For a Proper experience on Trainspy.com, enable JavaScript in your browser

Train Search








6 Trains from (JIR)Jira Road to (dlj)dhola jn


Address: Jira - Borala - Junavasar Rd, Borala, 364521 Gujarat

Station Code: JIR

Station Name: Jira Road

Zone: WR/Western

Train Frequency Weekly: 25

Station Traffic: Low

Address: Dhola, Gujarat 364320, India

Station Code: DLJ

Station Name: DHOLA JN

Zone: WR/Western

Train Frequency Weekly: 138

Station Traffic: Medium





Trains
To Check Ticket Availibility Click Classes
TrainTrain NameFromDepToArrTimeDaysClassesStatus
22990MHV BDTS S FASTLMO14:23DLJ15:241:01F2A,3A,SL,GN,22990 Status
12945MAHUVA EXPRESSSVKD15:08ALMR16:081:00W3A,SL,GN,12945 Status
59226MHV BVC PASSLMO16:07DLJ17:351:28M,TU,W,TH,F,SA,SUUNRESERVED59226 Status
59236MHV DLJ PASSLMO19:28DLJ20:501:22M,TU,W,TH,F,SA,SUUNRESERVED59236 Status
12946SURAT EXPRESSLMO21:19DLJ22:100:51W3A,SL,GN,12946 Status
22994MHV BDTS SUP EXPLMO21:46DLJ22:350:49TU2A,3A,SL,GN,22994 Status
Train Type Train Table Info
SuperFast
Click On Function
Headers Sort-
Background Colour Code
Train No Detail Information About Train on new tab
Train Name Route Time Table & Fare of Train 
From & To Detail Information About Station on new tab
Classes Ticket Availibility
Mail/Express
Rajdhani
Shatabdi
Janshatabdi
Garibrath/Yuva
Duronto
Spl Tourism Trains






RECENT NEWS

1
30-01-2023
Press Release:LIMITED HEIGHT SUBWAY CONSTRUCTED BETWEEN AMBIKA KALNA AND JIRAT

LIMITED HEIGHT SUBWAY CONSTRUCTED BETWEEN AMBIKA KALNA AND JIRAT

Kolkata, January 30, 2023:

As a part of Eastern Railway’s continuous endeavour of increasing sectional speed by replacing level crossing in a mission mode, construction work for Limited Height Subway in lieu of Level Crossing Gate no. 7/3 between Ambika Kalna and Jirat stations of Bandel – Katwa section has been completed o­n 29.01.2023 (Sunday). The traffic and power block was taken for this work from 06:30 hrs to 19:30 hrs but due to well-coordinated and planned work of various departments, the work was completed at 17:00 hrs o­nly, i.e., 2½ hours before scheduled time and the traffic and power block was subsequently cancelled to resume normal traffic.

Construction of this Limited Height Subway will not o­nly increase sectional speed by increasing average speed of mail/express, passenger trains as well as goods trains but also ensure safety for both rail and road traffic. Besides, construction of this LHS will provide more operational flexibilities and at the same time it will significantly bring down green-house gas emission in the locality by diminishing bunching of road traffic.

In the shadow of this traffic block, various other capacity enhancement works like maintenance of points and crossing, overhauling of level crossing gates and improvement of level crossing road surface etc. over Bandel – Katwa section were successfully accomplished.




2
24-01-2023
Press Release:ER CONSTRUCTED ANOTHER LIMITED HEIGHT SUBWAY BETWEEN JIRAT AND GUPTIPARA STATIONS

ER CONSTRUCTED ANOTHER LIMITED HEIGHT SUBWAY BETWEEN JIRAT AND GUPTIPARA STATIONS

Kolkata, January 23, 2023:


In accomplishment of Eastern Railway's mission  of increasing sectional speed by replacing level crossings, construction wing of ER's Howrah Division completed the construction work for a Limited Height Subway (LHS) in replacement of Level Crossing Gate No. 6/2 between Jirat and Guptipara stations in Bandel - Katwa section. The construction work for this LHS completed o­ne hour before the scheduled duration of  traffic and power block was taken for this purpose o­n 22.1.2023,  which was possible due to better planning and perfect coordination in between various departments of Eastern Railway at work site.

Nine (09) precast reinforced cement concrete segments of size 7.2m×5.85m were placed safely to complete the tunnel of the LHS. Construction of this Limited Height Subway will not o­nly enhance sectional speed by increasing average speed of Mail/Express as well as Goods trains but also ensure safety for both Rail and Road traffic. Besides, early construction of this LHS will provide more operational flexibilities and at the same time it will significantly bring down green house gas in the locality by diminishing bunching of road traffic.

  In shadow of this traffic block, various other capacity building and safety related work were also accomplished for the sake of  seamless train operations by minimising the need for separate traffic block.





COMMENTS

NO Comments. Be the first to Comment...

Add Comment






Submit