trial run o­n Akola-Gaigaon-Paras-Shri KshetraNagjhari section, inspected Mund bridge. Inspection of o­n-line Monitoring of Rolling stock System (ORMS) o­n Malkapur-Wadoda  Section, TSS o­n Malkapur-Khamkhed Section, Limited Height Subway (LHS) o­n Khamkhed-Bodwad Section was also conducted.  The General Manager inspected the new Officers’ Transit House, Wheel Lathe Shed in Electric Loco Shed, Badminton Court at Bhusaval.

Shri SS Kedia, Divisional Railway Manager, Bhusaval Division, Principal Heads of Departments and Branch officers from Bhusaval Division were also present during the inspection.
--- ---
Date: February 20, 2023
PR No. 2023/02/25
This press release is issued by the Public Relations Department, Central Railway, Chhatrapati Shivaji Maharaj Terminus Mumbai.





(Shivaji Sutar)
Chief Public Relations Officer





COMMENTS

NO Comments. Be the first to Comment...

Add Comment






Submit