For a Proper experience on Trainspy.com, enable JavaScript in your browser

Train Search








1 Trains from (KMRD)Kalamb Road to (bsx)basar


Address: State Highway 77, Tadwale Maharashtra

Station Code: KMRD

Station Name: Kalamb Road

Zone: CR/Central

Train Frequency Weekly: 25

Station Traffic: Low

Address: Basara Railway Station, Basar, Andhra Pradesh 504101, India

Station Code: BSX

Station Name: BASAR

Zone: SCR/South Central

Train Frequency Weekly: 149

Station Traffic: Medium





Trains
To Check Ticket Availibility Click Classes
TrainTrain NameFromDepToArrTimeDaysClassesStatus
51434PVR NZB PASSDKY10:47BSX22:0111:14M,TU,W,TH,F,SA,SUUNRESERVED51434 Status
Train Type Train Table Info
SuperFast
Click On Function
Headers Sort-
Background Colour Code
Train No Detail Information About Train on new tab
Train Name Route Time Table & Fare of Train 
From & To Detail Information About Station on new tab
Classes Ticket Availibility
Mail/Express
Rajdhani
Shatabdi
Janshatabdi
Garibrath/Yuva
Duronto
Spl Tourism Trains






RECENT NEWS

1
2023/05/2525-05-2023
Annual Conference of Operations department of Central Railway conducted today 24/05/23



Annual Conference of Operations department of Central Railway conducted today 24/05/23

Shri Naresh Lalwani, General Manager, Central Railway addressed the Senior Divisional Operations Manager’s Annual Conference at Mumbai HQ o­n 24.5.2023.

Shri Alok Singh, Additional General Manager and Shri Mukul Jain, Principal Chief Operations Manager, Central Railway were also present. The conference was attended by Heads of Coaching section, Planning section and Goods section of Operations Department of Central Railway and Operations Department Heads of Mumbai, Bhusawal, Nagpur, Pune and Solapur Divisions.

The targets and achievements of upcoming year 2023-24 have been discussed in conference as follows-

1) Goods loading-

In year 2021-22- 76.16 million tonne (MT) goods loading achieved by CR.

In year 2022-23- 81.88 million tonne goods loading achieved by CR.

In year 2023-24- 90.05 million tonne target of goods loading has been set by CR.

2) Coal loading -

Out of above total loading, coal is highest commodity loading.

In 2021-22- 39.52 MT loading done.

In 22-23- 37.17 MT loading done.

In 23-24- target of 40.95 MT coal loading has been set.

3) Cement loading-

In 22-23- 7.48 MT loading achieved.

In 23-24- target of 8.8 MT is set.

Major plants of Cement loading are- ACC/Wadi/Solapur, ACC/Ghuggus/Nagpur, Ultratech cement/Hotgi/Solapur, Orient cement/Bhadli/Bhusawal.

4) New infrastructures lines completed-

-Bhusawal-Jalgaon new 3rd line & 4th line of 24.13 km completed in year 2022-23.

-Jalgaon-Pachora new 3rd line of 47.59 km completed in year 2022-23.

5) New infrastructure lines under progress-

-Nagpur-Wardha 3rd& 4th line

-Bhusawal-khandwa 3rd & 4th line

-3rd line in Nagpur-Etarasi, Bhusawal-Wardha, Jalgaon-Manmad.

6) Parcel loading hubs-

Bhiwandi, Jalgaon, Ajni/Nagpur have been developed as major parcel loading points.

In 2022-23- 312 parcel train loaded with 764759 tonnage and 45.86 Crores revenue earning.

7) Improvement of goods sheds under progress-

It will be completed in this 2023-24 year. Circulating area, lighting, approach road, labour room, merchant room etc will be renewed.

-Mumbai division- Kalamboli

-Bhusawal division- Kasbe Sukane, Borgaon, Khamgaon, Savda, Burhanpur, Nandgaon

-Nagpur- Tadali, Ballarshah, Kalmeshwar, maramjhiri.

-Pune- Nira, Loni,

-Solapur- Vilad, Ahmednagar, Belapur, Daund, Arag.

8) Daily goods train interchange-

In 2021-22- 317 goods trains taken over/handed over daily by CR with other railway zones.

In 22-23- 336 goods train interchange daily by CR. It's 18.4% increase capacity handling.

9) Infrastructural works completed to increase mail express and goods train mobility-

-Electrification completed at Roha yard, Gurumarket yard/Pune div, Solapur yard, Barshi yard/Solapur yard, Bale yard/solapur div.

