For a Proper experience on Trainspy.com, enable JavaScript in your browser

Train Search








10 Trains from (MGS)MUGHAL SARAI JN to (MJA)MEJA ROAD


Address: Uttar Pradesh 232101, India

Station Code: MGS

Station Name: MUGHAL SARAI JN

Zone: ECR/East Central

Train Frequency Weekly: 1

Station Traffic: Low

Address: Uttar Pradesh 212305, India

Station Code: MJA

Station Name: MEJA ROAD

Zone: NCR/North Central

Train Frequency Weekly: 95

Station Traffic: Medium





Trains
To Check Ticket Availibility Click Classes
TrainTrain NameFromDepToArrTimeDaysClassesStatus
15267JANSADHARAN EXPBSB03:45HDK05:311:46SAUNRESERVED15267 Status
15004CHAURICHAURAEXPBCY04:18HDK06:572:39M,TU,W,TH,F,SA,SU1A,2A,3A,SL,GN,15004 Status
13201RJPB LTT EXPDDU04:19MNF06:181:59M,TU,W,TH,F,SA,SU2A,3A,SL,GN,13201 Status
63237DDU ALD MEMUDDU04:30BEP08:073:37M,TU,W,TH,F,SA,SUUNRESERVED63237 Status
55125MUV ALY PASSMUV06:00SDC08:402:40M,TU,W,TH,F,SA,SUUNRESERVED55125 Status
55127MUV ALY PASSMUV12:00SDC15:003:00M,TU,W,TH,F,SA,SUUNRESERVED55127 Status
75105MAU ALY DMUKDQ15:25SDC19:063:41M,TU,W,TH,FUNRESERVED75105 Status
64595DDU ALD MEMUDDU15:50BEP19:223:32M,TU,W,TH,F,SA,SUUNRESERVED64595 Status
75107MUV ALY DMUMUV16:40SDC19:062:26SUUNRESERVED75107 Status
55129MUV ALY PASSMUV17:50SDC19:562:06M,TU,W,TH,F,SA,SUUNRESERVED55129 Status
Train Type Train Table Info
SuperFast
Click On Function
Headers Sort-
Background Colour Code
Train No Detail Information About Train on new tab
Train Name Route Time Table & Fare of Train 
From & To Detail Information About Station on new tab
Classes Ticket Availibility
Mail/Express
Rajdhani
Shatabdi
Janshatabdi
Garibrath/Yuva
Duronto
Spl Tourism Trains






RECENT NEWS

1
09331-03-2023
Maligaon
Shri K. Arul Jothi takes charge of Principal Chief Security Commissioner of NFR

Shri K. Arul Jothi took charge as Inspector General cum Principal Chief Security Commissioner (IG-cum-PCSC) of Northeast Frontier Railway o­n 24th March, 2023. He is an officer from the 1995 batch of Civil Services Exam. As IG-cum-PCSC he will be the security custodian of all Railway assets, structures including track and fixtures, rolling stock, signalling gears and Railway buildings and establishments like Station premises, Booking Offices, Administrative Head Quarters etc. within the jurisdiction of N. F. Railway i.e. all north-eastern states including Sikkim and parts of West Bengal and Bihar.

Shri Jothi has wide experience of working in field over many Zonal Railways. He has worked in many sensitive areas such as Mughal Sarai, Danapur, Malda, Sealdah and Secunderabad. Earlier in the year 2017-2019 he was posted as Deputy Inspector General cum Chief Security Commissioner of N. F. Railway. Before joining as the IG-cum-PCSC of Northeast Frontier Railway, he was posted as the IG-cum-PCSC of Rail Wheel Factory based at Yelahanka, Bangalore.



(Sabyasachi De)
CPRO/N.F.Railway




2
11-01-2022
NCR makes giant stride towards electrification

उत्‍तर मध्‍य रेलवे

जनसम्‍पर्क कार्यालय

उत्‍तर मध्‍य रेलवे,प्रयागराज

पत्रांक: 11पीआर/01/2022 प्रेस विज्ञप्तिदिनांक: 10.01.2022

NCR makes giant stride towards electrification

92% of NCR’s broad gauge network is now electrified

With the electrification of Shikohabad-Mainpuri section o­n 31st December, total electrified route km in NCR now stands at 2933

Electrification of 5 major routes completed in calendar year 2021.

Aggressively pursuing towards mission 100% electrification, NCR completed a total of 216 Route Kilometer & 314 Track Kilometer of electrification between April-December'2021.

Major routes which have been electrified during first three quarters of current financial year are:

Birlanagar-Udimor (101 km)

Mahoba-Khajuraho (64 km)

Shikohabad-Mainpuri (51 km)

In addition, newly laid double line between Chaunrah-Malasa (19 km), Nandkhas-Parauna (32 km) (both part of Bhimsen-Jhansi doubling project) and third line between Babina- Jhansi (24 km) are opened along with electrification.

At present, NCR has 2933 electrified Route Km and 6313 electrified track kilometers.

·Electrification works completed in NCR during calendar year 2021 are:

1.Bharatpur- Bandikui (97.5 km)

2.Bhandai- Etawah (114 km)

3.Mahoba-Khajuraho (64 km)

4.Birlanagar-Udimor (101 km)

5.Shikohabad-Manipuri (51km)

 

In addition to above major routes, electrification works of sidings like Chunar, Churk, Meja NTPC, Shankargarh have also been completed.

As a result of massive electrification, need for traction changing from AC engine to diesel engine is now done away at these places thereby reducing detentions and increasing mobility and punctuality.

With a total broad gauge network of 3222 route kilometers in NCR, electrified route km (2933) now stands at 91% of overall broad gauge network of NCR.

Electrification of remaining routes like Khajuraho-Udaipura, Barhan-Etah and Etawah-Mainpuri-Farrukhabad is targeted to be completed this year.

 






COMMENTS

NO Comments. Be the first to Comment...

Add Comment






Submit