For a Proper experience on Trainspy.com, enable JavaScript in your browser

Train Search








0 Trains from (JYG)JAYNAGAR to (AII)AJMER JN


Address: Jaynagar Railway Station, Jaynagar, Bihar 847226, India

Station Code: JYG

Station Name: JAYNAGAR

Zone: ECR/East Central

Train Frequency Weekly: 153

Station Traffic: High

Address: Ajmer Junction, Ajmer, Rajasthan 305001, India

Station Code: AII

Station Name: AJMER JN

Zone: NWR/North Western

Train Frequency Weekly: 425

Station Traffic: High





Trains
To Check Ticket Availibility Click Classes
Since no Direct Trains Try Nearest Via Stations
Nearest From (JYG)JAYNAGAR
(spj)samastipur jn 89Kms from (JYG)JAYNAGAR
(mfp)muzaffarpur jn 93Kms from (JYG)JAYNAGAR
(kgg)khagaria jn 125Kms from (JYG)JAYNAGAR

Nearest From AII
(ndls)new delhi 352Kms from (AII)AJMER JN
(dli)delhi 354Kms from (AII)AJMER JN
(gzb)ghaziabad 368Kms from (AII)AJMER JN
Train Type Train Table Info
SuperFast
Click On Function
Headers Sort-
Background Colour Code
Train No Detail Information About Train on new tab
Train Name Route Time Table & Fare of Train 
From & To Detail Information About Station on new tab
Classes Ticket Availibility
Mail/Express
Rajdhani
Shatabdi
Janshatabdi
Garibrath/Yuva
Duronto
Spl Tourism Trains






RECENT NEWS

1
08-06-2023
REGULATION OF TRAINS (BULLETIN-43)

दक्षिण पूर्व à¤°à¥‡à¤²à¤µà¥‡

SOUTH EASTERN RAILWAY

प्रेस विज्ञप्ति

PRESS RELEASE

BULLETIN-43

Page 1 of 2

REGULATION OF TRAINS

Kolkata, 8thJune, 2023:

 

The following trains will be regulated o­n 09.06.2023 and10.06.2023due to track maintenance works at Bahanaga Bazar Station of Kharagpur-Bhadrak Section in Kharagpur Division.

 

Cancellation of Trains:

 

Sl. No.

Train No.

Train Name

Cancelled o­n

01. 

12821

Shalimar-Puri Dhauli Express

09.06.2023

02. 

08411

Balasore-Bhubaneswar Special

10.06.2023

03. 

08415

Jaleswar-Puri MEMU Special

10.06.2023

04. 

12891

Bangriposi-Puri Superfast Express

10.06.2023

05. 

18021

Khargpur-Khurda Road Express

10.06.2023

06. 

12821

Shalimar-Puri Dhauli Express

10.06.2023

07. 

08031

Balasore-Bhadrak MEMU Special

10.06.2023

08. 

18045

Shalimar-Hyderabad East Coast Express

10.06.2023

09. 

20889

Howrah-Tirupati Humsafar Express

10.06.2023

10. 

12073

Howrah-Bhubaneswar Jan Shatabdi Express

10.06.2023

11. 

12277

Howrah-PuriShatabdi Express

10.06.2023

12. 

12841

Shalimar-MGR Chennai Central Coromandal Express

10.06.2023

13. 

18037

Kharagpur-Jajpur Keonjhar Road Express

10.06.2023

14. 

18043

Howrah-Bhadrak Express

10.06.2023

15. 

18409

Shalimar-Puri Sri Jagannath Express

10.06.2023

16. 

18044

Bhadrak-Howrah Express

10.06.2023

17. 

18038

Jajpur Keonjhar Road-Kharagpur Express

10.06.2023

2
2023/05/2323-05-2023
General Manager reviews monsoon preparations - Central Railway gears up with monsoon preparations


General Manager reviews monsoon preparations

Central Railway gears up with monsoon preparations

Shri Naresh Lalwani, General Manager, Central Railway reviewed the monsoon preparations of Central Railway. Shri Alok Singh, Additional General Manager, Central Railway, Shri Rajnish Kumar Goyal, Divisional Railway Manager, Mumbai Division and Principal Head of Departments of civil engg, electrical, signalling  were also present.

