For a Proper experience on Trainspy.com, enable JavaScript in your browser

Train Search








22 Trains from (MHD)MHMDVD KHEDA RD to (SUNR)SURENDRANAGAR


Address: Mahemdabad, Gujarat 387130, India

Station Code: MHD

Station Name: MHMDVD KHEDA RD

Zone: WR/Western

Train Frequency Weekly: 275

Station Traffic: High

Address: Surendranagar Railway Station, Surendranagar, Gujarat, India

Station Code: SUNR

Station Name: SURENDRANAGAR

Zone: WR/Western

Train Frequency Weekly: 303

Station Traffic: High





Trains
To Check Ticket Availibility Click Classes
TrainTrain NameFromDepToArrTimeDaysClassesStatus
19217SAU JANATA EXPND00:56SUNR04:333:37M,TU,W,TH,F,SA,SU2A,3A,SL,GN,19217 Status
22907MAO HAPA SUP EXPND03:03SUNR06:333:30F2A,3A,SL,GN,22907 Status
12971BHAVNAGAR EXPND03:57SRGT07:313:34M,TU,W,TH,F,SA,SU2A,3A,SL,GN,12971 Status
12942PARASNATH EXPND04:07JVN07:533:46TH2A,3A,SL,GN,12942 Status
22945SAURASHTRA MAILND04:13SUNR08:043:51M,TU,W,TH,F,SA,SU1A,2A,3A,SL,GN,22945 Status
19259KCVL BVC EXPRESSND06:09JVN10:114:02TH2A,3A,SL,GN,19259 Status
11088PUNE VERAVAL EXPND06:39SUNR10:163:37TH1A,2A,3A,SL,GN,11088 Status
11464JBP SOMNATH EXPND06:51SUNR10:443:53TU,W,TH,F,SU1A,2A,3A,SL,GN,11464 Status
11466JBP SOMNATH EXPND06:51SUNR10:443:53M,SA1A,2A,3A,SL,GN,11466 Status
22940BSP HAPA EXPRESSND07:15SUNR11:003:45TH2A,3A,SL,GN,22940 Status
19576NDT OKHA EXPND09:36SUNR13:153:39SU2A,3A,SL,GN,19576 Status
16614RAJKOT EXPRESSND12:48SUNR16:293:41TH2A,3A,SL,GN,16614 Status
17018RAJKOT EXPRESSND12:48SUNR16:303:42M,TU,SA2A,3A,SL,GN,17018 Status
19201SC PBR EXPND12:48SUNR16:293:41W2A,3A,SL,GN,19201 Status
12478SVDK JAM EXPND13:19SUNR16:473:28SU2A,3A,SL,GN,12478 Status
12476SVDK HAPA EXPND13:19SUNR16:473:28M2A,3A,SL,GN,12476 Status
22961HAPA INTERCITYND16:27SUNR19:593:32MFC,CC,2S,GN,22961 Status
22959JAMNAGAR INTCITYND16:27SUNR19:593:32TU,W,TH,F,SA,SUCC,2S,GN,22959 Status
15636DWARKA EXPRESSND16:43SUNR20:243:41M2A,3A,SL,2S,GN,15636 Status
22938REWA RJT SUP EXPND16:43SUNR20:243:41M2A,3A,SL,GN,22938 Status
19015SAURASHTRA EXPBJD18:54SUNR22:453:51M,TU,W,TH,F,SA,SU3A,SL,GN,19015 Status
22963BDTS BVC SF EXPND23:04JVN02:253:21M2A,3A,SL,GN,22963 Status
Train Type Train Table Info
SuperFast
Click On Function
Headers Sort-
Background Colour Code
Train No Detail Information About Train on new tab
Train Name Route Time Table & Fare of Train 
From & To Detail Information About Station on new tab
Classes Ticket Availibility
Mail/Express
Rajdhani
Shatabdi
Janshatabdi
Garibrath/Yuva
Duronto
Spl Tourism Trains