-OHE Overhead wire new substations completed at- Karad/Pune div, Ausa/Solapur div, Gaudgaon/Solapur div, Nagothane/Mumbai div.

10) Critical bottleneck infrastructure works completed in year 2022-23-

-Daund- Gulbarga doubling

-Wardha- Chitoda 2nd cord line

-Khapri-Nagpur-Godhani- 20 km automatic signalling system.

-Kamshet/pune div- loop lines extention.

--- --- ---

Date: May 24, 2023

PR No.2023/05/25

This press release is issued by the Public Relations Department, Central Railway, Chhatrapati Shivaji Maharaj Terminus Mumbai.



(Shivraj Manaspure)
Chief Public Relations Officer




2
   

SOUTH CENTRAL RAILWAY
PRESS RELEASE
PUBLIC RELATIONS OFFICE, SECUNDERABAD - 500 071
No.49/2023-2408-05-2023
Secunderabad
PR No. 49 SCR completes Record Electrification of 1,017 Route kms in 2022-23 South Central Railway Observes Electrical Safety Week

 

-Electrification done during 2022-23 is the best-ever achievement since inception of the Zone.

-The Zone is observing Electrical safety week during 03 - 09 May 2023.

South Central Railway is observing Electrical Safety Week from 03rdto 09th May, 2023 to promote electrical safety aspects and saving of electrical energy. During the safety week, seminars o­n electrical safety will be held at the divisional level and various other establishments. Special training classes are also being conducted for the electrical supervisors and staff o­n increasing awareness regarding electricity rules. Inspection of Fire audit, functioning of fire detection and fire-fighting equipment will be carried out. Posters and banners are also displayed to bring awareness o­n electrical safety.

       SCR completes Record Electrification

South Central Railway has registered its best-ever performance in electrification of its network during 2022-23. The Zone has completed 1,017 Route Kilometers (RKM) of Railway electrification works in FY 2022-23, which is an all-time record in the history of the Zone. The achievement is also the second highest RKM of Electrification done by any Zone across Indian Railways during 2022-23.

Indian Railways has accorded special focus to electrification of its network. Out of the total electrification of 1017 Rkms, 286.4 Kms fall under Telangana, 133.7 Rkms fall under Andhra Pradesh, 546 Rkms falls under Maharashtra and 50.8 Rkms pertains to Karnataka jurisdiction of SCR. The state-wise details of the Electrification completed o­n the Zone during 2022-23 are as follows:

·286.4 Rkms pertaining to Telangana region of SCR comprises of sections like Bhavanapalem – Sattupalli; Manoharabad – Nizamabad; Mahabubnagar - Alampur Road; Kosai – Ambari; Jankampet - Basar.

 

·133.7 Rkms pertaining to Andhra Pradesh region of SCR comprises of sections like Dharmavaram – Kadiri; Aravalli – Nidadavolu; New Piduguralla – Savalyapuram; Alampur - Kurnool City; Gooty Bypass cabin.

 

·546 Rkms pertaining to Maharashtra region of SCR comprise of sections like Washim – Purna; Kamalnagar – Parli; Ambari – Mudkhed; Rotegaon – Dinegaon; Parli - Parbhani.


·50.8 Rkms pertaining to Karnataka region of SCR between Khanapur - Kamalnagar.

 

Electrification of railway lines o­n such huge magnitude has also led to availability of continuous electrified rail connectivity between Secunderabad / Hyderabad to Bengaluru as well Chennai, operation of first electrified train in sections like Bhadrachalam – Sattupalli in Telangana, Dharmavaram – Pakala in Andhra Pradesh and Aurangabad to Dinagaon in Maharashtra among others

 

The electrification of rail lines helps in providing seamless movement of trains by avoiding change in traction power and reducing enroute detention of both the coaching and freight trains. It helps in improving the average speed of the trains and hence more trains can be introduced in these sections due to the enhancement of sectional capacity. It also provides an environment-friendly means of powering the trains with zero carbon emissions, while saving fuel costs at the same time.

Shri Arun Kumar Jain, General Manager, South Central Railway congratulated staff & officers of the Zone for the excellent teamwork and dedication in executing the electrification works. The General Manager stated that the pace with which the electrification works have been carried out has not o­nly helped in achieving record electrification but has also earned recognition at the National level. He said that the major portion of the SCR network is now electrified and the Zone is progressing swiftly towards achieving 100% electrification of its existing broad gauge lines over its jurisdiction.  