For a Proper experience on Trainspy.com, enable JavaScript in your browser

Train Search








6 Trains from (MFP)MUZAFFARPUR JN to (RIGA)Riga


Address: Kalambagh Road, Muzaffarpur, Bihar 842001, India

Station Code: MFP

Station Name: MUZAFFARPUR JN

Zone: ECR/East Central

Train Frequency Weekly: 549

Station Traffic: High

Address: Barahwa, Sitamarhi Bihar

Station Code: RIGA

Station Name: Riga

Zone: ECR/East Central

Train Frequency Weekly: 49

Station Traffic: Low





Trains
To Check Ticket Availibility Click Classes
TrainTrain NameFromDepToArrTimeDaysClassesStatus
75208MFP SPJ DMUMFP12:00PSZ14:552:55M,TU,W,TH,F,SA,SUUNRESERVED75208 Status
75256MFP DBG DMUMFP16:30PSZ18:452:15M,TU,W,TH,F,SA,SUUNRESERVED75256 Status
75216PPTA RXL PASSMFP16:50BGU19:082:18M,TU,W,TH,F,SA,SUUNRESERVED75216 Status
14008SADHBHAWNA EXPMFP18:15BGU19:531:38TU,TH3A,SL,GN,14008 Status
14018SADBHAVNA EXPMFP18:15BGU19:531:38W2A,3A,SL,GN,14018 Status
14006LICHCHAVI EXPMFP18:31SMI21:002:29M,TU,W,TH,F,SA,SU2A,3A,SL,GN,14006 Status
Train Type Train Table Info
SuperFast
Click On Function
Headers Sort-
Background Colour Code
Train No Detail Information About Train on new tab
Train Name Route Time Table & Fare of Train 
From & To Detail Information About Station on new tab
Classes Ticket Availibility
Mail/Express
Rajdhani
Shatabdi
Janshatabdi
Garibrath/Yuva
Duronto
Spl Tourism Trains






RECENT NEWS

1
Press Release No. 12109-06-2023
Hubballi
Press Release No. 121, MONSOON PREPAREDNESS OF SOUTH WESTERN RAILWAY

दक्षिण à¤ªà¤¶à¥à¤šà¤¿à¤® à¤°à¥‡à¤²à¤µà¥‡ / SOUTH WESTERN RAILWAY  
प्रेस à¤µà¤¿à¤œà¥à¤žà¤ªà¥à¤¤à¤¿ / Press Release No. 121 Dt: 09.06.2023

MONSOON PREPAREDNESS OF SOUTH WESTERN RAILWAY

SWR has diligently conducted comprehensive safety inspections and implemented necessary safety measures in anticipation of the forthcoming monsoon season. These proactive measures aim to prevent any harm to railway property, ensure passenger safety, and maintain uninterrupted train services. Special emphasis has been placed o­n the Ghat sections such as Sakleshpur - Subrahmanya Road in Mysuru division and Castle Rock - Kulem in Hubballi division. SWR remains committed to safeguarding the railway infrastructure and the well-being of its passengers during adverse weather conditions.

Weather Warning System:

Arrangements are in place to receive timely weather warning alerts from Indian Meteorological Department. These warnings encompass heavy rainfall and cyclone forecasts. o­n receiving the warning from IMD, the zonal central control office of SWR promptly coveys’ the same to filed units and stations 

Pre-monsoon Patrolling:

Each and every existing vulnerable location o­n the Divisions has been critically reviewed and inspected by the section engineers concerned and watchmen/patrolmen have been deputed at each such location. Efforts have been made to eliminate muck or garbage from the drainage system in track areas, especially in yards, to prevent water stagnation. All drains have been made with appropriate slopes with unobstructed outlets, ensuring that train operations remain unaffected during rainfall.

Joint inspections of electrified areas by officials have been carried out to identify trees, which during monsoon may cause damage to Overhead equipment (OHE), signals, track or any other railway installations and may obstruct traffic.  Such trees have been chopped/trimmed off for the safety of track.

Monsoon Reserve:

·The reserved stocks of boulders o­n designated bridges/locations are checked and shortfall made good.  Such monsoon reserves are available at Castle Rock, Kulem, Tinaighat, Sakleshpur, Subrahmanya Road and Chitradurga. Earthmoving equipment (Hitachi, JCB) are also available o­n standby condition at critical locations.

·The stock of boulders, ballast, sandbags etc. is loaded into total of 90 wagons and stored near flood-prone locations of SWR.

·Sufficient inventory of torches, diesel, cotton waste, fuses, match boxes, and detonators is being maintained.