The details of measures taken for ensuring uninterrupted services are as under-

1)More Water Pumps

24 vulnerable locations identified. 166 pumps will be provided at these locations. Railways will be providing 120 High Power pumps, 15 Normal pumps and Municipal Corporation of Greater Mumbai will be providing the balance 31 pumps. This year the capacity of pumps and nos. of pumps have been increased between 12.5 HP to 100 HP.  The locations identified o­n main line are Masjid, Mazgaon yard, Byculla, Chinchpokli, Currey Road, Parel, Dadar, Matunga, Sion, Kurla, Vikhroli, Kanjurmarg, Bhandup, Mulund and o­n Harbour line are Sewri, Vadala, Guru Tegh Bahadur Nagar, Chunabhatti, Tilak Nagar etc.

2)Micro tunnelling-

Micro tunnelling has been provided at 8 locations such as Masjid, Sandhurst Road, Dadar-Parel area, Matunga-Sion area, Kurla Car Shed, Tilak Nagar nallah, Diva and Kalva. Micro tunneling work is in progress at 2 new locations in Thane-Kalva and Kalva-Mumbra section.

3)Desilting of drains-

Central Railway has targeted de-silting and cleaning of 118.48 kms of drains o­n its suburban section of which, work has been completed for 102.39 kms and work is presently in progress o­n cleaning of another 16 kms of drains.

4)Cleaning of culverts-

CR has cleaned 88 culverts o­n its suburban sections, and work is presently in progress o­n cleaning of 17 more culverts. Culvert Augmentation work by insertion of RCC box done at Kurla-Trombay area, Chunabhatti, Wadala Road, Vidyavihar-LTT area and Tilak Nagar.

5)Trimming of Trees-

Work of cutting and trimming of 43 trees has been done and work is in progress of 23 trees.

6)Muck removal-

Central Railway has set a target of cleaning and removal of 62,000 cubic meters of muck o­n Main lines.

7)Lifting of tracks-

47.8 km track lifting planned, it will be completed till next month.

     8) Works done in Ghat Section-

         -45 meters of Tunnel Portal

         -300 mts of Rockfall Barrier

         -500 sq mts of Boulder Netting

         -40 mts of Canadian Fencing

         -160 mts of Stabilization of banks

         -tunnel sounding- 18 locations

9)Separate pumps will be provided for RUBs- at 14 locations.

10)Reserve boulders and stone dust kept ready in case of unusuals- 7300 cubic meter boulders and 3500 cubic meter sand dust/gravel will be kept ready as reserve.

11)Other Important works in progress-

·Pre-monsoon water proof cable meggering- almost 83% work completed, balance will be completed in 1 week.

·Provision of CCTVs and telephones at 31 Static Watchman Hut in ghat sections.

·Waterproof point motor machines provided at- 277 locations.

·AWS (Auxillary warning system) magnets sealing work for 1506 locations will be completed in this month.

·Installation of flood gates at Masjid, Byculla, Matunga and Sion-Kurla areas.

·Bunter Bhavan nallah at LTT to be connected by removing encroachments.

·Karve nagar nallah improvement work to be done by MCGM and cost to be recovered from Ajmera builders.

·Appointment of consultant for work of clearing of concrete deposited below water mains at Priyadarshini, Chunabhatti.

12)OHE- overhead wire- thermographic checking completed at 1239 track KMs. Thermo vision camera checking of conductor and other parts of OHE is completed.

13)24X7 Control Room- CR Control office, working round the clock, will keep close liaison with Meteorological Department, Disaster Management cell and staff deputed at flood prone areas for continuous monitoring and constant updates.

14)Hourly monitoring- of rainfall and water level above track is taken by control office from field staff during monsoon period.

15)Close coordination with state govt, BMC, TMC, NMMC- Regular meetings conducted between railways and state officials, till now 4 meetings done with municipal commissioner/AMC/Chief engineer. A hotline also created between railways and MCGM disaster cell, TMC, NMMC.

--- --- ---

Date: May 23, 2023

PR No. 2023/05/23

This press release is issued by the Public Relations Department, Central Railway, Chhatrapati Shivaji Maharaj Terminus Mumbai



(Shivraj Manaspure)
Chief Public Relations Officer





COMMENTS

NO Comments. Be the first to Comment...

Add Comment






Submit