RECENT NEWS

1
   

SOUTH CENTRAL RAILWAY
PRESS RELEASE
PUBLIC RELATIONS OFFICE, SECUNDERABAD - 500 071
No.150/2023-2414-06-2023
Secunderabad
PR No. 150 - Cyclonic Storm "Biparjoy" over the East Central Arabian Sea Precautionary measures and Action plan taken by Indian Railways

India Meteorological Department (IMD) has issued latest bulletin No. 43 (ARB/01/2023) dated 11.6.23 at 17.10 hr. As per the bulletin, the extremely severe cyclonic storm “BIPARJOY” over East Central Arabian sea is moving and may affect Saurashtra & Kutch Areas. Forecast of Cyclone “Biparjoy’ for the next 4 days commencing from 11th to 14th June” 2023 has been made over all Saurashtra area. The storm is expected to affect Saurashtra & Kutch areas. The vulnerable sections include Bhavnagar, Mahuva, Veraval to Porbandar area, OKHA to HAPA and Gandhidham area. The landfall is predicted to occur near Mandvi-Jakhau Port o­n the evening of the 14th.

Indian Railways has implemented various measures to ensure the safety and minimize the impact of the cyclone.

These include:

 

1.Activation of Disaster Management Room at the Zonal Railway headquarters and round-the-clock manning by various departments.

2.Operation of emergency control rooms at division headquarters in Bhavnagar, Rajkot, Ahmedabad, and Gandhidham.

3.Regular Monitoring of wind speed at multiple locations and instructions to regulate or stop trains if wind velocity exceeds 50 kmph. Anemometers have been installed at stations and reading of wind speed is being taken o­n hourly basis.

4.Formation of o­nline Groupsfor real-time monitoring and co-ordination.

5.Continuous monitoring of cyclone-related information o­n mausam.imd.gov.in website.

6.Availability of sufficient diesel locomotives and coaching rakes for emergency evacuation.

7.Suspension of loading of double stack containers and restriction o­n their movement.

8.Review of passenger train schedules and necessary decisions based o­n the cyclone situation.

9.Readiness of a relief train.

10.Counseling of Loco Pilots & Assistant Loco Pilots regarding safety protocols during cyclone/storm conditions. All the necessary arrangements (food, medical etc) have been done at various Running Rooms meant for crew rest.

11.Instructions to keep doors and windows of coaches open for the free passage of wind.

12.Intensive footplate inspections have been conducted for close monitoring.

13.Arrangements for the availability of fully fueled diesel locomotives and filled RCD fuel tanks back to normal operations after cyclone in case road infrastructure for RCD fuel movement is hampered.

14.Alternate communication arrangements

a.Emergency Control Room including satellite phones, FCT, and DOT phones in case of communication failure.

b.VHF sets are available for site communication

15.Alternate Power arrangements

a.Tower wagon Drivers and TRD staff of all Depot will remain o­n alert.

b.If Power grid supply gets disturb, then train services will run o­n Diesel traction.

c.On power supply failure at Junction Stations, control rooms and Major colonies, pumps etc., power supply will be given through DG sets.

16.Arrangements for Reserve Material, Machinery and Man Power.

a.Station wise details of all critical materials such as rubble, ballast, quarry dust and quarry dust o­n ground as well as o­n wheels has been prepared.

b.Loading of material in wagons has been organized and loading shall be continued at night.

c.Poclain, JCB Machines etc have been hired and arrangements for the stay of Divers have been made.

d.The details of agencies having heavy earth moving machinery, trucks, ropes, chain saw, dewatering pumps, pick up vans etc has been assessed and they have been put o­n alert.

e.Mobilization of manpower, both departmental and contractual has been done

f.3 Teams have been formed at Dwarika, Jamnagar and Surendranagar stations comprising of supervisors of various branches for better co-ordination.

