1 Trains from (MYA)MANDYA to (LD)LONDA JN
Address: Karnataka 571401, India
Station Code: MYA
Station Name: MANDYA
Zone: SWR/South Western
Train Frequency Weekly: 259
Station Traffic: High
Address: Londa Junction, Londa, Karnataka 591301, India
Station Code: LD
Station Name: LONDA JN
Zone: SWR/South Western
Train Frequency Weekly: 185
Station Traffic: High
Trains
|
||||||||||||||||||||||||||||||||||||||||||||||||||||
To Check Ticket Availibility Click Classes | ||||||||||||||||||||||||||||||||||||||||||||||||||||
|
RECENT NEWS
1
www.swr.indianrailways.gov.in- 2023-06-08
दकà¥à¤·à¤¿à¤£ पशà¥à¤šà¤¿à¤® रेलवे / SOUTH WESTERN RAILWAY STATUTORY INSPECTION OF NEWLY DOUBLED UGARKHURD – VIJAYANAGAR RAILWAY SECTION The doubling of railway track between Ugarkhurd – Vijayanagar (18.5 km) has been completed at a cost of Rs. 210 crore. Statutory inspection by Commissioner of Railway Safety is scheduled on 09.06.2023. After the inspection and compliances to various safety norms, the newly laid track will be open for railway service. The doubling is part of Londa – Miraj project sanctioned in 2015-16. The project is 100% funded by Ministry of Railways. So far, 154 km out of 186 km had been commissioned. The stretch from Londa – Ghataprabha was dedicated by Hon’ble PM in March 2023. Doubling of railway track enhances the capacity as well as safety. Not only can more number of trains be operated, but the direction of traffic is fixed (Up line and Down Line) and express / passenger trains need not wait for crossing of other trains (passenger or goods). The Newly doubled section between Ugarkhurd – Vijayanagar consists of 02 major bridges, 27 minor bridges and 2 Road Over Bridges. There are three stations namely Ugarkhurd, Vijayanagar & Shedbal. During the statutory inspection of commissioner of Railway Safety, speed trial will be carried out, therefore public are cautioned to the be careful and not trespass the railway tracks. Aneesh Hegde 2
www.swr.indianrailways.gov.in- 2023-06-01
दकà¥à¤·à¤¿à¤£ पशà¥à¤šà¤¿à¤® रेलवे / SOUTH WESTERN RAILWAY REGULATION OF TRAINS 1. Train No. 06270 Sir M. Visvesvaraya Terminal Bengaluru – Mysuru Daily Express Special, leaving from SMVT Bengaluru on June 2, 9 & 16, 2023 will be regulated for 60 minutes enroute due to engineering, signal and telecommunication work on the Mandya Section. 2.Train No. 16586 Mangaluru Central – Sir M. Visvesvaraya Terminal Bengaluru Express, leaving from Mangaluru Central on June 2, 2023 will be regulated for 80 minutes enroute due to line block for replacement of existing steel girder with PSC slab between Belagula – Sagarakatte stations. ರೈಲà³à²—ಳ ಮಾರà³à²— ಮಧà³à²¯ ನಿಯಂತà³à²°à²£ 1.ಜೂನೠ2, 9 ಮತà³à²¤à³ 16 ರಂದೠಬೆಂಗಳೂರೠನಿಲà³à²¦à²¾à²£à²¦à²¿à²‚ದ ಹೊರಡà³à²µ ರೈಲೠಸಂಖà³à²¯à³† 06270 ಸರೠಎಂ. ವಿಶà³à²µà³‡à²¶à³à²µà²°à²¯à³à²¯ ಟರà³à²®à²¿à²¨à²²à³ ಬೆಂಗಳೂರೠ- ಮೈಸೂರೠಎಕà³à²¸à³â€Œà²ªà³à²°à³†à²¸à³ ರೈಲನà³à²¨à³ ಮಂಡà³à²¯ ವಿà²à²¾à²— ವà³à²¯à²¾à²ªà³à²¤à²¿à²¯à²²à³à²²à²¿à²¨ ಎಂಜಿನಿಯರಿಂಗೠಮತà³à²¤à³ ಸಿಗà³à²¨à²²à³ ಇಲಾಖೆ ಕಾಮಗಾರಿ ಸಲà³à²µà²¾à²—ಿ ಮಾರà³à²— ಮಧà³à²¯à²¦à²²à³à²²à²¿ 60ನಿಮಿಷ ಕಾಲ ನಿಯಂತà³à²°à²¿à²¸à²²à²¾à²—à³à²¤à³à²¤à²¿à²¦à³†. 2.ಜೂನೠ2 ರಂದೠಮಂಗಳೂರೠನಿಲà³à²¦à²¾à²£à²¦à²¿à²‚ದ ಹೊರಡà³à²µ ರೈಲೠಸಂಖà³à²¯à³† 16586 ಮಂಗಳೂರೠಸೆಂಟà³à²°à²²à³ - ಸರೠಎಂ. ವಿಶà³à²µà³‡à²¶à³à²µà²°à²¯à³à²¯ ಟರà³à²®à²¿à²¨à²²à³ ಬೆಂಗಳೂರೠಎಕà³à²¸à³â€Œà²ªà³à²°à³†à²¸à³ ರೈಲನà³à²¨à³ ಬೆಳಗà³à²³-ಸಾಗರ ಕಟà³à²Ÿà³† ನಿಲà³à²¦à²¾à²£à²—ಳ ನಡà³à²µà²¿à²¨ ತà³à²°à³à²¤à³ ಕಾಮಗಾರಿ ನಿಮಿತà³à²¯ ಮಾರà³à²— ಮಧà³à²¯à²¦à²²à³à²²à²¿ 80 ನಿಮಿಷ ಕಾಲ ನಿಯಂತà³à²°à²¿à²¸à²²à²¾à²—à³à²¤à³à²¤à²¿à²¦à³†. Aneesh Hegde
COMMENTS
NO Comments. Be the first to Comment...
|