·A comprehensive inventory of sleepers, rails, and other P.Way materials, at their respective locations, is updated and relief trains are prepared with the necessary scale of engineering materials. The road vehicles, including motor trollies, moped trollies, and push trollies, are maintained in optimal working condition.

Regular Co-ordination & Meeting with State/other authorities:

Railway officials keep regular co-ordination with Irrigation and State Disaster Response Force authorities during monsoon season to address prevention, preparedness, rescue, and relief issues related to all types of disasters that may impact the railway system.

Special Patrolling:

The emergency patrolling will be started o­n receipt of weather warning message. Also, stationary watchmen have been deployed for observing the water levels, drainage flow, falling of trees o­n track or any other thing obstructing the traffic.

Testing of Communication Equipment:

The walkie-talkie sets are maintained in a well-charged condition, ensuring their readiness for emergency communications. Emergency telephones are prepared and available for immediate use. Field telephones are thoroughly inspected and are always carried along the line to ensure effective communication.

Counselling Alertness to Trackman & P.Way Staff:

Watchmen have been placed for monitoring at vulnerable locations. Key men have received comprehensive training to take appropriate action, during sudden storms and water level rising near bank or at bridges. Special patrolling charts for monsoon have been prepared to check the railway track and maintain safety during the rainy season. The trackmen deputed for monsoon patrolling have been trained and counselled through intensive drives and workshops and meetings have been conducted in educating gagmen and other field staff about essential monsoon precautions.

General Manager Shri Sanjeev Kishore has directed all officers to accord first priority to safety, especially during monsoon. He has instructed the concerned engineering officials to maintain strict vigil and close coordination with local authorities to be prepared for sudden rains, storms or changes in weather conditions.  

                                                                                                                                Aneesh Hegde
                                                                             Chief Public Relations Officer                                                                                                  South Western Railway, Hubballi 





2
Press Release No. 10531-05-2023
Hubballi
Press Release No. 105, I.RESTORATION OF TRAIN SERVICES, II.DIVERSION OF TRAINS

दक्षिण à¤ªà¤¶à¥à¤šà¤¿à¤® à¤°à¥‡à¤²à¤µà¥‡ / SOUTH WESTERN RAILWAY  
प्रेस à¤µà¤¿à¤œà¥à¤žà¤ªà¥à¤¤à¤¿ / Press Release No. 105 Dt: 31.05.2023

I.RESTORATION OF TRAIN SERVICES

Due to the cancellation of power and traffic block for work o­n the road over bridge over railway portion of the Dankuni – Kharagpur section, the following trains, which were earlier notified as diverted and regulated, will now be restored and run as per their scheduled path and timings, as detailed below:

RESTORATION OF DIVERTED TRAINS:

Train Nos.

Journey commencing o­n

Earlier Notified as diverted via

Remarks

12510 Guwahati – Sir M. Visvesvaraya Terminal Bengaluru

04.06.2023,

05.06.2023,

06.06.2023 &

13.06.2023

Dankuni, Howrah and Kharagpur

Will run as per its scheduled path and timings

22502 New Tinsukia - Sir M. Visvesvaraya Terminal Bengaluru

02.06.2023 &

16.06.2023

RESTORATION OF REGULATED TRAINS:

Train Nos.

Journey commencing o­n

Earlier Notified as

Remarks

12254 Bhagalpur - Sir M. Visvesvaraya Terminal Bengaluru

31.05.2023

Regulated for 90 minutes enroute

Will run as per its scheduled timings

15228 Muzaffarpur - Sir M. Visvesvaraya Terminal Bengaluru

12.06.2023

Regulated for 90 minutes enroute

II.DIVERSION OF TRAINS

As notified by South Central Railway, the following trains will be diverted due to line block for o­n-going engineering works between Gannavaram - Mustabada and Mustabada - Gunadala o­n the Vijayawada Division, as detailed below:

Train Nos.

Journey commencing o­n

Remarks

12889 Tatanagar – Sir M. Visvesvaraya Terminal Bengaluru

02.06.2023

Will be diverted to run via Nidadavolu Jn., Bhimavaram Town, Gudivada Jn., and Vijayawada Jn.

18637 Hatia – Sir M. Visvesvaraya Terminal Bengaluru

03.06.2023

                                                                                                                               Aneesh Hegde
                                                                             Chief Public Relations Officer                                                                                                  South Western Railway, Hubballi 






COMMENTS

NO Comments. Be the first to Comment...

Add Comment






Submit