17.Monitoring of Track and Bridges:

The patrolling of track and bridges is done o­n a continuous basis.

18.Monitoring COP, and FOBs

a.Prior survey and necessary securing of sheets has been done. All station platform shelters have been secured appropriately

19.The wind velocity is being measured and monitored hourly basis in order to impose traffic restrictions for movement o­n bridges (maximum wind speed of 60 Kmph). Monsoon precautions shall also be implemented fully.

20.Identification and cutting of vulnerable trees near the track.

21.Special Instructions for Safety

Special instructions for safety, including LC boom closure and withdrawal of staff from LCs functioning from porta cabins.

22.OHE and Transmission lines

Monitoring and inspection of OHE and transmission lines, liaison with electricity authorities, and provision of standby power devices.

23.Signaling and telecommunication arrangements

a.Installation of DG sets, and availability of spare parts is done

b.15 FCT, 2 satellite phones and walkie talkie sets in ART/ARMEs will be used for emergency communication.

24.Readiness of ART/ARMEs (Accident Relief Trains/Accident Relief Medical Equipment) at strategic locations. All staff has been strictly directed to use personal protection equipments like Helmets, shoes etc.

25.Security arrangements by RPF

a.The deployment of a RPSF (Railway Protection Special Force) coy (company) to assist in emergencies.

b.RPSF Company from nearby divisions have been deployed at the cyclone prone region to meet the emergency situation.

c.Officials have been advised to coordinate with, GRP, City police, Civil authorities, SDRF and NDRF in view of the cyclone and to take necessary assistance in case of emergency.

26.Arrangements For Stranded Passengers

a.Catering Stalls will remain open during cyclone affecting period with sufficient stock of water & Food materials.

b.Regular announcements will be made regarding the status of cyclone to alert passengers.

c.Help Desk is opened at various stations in the cyclone prone areas.

d.Tie up with the state transport services for shifting of passengers to their destination in case of need.

27.Medical Preparedness :

a.Ambulances and Sufficient Medicines are kept ready at Hospitals & Health Units.

b.Medical State authorities and empaneled hospitals in the cyclone area are in contact to shift patients if needed.

c.Railway Medical Team is in contact with the State Medical Team and coordinating with them and also with the Empaneled hospitals to shift patients in case of emergency.

d.Gujarat State Ambulance Toll free No. 108 alerted.

e.The other local hospitals have also been alerted to deal with casualties.

f.All doctors and paramedical staff o­n alert in Mumbai.

28.Continuous monitoring from Railway Board War Room.

 




(Ch. Rakesh)
Chief Public Relations Officer




2
13-06-2023
REGULATION OF TRAINS DUE TO UPCOMING CYCLONIC STORM “BIPORJOY”

दक्षिणपूर्वरेलवे

SOUTH EASTERN RAILWAY

प्रेसविज्ञप्ति

PRESS RELEASE

 

REGULATION OF TRAINS DUE TO UPCOMING

CYCLONIC STORM “BIPORJOY”

Kolkata, 12thJune, 2023:

 

In view of upcoming “BIPORJOY” cyclonic storm over Western Railway, the following trains will be regulated as under:

 

Cancellation of trains:

·12905 Porbandar-Shalimar Express, journey commencing o­n 14.06.2023 and 15.06.2023 will remain cancelled.

·12906 Shalimar-Porbandar Express, journey commencing o­n 16.06.2023 and 17.06.2023 will remain cancelled.

·22829 Bhuj-Shalimar Express, journey commencing o­n 13.06.2023 will remain cancelled.

 

Short Termination/Short Origination of Trains:

 

 

·22906 Shalimar-Okha Express, journey commencing o­n 13.06.2023 will be short terminated at Surendranagar.

·12949 Porbandar-Santragachi Express, journey commencing o­n 16.06.2023 will be short originated from Ahmedabad.

 

******

 






COMMENTS

NO Comments. Be the first to Comment...

Add Comment






Submit